534.05 Basis of Payment.
a.Unit Price Coverage. The contract unit price for cleaning existing drainage structures shall be full compensation for all materials, tools and labor required for cleaning the structures, disposing of all materials that are removed from the structure and installing new rodent screens.
b.Payment will be made under Item No.: 534-A Cleaning Pipe Underdrain Outlets - per each 534-B Cleaning Existing Catch Basin - per each 534-C Cleaning Existing Manhole - per each 534-D Cleaning Existing Drop Inlet - per each 534-E Cleaning Existing * (Less Than Or Equal To 48" Horizontal Opening) - per linear foot 534-F Cleaning Existing * (Greater Than 48" Horizontal Opening) - per linear foot * Pipe, Culvert, etc. SIDE DRAIN PIPE
535.01 Description.
This Section shall cover the work of furnishing and installing side drain pipe in conformity with these specifications. The word "pipe" in this Section shall include both round and arch pipe. It shall cover only those pipes specifically designated on the plans as side drain; it shall not apply to other pipes laid parallel to the roadway. The kind, type, and size of each side drain pipe will be shown on the plans or in the proposal. The location of each will be shown on the plans or designated. This Section shall include furnishing and constructing such joints and necessary cutting to provide connections to other drainage facilities, and other incidentals necessary for completion of the work.
535.03 Construction Requirements.
a.General. Construction details for installing side drain pipe shall be as specified in Section 530, except as modified in this Section. The requirements of Subarticle 530.03(b) for partial construction of fills in advance of trenching will not apply. Trenches shall be excavated as specified in Section 214. No separate measurement or direct payment will be made for excavation and backfill of trenches for side drain pipes. Special bedding will not be required; however, the pipe shall be bedded with ordinary care in the loosened soil foundation of the trench. Should the material at the elevation of the bottom of the pipe be ledge rock or other unsuitable bedding, it shall be excavated without additional compensation. The pipe shall be installed so that it will not vary at any point more than 1 inch {25 mm} from established line and grade. The pipe shall be backfilled in thoroughly compacted layers not more than 6 inches {150 mm} in thickness, using pneumatic tamps unless otherwise directed, but there will be no specific density requirements. Backfill shall be ordinary excavation material. b.Testing for Excessive Deformation in PVC, HDPE, and PP Pipe. PVC, HDPE, and PP pipe shall be tested for excessive deformation. The test shall be performed by the Contractor in the presence of the Engineer. Testing shall be conducted no fewer than 30 days after the completion of the compaction of all fill over the pipe. The Contractor shall conduct the test by pulling a nine point mandrel through the entire length of the pipe by hand. The mandrel shall meet the following requirements: It shall be made of steel or aluminum; It shall have an effective diameter of 95 % of the nominal inside diameter of the pipe; It shall be at least as long as the diameter of the pipe; It shall be fitted with pulling rings at each end; It shall be stamped or engraved on some segment other than a runner with the pipe size and mandrel outside diameter. Prior to testing, the Contractor shall provide the Engineer with a proving ring to verify the mandrel size. The deformation is unacceptably excessive if the mandrel cannot be pulled through the pipe by hand without damaging the pipe. If the deformation is unacceptably excessive, the pipe shall be replaced without extra compensation. There will be no direct payment for testing.
535.04 Method of Measurement.
Side drain pipe will be measured in the same manner as specified in Article 530.04. Excavation and foundation backfill for side drain pipe will not be measured separately for payment, but the cost thereof shall be included in the contract unit price bid for the side drain pipe.
535.05 Basis of Payment.
a.Unit Price Coverage. Accepted side drain pipe, measured as specified above, will be paid for at the contract unit price per foot {meter} for the respective items, which shall be payment in full for furnishing pipe, excavating trenches, placing pipe, backfilling trenches, and for all tools, equipment, labor, and incidentals necessary to complete the work. SECTION 536 RELAID PIPE
b.Payment Will Be Made Under Item No.: 535-A ___ inch {mm} Side Drain Pipe ( * ) - per linear foot {meter} 535-B ___ inch {mm} Span, ___ inch {mm} Rise Side Drain Pipe ( * ) - per linear foot {meter} * Show specific type, class, or wall thickness, if required. Example: V.C., or P.C., or Class ____ R.C., or ___ gage {mm} C.A., or ___ gage {mm} C.S., or ___ gage {mm} C.C.S., or ___ gage {mm} C.C.A. SECTION 536 RELAID PIPE
536.01 Description.
This Section shall cover the work of relaying pipe, regardless of size, in accordance with the requirements of these specifications, at the locations shown on the plans or designated and in accordance with established lines and grades. The item shall include furnishing and construction of such joints, necessary cutting and connections to other pipes, the removal and preservation of that portion of pipe culverts, in place, which are to be replaced by new or re-laid pipe; it shall also include furnishing and construction of such joints, necessary cutting and connections to other pipes, catch basins, end walls, etc., as may be required to complete the work shown on the plans or directed.
536.04 Method of Measurement.
Re-laid pipe will be measured in the same manner as specified in Article 530.04. Excavation and foundation backfill for re-laid pipe will not be measured separately for payment, but the cost thereof shall be included in the contract unit price bid for the re-laid pipe.
Source: 2026 Standard Specifications for Highway Construction, 2026 Edition. Pages 424–426 of 826.