Section 606 — Corrugated Metal Spillways

Division 600 — Incidental Construction|PDF pages 708–709

Description

606.01This work consists of providing and installing corrugated metal spillways.

Material

606.02Conform to the following Section: Metal pipe 707

Construction Requirements

606.03Placing Corrugated Metal Spillways. Spillway, inlet, outlet, and connector dimensions and proportions may vary to allow the use of the manufacturer’s standard jigs and templates. Install spillway inlet assemblies as shown in the plans and consolidate the earth backfill by tamping. Excavate and backfi ll according to Section 209. Lay spillway outlet pipe according to Section 602. Anchor the spillway as shown in the plans.

606.04Acceptance. Pipes, anchor assemblies, hardware, and other material provided to fabricate metal spillways will be evaluated under Subsections 106.02 and 106.03. Construction of corrugated metal spillways will be evaluated under Subsections 106.02 and 106.04. Excavation and backfill will be evaluated under Section 209. Spillway inlet pipe will be evaluated under Section 602.

Measurement

606.05Measure the Section 606 pay items listed in the bid schedule according to Su bsection 109.02 .

Payment

606.06The accepted quantities will be paid at the contract price per unit of measurement for the Section 606 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05 .