SECTION 680 GEOMETRIC CONTROLS
674.02 Materials.
Construction Safety Fence shall consist of a plastic, open-mesh fencing material, which shall be bright orange in color, and mounted on posts by means of adjustable belts or loops or other means that will securely hold the fencing in an upright position. Posts may be of any type material that will adequately serve the intended purpose for the duration of the project. Fence material shall weigh at least 12 pounds per 100 foot long roll (four foot wide roll) {5.4 kg per 30 meter long roll} ({1.21 meter wide roll}). The Department has established a list (List V-7) of acceptable Construction Safety Fences. The Contractor may furnish any of the safety fences shown on this list. The list is given in the Department's manual, "MATERIAL, SOURCES AND DEVICES WITH SPECIAL ACCEPTANCE REQUIREMENTS."
674.03 Construction Requirements.
Construction Safety Fence shall be installed as shown in the plans and as directed by the Engineer. The fence shall be continuous, four feet in height above the ground surface, and shall be spliced together only at support posts with a minimum 6 inch {150 mm} overlap. The maximum spacing between posts shall be 10 feet {3 meters}. The Contractor shall maintain the integrity of the fence as long as the engineer deems necessary and while construction or associated activities are ongoing in the vicinity of the area enclosed or delineated by the fence. The Contractor shall routinely inspect the fence and correct any deficiencies immediately. The fence shall remain in place until the Engineer directs that it be removed. The fence materials shall remain the property of the Contractor and may be reused at other locations, provided they are in satisfactory condition for reuse as determined by the Engineer. Posts and the hardware for attaching the construction safety fence to the posts shall be considered a necessary requirement of the construction safety fence installation and no direct payment will be made for such.
674.04 Method of Measurement.
Construction Safety Fence will be measured in linear feet {meters} to the nearest 0.1 of a foot {0.1 meter} along the line of the completed fence.
674.05 Basis of Payment.
680.01 Description.
When this item is included in the proposal, it shall consist of the Contractor furnishing, placing, and maintaining construction stakes, lines, and grades necessary for establishing the accurate location of all features of construction.
680.02 Materials.
All materials needed in the performance of the work of Geometric Controls shall be furnished by the Contractor.
680.03 Construction Requirements.
680.04 Method of Measurement.
Measurement of the item of Geometric Controls will be made on a lump sum basis. When more than one project is included in a contract, each project will be assigned a fractional part of the lump sum as shown on the plans. Partial payments for the item of Geometric Controls will be made on monthly estimates with the amount to be paid each month a percentage of the lump sum bid price. Payments will be made at the time and in the amounts shown in the following schedules: SECTION 680 GEOMETRIC CONTROLS SCHEDULE OF PARTIAL PAYMENTS FOR GEOMETRIC CONTROLS WHEN THE CONTRACT BID PRICE FOR GEOMETRIC CONTROLS IS LESS THAN, OR EQUAL TO 5 % OF THE ORIGINAL CONTRACT AMOUNT (Partial Payments are a % of the Contract Amount for Geometric Controls) TIME OF PARTIAL PAYMENT AMOUNT OF PARTIAL PAYMENT ACCUMULATED PAYMENT First Estimate 20% of the Bid Price for Geometric Controls 20% of the Bid Price for Geometric Controls After the First Estimate and When the Percent Complete Exceeds 5 % of the Adjusted Contract Amount 50% of the Bid Price for Geometric Controls 70% of the Bid Price for Geometric Controls After the First Estimate and When the Percent Complete Exceeds 50 % of the Adjusted Contract Amount 30% of the Bid Price for Geometric Controls 100% of the Bid Price for Geometric Controls Note: If 50 % or more of the Adjusted contract amount is completed by the first estimate, a payment of 75 % of the Bid Price for Geometric Controls will be made on the first estimate. The remainder of the Bid Price for Geometric Controls will be paid on the following estimate. SCHEDULE OF PARTIAL PAYMENTS FOR GEOMETRIC CONTROLS WHEN THE CONTRACT BID PRICE FOR GEOMETRIC CONTROLS IS GREATER THAN 5 % OF THE ORIGINAL CONTRACT AMOUNT (Partial Payments are a % of the Contract Amount for Geometric Controls) TIME OF PARTIAL PAYMENT AMOUNT OF PARTIAL PAYMENT ACCUMULATED PAYMENT First Estimate 10% of the Bid Price for Geometric Controls 10% of Total Bid Price for Geometric Controls After the First Estimate and When the Percent Complete Exceeds 5 % of the Adjusted Contract Amount 25% of the Bid Price for Geometric Controls 35% of Total Bid Price for Geometric Controls After the First Estimate and When the Percent Complete Exceeds 50 % of the Adjusted Contract Amount 50% of the Bid Price for Geometric Controls 85% of the Bid Price for Geometric Controls At Acceptance for Maintenance per Item 105.15(c)3. 15% of the Bid Price for Geometric Controls 100% of the Bid Price for Geometric Controls When more than one project is included in one contract, the amount of payment to be made will be based on the "Percent Complete" as defined in Article 108.04 and amount of the entire contract, not the amount of each individual project. Once the amount of partial payment is determined, based on the entire contract, this amount will then be prepared for payment on each individual project based on the fraction of the total contract of which the project is a part.
680.05 Basis of Payment.
680.04 The final quantity for this item will be 1.0 unless the project is terminated prior to completing
the work in accordance with Article 108.14. When more than one project is included in a contract, the amount of a partial payment will be the sum of separate calculations made for each project.