Payment for additional fertilizer and agricultural limestone will be made in accordance with the requirements given in Article 652.05. Payment for seeding may be withdrawn for areas where vegetative cover is not established or not satisfactorily maintained and fertilized after establishment. Every effort should be made to establish vegetation of permanent species in accordance with the seasonal requirements shown for each species in Section 860. Areas where the season and required seed mix causethe method of seeding in stubble to be necessary for the establishment of a permanent plant will not be considered acceptable until vegetation of a permanent species is satisfactorily established. The project will not be accepted for maintenance prior to acceptable establishment of vegetation after seeding in stubble. Payment will not be made for areas of unsatisfactory stands of vegetative cover, the repair of areas damaged by the Contractor, or for the repair of washes in areas where sufficient erosion control measures are available to the Contractor. Requests from the Contractor for payment for areas of unsatisfactory stands of vegetative cover will not be considered by the Construction Engineer without the submittal of documentation of absolute adherence to the requirements for the application of topsoil and for the establishment of the vegetation.
652.04 Method of Measurement.
652.05 Basis of Payment.
654.01 Description.
This Section shall cover the work of furnishing solid grass sodding in designated locations throughout the construction limits of the work. Basic work consists of ground preparation, furnishing and placing required soil amendments, and furnishing and installing sod and maintenance of the sod including watering of the sod for the life of the contract.
654.02 Materials.
All materials shall conform to the requirements of Article 860.05. A list of acceptable mulch control netting products (LIST II-20, “TACKIFIERS, MULCH CONTROL NETTING, AND HYDRAULIC MULCH PRODUCTS”) is given in the ALDOT’s MSDSAR manual.
654.03 Construction Requirements.
The installation of sod shall be performed by or under the direct supervision of a licensed applicator in the area of Horticulture Professional Service for Setting of Landscape Plants. Areas to receive sod shall be prepared in accordance with the requirements for planting vegetation in soft soil given in Section 652. The requirements for ground preparation and the application of initial and final amendments to the soil shall apply to this work. Rolled and rectangular sod pieces shall be placed long edge perpendicular to the flow of water on the prepared and amended soil with no gaps between the individual sod pieces or rolls. The entire sodded area shall be rolled with a weighted roller to set each piece of sod into the topsoil. Staking or stapling of sod is required on slopes 3:1 or steeper and all channel applications. The stapling shall also occur at the transition overlaps and shall be placed through both abutting pieces of sod. When required by the plans, mulch control netting shall be applied in accordance with Section 656 and shall be a subsidiary obligation. The Contractor should water the sod immediately after installation, and the sod shall receive approximately 1.5 inches of rainfall or irrigation per week during the Summer or 1 inch of rainfall or irrigation per week during the Spring and Fall. Dormant sod laid during the Winter requires less frequent rainfall or irrigation, but the sod shall be watered prior to a hard freeze in a dry or drought state to protect the root bed. The Contractor shall also fill washes and otherwise protect and maintain all sodded areas until the contract is accepted for maintenance or until the bond is released if a bond was required. Payment will not be made for areas of unsatisfactory stands of vegetative cover, the repair of areas damaged by the Contractor, or for the repair of washes in areas where sufficient erosion control measures are available to the Contractor. Requests from the Contractor for payment for areas of unsatisfactory sod will not be considered without the submittal of documentation of absolute adherence to the requirements for the establishment of the solid sodding. The requirements given in Section 652 shall apply to the determination of a satisfactory installation of solid sod except that a 95 % living coverage will be required.
654.04 Method of Measurement.
Solid Sodding will be measured in square yards {square meters} from measurements made parallel to the surface of the area covered by the sod.
654.05 Basis of Payment.