Section 601 — Minor Concrete

Division 600 — Incidental Construction|PDF pages 690–695

Description

601.01This work consists of constructing minor concrete.

Material

601.02Conform to the following Section and Subsections: Coarse aggregate for concrete 703.02 Color coating 725.15 Concrete curing material and additives 711 Fine aggregate for concrete 703.01 Hydraulic ce ment 701.01 Penetrating stain for concrete 719.05 Pozzolans 701.03 Reinforcing steel 709.01 Sealants, fillers, and seals 712.01 Water for cementitious materials 725.01(a)

Construction Requirements

601.03Composition (Concrete Mix Design). Conform to Table 601-1. Before batching concrete, submit the proposed concrete proportions for approval on Form FHWA 1606, Minor Portland Cement Concrete Mix Design or other approved form. As a minimum, submit the following at least 30 days before production:

(a)Concrete. Include the following in each mix design submittal:

(1)Type and sources of material;

(2)Material certification for material;

(3)Saturated surface dry mass of the fine and coarse aggregate per cubic yard of concrete;

(4)Gradation of fine and coarse aggregate;

(5)Mass of mixing water per cubic yard of concrete;

(6)Mass of cement per cubic yard of concrete. Fly ash, ground iron blast -furnace slag, or silica fume (micro -silica) may be substituted for cement according to Table 552-2;

(7)Entrained air conte nt of plastic concrete in percent by volume; and

(8)Maximum slump of plastic concrete in inches.

(b)Integral colored admixture. If integral color admixture is used, prepare five 2 - by 2-foot test panels. Construct the test panels using the proposed mix design. D etermine coloring agent batch amounts by weight. Use variable quantities of coloring agent as approved. Provide additional mixing 673 time according to the manufacturer ’s recommendations. Cure the test panels similar to the structure. Transport the panels to a n approved location. Provide at least 2 weeks outside exposure. The CO will select the acceptable test panel. Use the same rate of integral color admixture for the item of work. Table 601-1

Composition of Minor Concrete

Property Specification

Water to cementitious material ratio 0.49 maximum Air content 4% minimum Size of coarse aggregate AASHTO M 43 with 100% passing the 1½-in sieve 28-day compressive strength 4000 psi minimum

601.04General. Excavate and backfill according to Section 209. Design and construct forms that are free of bulge and warp and allow for removal without injuring the concrete. Design the forms for a lateral pressure equal to that exerted b y a fluid weighing 150 pounds per cubic foot. Use wood, metal, or other suitable material for forms. Keep forms clean and coat with a form release agent or form oil before placing concrete. Place and fasten reinforcing steel according to Subsection 554.08.

601.05Placing Concrete. Conform to Subsection 552.07. Moisten the forms and foundation immediately before placing concrete. Discharge concrete within the time limit shown in Table 552-5. Place concrete to avoid segregation of material. Consolidate with vibrators according to Subsection 552.08(c) . Do not use aluminum pipe for transporting or placing concrete. Do not exceed 30 minutes bet ween deliveries of batches for a single pour on a structure. Do not apply water to plastic concrete surfaces during finishing operations.

601.06Curing and Finishing of Concrete. Cure concrete at least 7 days. Cure according to Subsection 552.13. Finish exposed concrete surfaces according to Subsection 552.14 as applicable. Do not place backfill against concrete unti l 80 percent of the design strength is attaine d. Construction loads less than 4000 pounds may be placed on the concrete when 80 percent of the design strength is attaine d. Remove and replace cracking, spalling, or scaling concrete to the nearest joint.

601.07Acceptance. See Table 601-2 for sampling, testing, and acceptance requirements. Material for minor concrete including concrete, reinforcing steel, and structural steel for minor structures will be evaluated under Subsections 106.02 and 106.03. The concrete mixture’s den sity, air content, slump, temperature, and compressive strength will be evaluated under Subsections 106.02 and 106.04. 674 Construction of minor concrete will be evaluated under Subsections 106.02 and 106.04. Excavation and backfill will be evaluated under Section 209.

Measurement

601.08Measure the Section 601 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable: When concrete is measured by the cubic yard, measure in the structure.

Payment

601.09The accepted quantities will be paid at the contract price per unit of measurement for the Section 601 pay items li sted in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05 . Table 601-2 Sampling, Testing, and Acceptance Requirements

Material or

Product

(Subsection) Type of

Acceptance

(Subsection) Characteristic Category Test Methods

Specifications Sampling

Frequency Point of

Sampling Split

Sample Reporting

Time Remarks

Source

Aggregate

(fine & coarse) Measured & tested for conformance (106.04 & 105) Quality − Subsections

703.01&

703.021 per material type Source of material Yes Before producing −

Mix Design

Concrete

composition (601.03 ) Measured & tested for conformance (106.04 & 105) All − Subsection

601.031 per mix design Source of material If requested Before producing −

Production

Concrete(1) Measured & tested for conformance (106.04 ) Density − AASHTO T 121 1 per load after 0.25 yd3 minimum is discharged(4) Point of discharge

No Upon

completing tests − Air content − AASHTO T 152 or AASHTO T 196 " " " " − Slump − AASHTO T 119 " " " " − Temperature − ASTM C1064 " " " " −

Compressive

Strength(2),(3) (28-day) − AASHTO R 100 & T 22 1 set per 30 yd3 but not less than 1 per day " Yes 28 days Deliver verification cylinders to the CO or designated laboratory for scheduled testing Table 601- 2 (continued) Sampling, Testing, and Acceptance Requirements

(1)Sample according to AASHTO R 60, except composite samples are not required.

(2)Cast at least four compressive strength test cylinders for 6 - by 12 -inch specimens or six compressive strength cylinders for 4 - by 8-inch and carefully transport the cylinders to the job site curing facility.

(3)A single compressive strength test result is the average result from two 6 - by 12 -inch or three 4 - by 8-inch cylinders cast from the same load.

(4)If three successive sa mples are tested and compliance to the specifications is indicated, screening tests may be reduced to an approved frequency. Resume Table 601-2 testing frequency if a test shows a failing temperature, air content, slump, or when directed.