Section 303 — Road Reconditioning
Description
303.01This work consists of reconditioning ditches, shoulders, roadbeds, aggregate surfaces, and roadways.
Material
303.02Conform to the following Subsection: Water for construction 725.01(c)
Construction Requirements
303.03General. Dispose of waste at designated sites or according to Subsection 204.14.
303.04Ditch Reconditioning. Remove slide material, sediment, vegetation, and other debris from existing ditches and culvert inlets and outlets. Resha pe ditches and culvert inlets and outlets to achieve positive drainage and uniform ditch width, depth, and grade or as shown in the plans.
303.05Shoulder Reconditioning. Remove slide material, vegetation, and other debris from existing shoulders including shoulders in parking areas, turnouts, and other widened areas. Repair soft and unstable areas according to Subsection 204.07 . Reshape sho ulders to the widths and slopes shown in the plans.
303.06Roadbed Reconditioning. Remove organic, deleterious, and material larger than 6 inches from the top 6 inches of subgrade. Repair soft and unstable areas according to Subsection 204.07. Scarify surface to a 6 -inch depth. Remove irregularities and shape to a uniform surface. Finish earth surfaces to within 0.05 feet and rock surfaces to within 0.10 feet of required line, grade, and cross -section. Compact according to Subsection 204.11.
303.07Aggregate Surface Reconditioning. Repair soft and unstable areas to the full aggregate surface depth and according to Subsection 204.07. Scarify to the depth of aggregate surfacing shown in the plans. If no depth is indicated in the plans, scarify to a 6- inch depth. Remove irregularities and shape to a uniform surface. Compact and finish the surface according to Subsections 301.05 and 301.06.
303.08Roadway Reconditioning. Perform applicable work described in Subsections 303.03 through 303.07. Maintain existin g cross slope and crown or shape and grade as shown in the plans.
303.09Acceptance. See Table 303-1 for sampling, testing, and acceptance requirements. Road reconditioning work will be evaluated under Subsections 106.02 and 106.04.
Measurement
303.10Measure the Section 303 pay items listed in the bid schedule according to Subsection 109.02 .
Payment
303.11The accepted quantities will be paid at the contract price per unit of measurement for the Section 303 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05 . Table 303-1 Sampling, Testing, and Acceptance Requirements
Material or
Product
(Subsection) Type of
Acceptance
(Subsection) Characteristic Category Test Methods
Specifications Sampling
Frequency Point of
Sampling Split
Sample Reporting
Time Remarks
Production
Existing
roadbed material or aggregate surfacing Measured & tested for conformance (106.04 ) Classification – AASHTO M 145 1 per soil type Roadbed Yes Before using in work –
Moisture -
density – AASHTO T 180, Method D(1) or AASHTO T 99, Method C(1) 1 per mixture & change in material Processed material No " – Density – AASHTO T 310 or other approved procedures 1 per 2000 yd2
In-place
after compaction " End of shift For
Subsection
204.11(c) cases only
Process
control (153.03 ) Moisture content (in-place) – AASHTO T 310 or other approved procedures 1 per 2000 yd2
In-place
after compaction No End of shift −
Finished Product
Aggregate
surface reconditioning (303.07) Measured & tested for conformance (106.04 ) Surface tolerance & grade – Subsection
301.06As directed Surface of final course No Before placement of next lift or as requested −
(1)At least 5 points per proctor.