751.01 Description.
This work shall consist of rehabilitating existing roadway lighting systems to the extent indicated on the plans. All work shall be performed with the requirements of Section 750 and as shown on the plans. The structural requirements (design and materials) for roadway lighting are addressed in Section 718.
751.02 Materials.
All material requirements given in Article 750.02, including submittals, shall apply to the rehabilitation work unless noted otherwise on the plans.
751.03 Construction Requirements.
The requirements for the rehabilitation of a roadway lighting system will be shown on the plans. All of the construction requirements given in Article 750.03, including the requirements for submittals, testing, and guarantees, shall be applicable to the rehabilitation work unless noted otherwise on the plans.
751.04 Method of Measurement.
All rehabilitation of existing roadway lighting system items with the exception of 751-M will be measured per each by the appropriate items complete, in place, acceptably installed and operational. For Pay Item 751-C, Testing Circuit Insulation, each circuit shall be separate and be measured per each. Pay Item 751-M will be measured per lump sum.
751.05 Basis of Payment.
756.01 Description.
This Section shall cover the work of furnishing and installing electrical conduits and ducts as detailed by the plans and these specifications. The installation shall include placement of the conduit at the location shown on the plans or directed by the Engineer. All electrical conduits installed under this Section shall be encased, with the kind of encasement depending on the type of installation as follows: Type 1 installation - duct installed by open trench method and having a concrete encasement. Type 2 installation - conduit installed by an approved jacking or boring procedure and having a steel pipe encasement. Type 3 installation - conduit or duct installed by open trench method and having a bituminous plant mix backfill and surface treatment (when required). Type 4 installation - conduit installed by open trench method, having a pipe encasement as shown on the plans, and backfilled as shown on the plans. Type 5 installation - duct installed by a precision directional boring method as a high-density polyethylene (HDPE) encasement.
756.02 Materials
Materials shall meet the appropriate requirements of Division 800, Materials, and the requirements noted in this Article. Conduit inside of encasement shall meet the requirements of the respective sections in Division 800, Materials, based on the primary use of the conduit (i.e. Intelligent Transportation Systems [ITS], Traffic Signals, or Roadway Lighting). Metal encasement pipe shall meet the requirements of Section 862. Concrete used to encase conduit in a Type 1 installation shall be Class A concrete meeting the requirements of Section 501. All electrical equipment shall conform to the standards of the National Electrical Manufacturers' Association (N.E.M.A.), or Underwriters Laboratory, whichever is applicable. Workmanship and materials shall conform to the requirements of the National Electrical Codes, National Electrical Safety Code and with any local codes or ordinances governing electrical installations. All materials and equipment shall be new, except where the plans specifically provide for re-using existing equipment. SECTION 756 ELECTRICAL CONDUITS AND DUCTS UNDER ROADWAYS If requested by the Engineer, the Contractor shall submit samples for inspection and approval of the proposed substitute item and bear any extra costs of evaluating the quality of the materials. All lists shall be submitted in quintuplicate for checking and approval. The Department will not be liable for any materials purchased or work done or any delay incurred prior to such approval. Failure of the Engineer to note unsatisfactory material as received will not relieve the Contractor from responsibility. Omissions from the drawings and specifications, or the misdescription of details of work which are evidently necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omissions and details of work, but they shall be performed as if fully and correctly set forth and described in the drawings and specifications. In any case of discrepancy in figures, catalog numbers, descriptions in the drawings or in the specifications, the matter shall be promptly submitted to the Engineer who shall promptly make a determination in writing. Any adjustment by the Contractor shall be at the Contractor's own risk and expense. For a Type 3 installation, the trench backfill shall be ALDOT #100 concrete sand and Bituminous Concrete Plant Mix, ALDOT 429, as shown on the plans. For a Type 4 installation, the trench backfill shall be as shown on the plans. For a Type 5 installation, the encasement duct shall be high-density polyethylene (HDPE). The duct shall meet the requirements given in ASTM F 2160, "Standard Specification for Solid Wall High Density Polyethylene (HDPE) Conduit Based on Controlled Outside Diameter (OD)". The duct shall be Schedule 80 or DR 11. The color of the duct shall be in compliance with the recommendations of the American Public Works Association for the use of the ULCC Uniform Color Code. The color of ducts for all Roadway Lighting purposes shall be black with longitudinal red striping. The color of ducts for ITS purposes shall be black with longitudinal red striping where electrical conductors are included, or black with longitudinal orange striping where communications (e.g., fiber optic cable, etc.) are included. The color of ducts for Traffic Signals purposes shall be black with longitudinal red striping; black with longitudinal orange striping may be permitted with the Area’s approval and for Traffic Signal purposes only. Any duct on the local Utility’s side of any service disconnect (whether be for ITS, Traffic Signals, or Roadway Lighting) shall be colored as required by the local Utility. Where both communications and electrical conductors are included within the same duct, the color of the duct shall be black with longitudinal red striping. The red or orange longitudinal striping on each duct shall be at least three stripes spaced at equal distances apart on the circumference of the duct. The stripes shall be an integral part of the duct material. Tape and paint stripes will not be accepted for installation. Where black with longitudinal striping is not readily available, solid red or orange (depending on the purpose) is permitted. For projects where the final maintaining authority upon acceptance is to be someone other than ALDOT, the Contractor may be provided an alternative color scheme for ducts based on their requirements.
756.03 Construction Requirements.
756.04 Submittals.
The contractor shall transmit Material Submittals in accordance with Subarticle 105.02(d) “Submittals for Traffic Design”. Submittals shall consist of material and equipment listings along with supporting documentation as specified in Item 105.02(d)1 “Preparation of Submittals” and these specifications. Material Submittals for this specification section shall be transmitted to the designated Working Group: Design Bureau’s Traffic Engineering Division for their review and approval. The Working Group’s email address is TrafficDesignSubmittals@dot.state.al.us.