the application of any mixture to eliminate the potential of oversized and deleterious materials.
b.Mineral Filler. The mineral filler may be any recognized brand of non-air entrained Portland cement or hydrated lime that is free of lumps, or any other mineral additive approved by the Engineer. It shall be accepted upon visual inspection. The amount of mineral filler needed shall be determined by the laboratory mix design and shall be considered as part of the material gradation requirement. The mineral filler shall not exceed 3% of the weight of the aggregate and shall have a mixture control tolerance of ±0.25%.
403.03 Composition of Mixture.
a.Constituents The Micro-Surfacing material shall be a uniform mixture of aggregate, polymer modified emulsified asphalt, mineral filler, water and other additives as required to control set time in the field. The Engineer will require immediate adjustments or replacement of any constituent as needed to produce SECTION 403 MICRO-SURFACING SEAL COAT an acceptable mixture. The constituents shall be proportioned to produce a uniform mixture meeting the requirements of Table No. 1. TABLE NO. 1 MICRO-SURFACING DESIGN LIMITS GRADATION REQUIREMENTS Mixture Control Tolerances Sieve Size Percent Passing Type II Type III 0 % 3/8 inch 100 100 5 % No. 4 90 – 100 70 – 90 5 % No. 8 65 – 90 45 – 70 5 % No. 16 45 – 70 28 – 50 5 % No. 30 30 – 50 19 – 34 5 % No. 50 18 – 30 12 – 25 3 % No. 100 10 – 21 7 – 18 2 % No. 200 5 – 15 5 – 15 DESIGN REQUIREMENTS 0.75 % Range for Residual Asphalt 6.0 – 10.0 5.0 – 9.0 Specification Test Method Mixing Time Test, secs @ 77° F (25° C), 120 minimum ISSA TB 102 Mix Time @ 50 and 100° F (10° C and 37.7° C) (informational) ISSA TB 102 Set Time Tests: 30 minutes 12 kg-cm minimum ISSA TB 139 Early Rolling Traffic Time: 60 minutes, 20 kg-cm minimum ISSA TB 139 Wet Stripping Test, % coating 90% minimum ISSA TB 114 Wet Track Abrasion Test, loss in g/ft2 (g/m2) 75 (800) max 6 days 50 (538) max. 1 hour ISSA TB 100 Measurement of Excess Asphalt Max. 50 grams/ft2 (540 grams/m2) Sand Adhesion, 1,000 Cycles @ 125lbs. (57 kgs) ISSA TB 109 Classification Compatibility 11 pt. minimum ISSA TB 144 Note 1: Percent residual asphalt based on weight of dry aggregate. Note 2: Type II for spread rates of 10 - 20* pounds per square yard based on dry aggregate weight. Note 3: Type III for spread rates of 15 – 30* pounds per square yard based on dry aggregate weight. Note 4: If more than 30 pounds per square yard of mixture is required, additional lifts shall be applied. Note 5: The gradation and percent residual asphalt as shown on the Micro-Surfacing design or as established by the Engineer shall be maintained with the listed Mixture Control Tolerances. The Micro-surfacing type and target spread rate will be as shown in the plans and shall be controlled to within plus or minus 2 pounds per square yard except in no case shall a spread rate be less than the minimum be allowed. Scratch courses and rut filling applications are exempt from these specifications as rates will vary based upon the depth of the ruts and shall be spread as separate lifts.
b.Mixture Design. At least three weeks prior to beginning work, the Contractor shall submit to the Materials and Tests Engineer a mix design with certified test results along with representative samples of each ingredient to be used in the Micro-Surfacing mixture. The sample shall include information relative to sources, type of materials, and project number. The job mix formula shall be designed in accordance with the International Slurry Surfacing Association (ISSA) recommended guidelines and technical SECTION 403 MICRO-SURFACING SEAL COAT bulletins. Mixing tests shall pass at the maximum expected air temperature in accordance with ISSA T 113. If aggregate proportions are changed, a new job mix formula shall be submitted for approval. No Micro-Surfacing work shall begin nor shall any mixture be accepted unless the Bureau of Materials and Tests has evaluated the Micro-Surfacing design.
403.04 Equipment.
a.General. All equipment, tools, and machines used in the performance of this work shall be approved by the Engineer. No work shall be attempted with equipment that is malfunctioning. The Engineer may order that the work be discontinued if sufficient equipment and tools are not in use to place the materials satisfactorily.
b.Mixing Equipment. The paving mixture shall be mixed by a self-propelled Micro-Surfacing mixing machine which shall be a front feed continuous flow mixing unit able to accurately deliver and proportion the aggregate, emulsified asphalt, mineral filler, field control additives and water to a revolving multi-blade, twin shafted mixer and discharge the mixed product uniformly on a continuous flow basis. Additionally, the mixing machine shall be equipped with dual side driving stations of original equipment manufacturers design that will assist in proper alignment when applying mixture. A spray bar shall be provided to completely wet the aggregate entering the pugmill with additive (if used) and water. The Contractor shall provide a computerized material monitoring system with integrated materials control devices that are readily accessible and positioned so the amount of each material used can be determined at any time. Each material control device shall be clearly marked and calibrated prior to mix application. The mixer shall be equipped with a back-up electronic materials counter that is capable of recording running count totals for each material being monitored. The mixer shall have the capability to record and display the following information:
1.Individual sensor counts for emulsion, aggregate, mineral filler, water and additive;
2.Aggregate, emulsion, and mineral filler output in lbs. per minute;
3.Ground travel distance;
4.Spread rate in lbs. per square yard;
5.Percentages of emulsion, mineral filler, water, and additive;
6.Cumulative totals of aggregate, emulsion, mineral filler, water, and additive;
7.Scale factor for all materials. The Contractor shall calibrate the mixing machine for each material type with a minimum of 3 tests. The mixing machine shall be calibrated every time a material component is changed. Additional calibrations may be required during production as directed by the Engineer. Additional requirements:
1.Water Pressure System. The mixing machine shall be equipped with a water pressure system and nozzle type spray bar to provide a water spray ahead of and outside the spreader box when required.
2.Proportioning Devices. Individual volume or weight controls for proportioning each material to be added to the mix shall be provided and properly marked. These proportioning devices shall be used in materials calibration and for determination of materials output at any time. Each mixing unit shall be calibrated prior to commencement of the work.
3.Emulsion Pump. The emulsion pump shall be a heated, positive displacement type pump.
c.Spreading Equipment. The Micro-Surfacing mixture shall be spread uniformly by means of a hydraulically adjustable type spreader box with a positive screed adjustment and equipped to expand as necessary for varying pavement widths attached to the mixer, equipped with ribbon flighted augers to agitate and spread the materials throughout the box. These augers shall be designed to maintain sufficient turbulence in the mixture to prevent the material from setting-up in the box or causing buildup and lumps. A front seal shall be provided to ensure no loss of the mixture at the road contact surface. The rear seal shall act as a final strike-off and shall be adjustable. The spreader shall be maintained to prevent the loss of the paving mixture in surfacing super-elevated curves. The spreader box and rear strike-off shall be SECTION 403 MICRO-SURFACING SEAL COAT designed and operated so that a uniform consistency is achieved to produce a free flow of material to the rear strike-off without causing skips, lumps, or tears in the finished surface.
d.Rut-Filling Equipment. Microsurfacing materials may be used to fill ruts, utility cuts, depressions in the existing surface, and minor surface blemishes. Ruts less than 0.5 inches in depth shall be filled with a leveling course pulled full width with the spreader box. Ruts equal to or greater than 0.5 inches in depth shall be filled independently with a rut-filling box. Ruts greater than 1.5 inches in depth may require multiple applications with the rut-filling box to restore the cross-section. The rut-filling box shall be either 5 foot or 6 foot in width. All rut-filling material shall be allowed to cure under traffic for at least 24 hours before any additional material is placed.
e.Auxiliary Equipment. Suitable crack and surface cleaning equipment, barricading equipment, hand tools and other support equipment shall be provided by the Contractor as necessary to perform the work.
f.Equipment Calibration Each mixing unit shall be calibrated in the presence of the engineer prior to the start of the project. Any component replacement affecting material proportioning requires that the machine be recalibrated. No machine will be allowed to work on the project until the calibration has been completed and/or accepted. Additional calibrations may be required during production as directed by the Engineer. Calibrations shall be performed in accordance with ALDOT procedure 454, “Calibration of Microsurfacing Equipment”. The Contractor shall provide a copy of the of the calibration worksheets to the Engineer.
403.05 Construction.
a.Weather Limitations. The Micro-Surfacing mixture shall be spread only when the ambient temperature for the 48 hours prior to placement is at least 50 F. The current pavement surface and ambient temperature is at least 50 F and rising. The weather is not foggy or rainy and there is no forecast of temperatures below 32 F within 48 hours from the time of placement. The Micro-Surfacing mixture shall be spread at the discretion of the Engineer if the relative humidity exceeds 80 percent or the weather is overcast.
b.Surface Preparation. The area to be surfaced shall be thoroughly cleaned of vegetation, loose aggregate, and soil. All cracks shall be cleaned to the satisfaction of the Engineer prior to overlay. Traffic markings and stripe shall be removed flush with the pavement surface. Whenever conditions are such as to require pre- wetting the surface, the water shall be sprayed ahead of and outside of the spreader box at a rate sufficient to dampen the surface without any free flowing water ahead of the spreader box.
c.Application. The paving mixture shall be spread on the prepared surface in such a way as to leave a uniform finished surface. Care shall be taken when filling ruts to restore the designed profile of the pavement cross section. Excess crowning or overfilling of the rut area will not be permitted. The Contractor shall use squeegees and lutes to spread the mixture in areas inaccessible to the spreader box and areas requiring hand spreading. A sufficient amount of material shall be carried at all times in all parts of the spreader box to ensure complete coverage. No lumping, balling or unmixed aggregate shall be permitted. No segregation of the emulsion and aggregate fines from the coarse aggregate will be permitted. If the coarse aggregate settles to the bottom of the mix, the mix will be removed from the pavement. The paving mixture shall have proper consistency so that excessive splattering and excessive free water is avoided. The paving mixture shall be applied based on dry aggregate weight as specified on the plans. Adjustments to the additive will be permitted if necessary to provide a slower setting time when hand spreading is needed. If hand spreading is necessary, the mixture shall be poured in a small windrow along one edge of the surface to be covered and then spread uniformly by a hand squeegee or lute. A smooth, neat seam shall be provided where two passes meet. Excess material shall immediately be removed from ends of each run.