SECTION 111 DISADVANTAGED BUSINESS ENTERPRISE (DBE)
113.01 General.
The bituminous material weight tickets for this project shall be electronic tickets (eTickets) sent to the Department’s Electronic Ticketing Portal (Portal) as they are generated. The Contractor can connect to the Portal either directly from the plant’s computer system, at no cost to the Contractor, or via an intermediary system. For eTickets not transmitted directly from the plant’s computer system to the Portal, the Department may require an audit trail in addition to all required fields. Transmit tickets at or near the time of dispatch. Each eTicket shall, as a minimum, contain the items below and must be mapped to their corresponding fields. Loads which do not have the required items, in their respective fields, shall be rejected. Item Description Field Name in Portal 1 Name of Contractor Customer Name 2 Material Producer Supplier 3 Project Number Job or Job # 4 County Job or Job # 5 Truck Number Truck 6 Contract Item Number Product 7 Item name Product Description 8 Date and time of loading Created/Printed at 9 Weighmaster Name Weighmaster 10 Gross, tare, and net weights Gross, tare, and net weights 11 Load Count Load 12 Daily Running Total Daily Total
113.02 Testing.
The Contractor shall conduct a test of each supplier’s integration with the Portal prior to shipping material. The test shall be completed at least 14 calendar days prior to shipping material unless otherwise approved by the Engineer. The test must involve test eTickets from each supplier approved for use on the project. After the Engineer confirms the test has been entered into the Portal, void the eTickets with the reason “Test Ticket”. The test eTickets must accurately reflect the required data.
113.03 Paper Tickets.
The Contractor shall continue to produce paper tickets with each truck load and may be collected by the Engineer at any time due to system failures, bad cell service, or lack of reliability due to inaccuracy or inconsistency of the data provided. If not collected with each load, The Engineer may also request copies of the corresponding paper tickets at the end of each paving day. The Contractor may make a written request to the Engineer to waive the requirement to produce paper tickets. The written request shall include a backup plan to be used in the event the eTicket system fails. 113.04 Method of Measurement. Electronic Ticketing will not be measured separately for payment. SECTION 201 CLEARING AND GRUBBING
Division 200
EARTHWORK SECTION 201 CLEARING AND GRUBBING
201.01 Description.
Clearing and grubbing shall be the removal and disposal of vegetation (trees, shrubs, vines, stumps, roots, etc.) and other objects (trash, refuse, debris, etc.) within designated limits.
201.02 Materials.
Herbicides allowed for use shall be approved by the Department. Only herbicides listed in the ALDOT "Manual for Roadside Vegetation Management" shall be used.
201.03 Construction Requirements.