FOR CONSTRUCTION WORK ZONES the implementation, operation, and inspection of traffic control on the referenced project are trained, or will be trained prior to beginning work, appropriate to the decisions each individual is required to make in accordance with 23 CFR 630 Subpart J”. This wording shall be followed by the signature of an authorized representative of the Contractor. Employees shall receive periodic training updates that reflect changing industry practices. The Contractor shall maintain records of the training. The records shall include dates of training, name of instructor, name of attendee, length of course, and topics covered. The records shall be available for auditing by the Engineer.
740.04 Method of Measurement.
The various items used in the handling of traffic through construction zones will be measured for payment as follows: Construction Signs and Special Construction Signs which are specified by plan details or ordered by the Engineer and approved for use will be measured in square feet {square meters} computed from measurements of the actual sign panel installed (no deductions will be made for corner radii). The sign supports and mounting hardware are considered incidental to the use of these sign units; hence no separate measurement or payment will be made for the supports and hardware. Measurement for payment under the Item of Special Construction Signs will only be made on signs designated as "Special" by plan details or ordered as "Special" by the Engineer. Drums will be measured individually for the number ordered and furnished. Cones will be measured per each and shall be 36 inches {900 mm} high with a ballasted base. Cones of smaller height may be used for operations such as pavement striping and marking, but no direct payment will be made. Barricades will be measured individually for the type designated and furnished. FOR CONSTRUCTION WORK ZONES Delineators will be measured per each which includes a 3 inches {75 mm} in diameter reflector of designated color, mounted on a #2 {3 kg/m} steel post or equivalent aluminum post as specified by Part VI of the MUTCD. Warning lights will be measured per each for the type furnished. Vertical panels will be measured per each installation for the number of installations ordered and furnished, which shall include the panel, or panels, post, and hardware. A single-sided installation shall be an installation requiring a panel on only one side of the post. A double-sided installation shall be an installation requiring a panel on each side of the post. The construction plans may contain traffic handling schemes detailing the signs, barricades and other traffic control devices to be installed at certain locations or in some cases for the entire project. If specified on these traffic handling schemes, and a lump sum pay item is provided, payment shall be made on a Lump Sum basis for all signs and devices detailed on these schemes. Signs, barricades, and other traffic control devices included in this Lump Sum measurement shall meet all requirements as outlined in this Section. Other traffic control items such as traffic control stripes, legends and markings, portable concrete barriers, sequential chevron and arrow boards and pavement markers when so required will be measured and paid for under the appropriate Section for such provided in the Specifications. Measurement of Item 740-O, Pilot Car, will be the actual number of units (per Each) ordered and accepted. No direct measurement or payment will be made for a pilot car unless it is listed in the pay items of the contract. Portable Rumble Strips will be measured per lump sum.
740.05 Basis of Payment.
741.01 Description.
This Section shall cover the work of furnishing Portable Sequential Arrow and Chevron Sign Units and all services and operational supplies necessary to provide a functional sign unit during the life of the contract. Three categories of furnishing and use of these type sign units are covered by this Section. These categories are as follows:
741.02 Materials.
TRAFFIC CONTROL DEVICES in other states
Get an email when 740 changes
Alabama revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.