pipe. The vent located on the low end of the encasement shall be installed on the underside of the encasement and the vent located at the high end of the encasement shall be installed on the top of the encasement. The vent pipe shall slope upwards away from the encasement. The vent pipe shall be above ground unless otherwise noted on the project plans.
1.General. The Contractor shall submit the procedure proposed for the Type 2 installation (jack and bore, or tunneling) to the Engineer at least 7 calendar days prior to the beginning of the installation. The Engineer will not approve the submittal but will review it for completeness. Work shall not begin until the Engineer informs the Contractor that the submittal is complete. The submittal shall contain a list of all equipment proposed for use and a description of the procedure proposed for installation. The encasement pipe shall be installed simultaneously with the boring action. The results of this procedure shall produce a neatly installed encasement pipe without damage to the existing facility (roadbed, slopes, etc.) and without excessive voids in the earth surrounding the encasement pipe. If there are indications that voids exist around the encasement, the Engineer will order the Contractor to pump a concrete grout under pressure to seal the voids. Any damage to the facility caused by the installation operation shall be restored by the Contractor to the satisfaction of the Engineer without cost to the Department or Utility.
2.Seating of Carrier Pipe. Encasement pipe spacers shall be used to maintain separation of the encasement pipe and the carrier pipe to ensure stability of the carrier pipe. Spacers shall be either stainless steel or non- metallic as approved by the Engineer and shall be installed in accordance with the manufacturer’s recommendations.
649.05 Basis of Payment.
a.Unit Price Coverage. The encasement pipe will be paid for at the contract unit price bid for the type of installation required. The unit price bid shall be compensation in full for furnishing and installing the pipe, all excavation and backfill, vent pipes, spacers, end treatments, disposal of excess material and all labor, material, tools, equipment and incidentals necessary to complete the work.
b.Payment will be made under Item No.: 649-A ___ inch {mm} * Encasement Pipe, Type ** Installation - per linear foot {meter} * Show Type: Steel; High Density Polyethylene(HDPE);etc. ** Show Type: 1, 2 or 3 SECTION 650 TOPSOIL
Source: 2026 Standard Specifications for Highway Construction, 2026 Edition. Pages 550–551 of 826.
View official source ↗