Open the official AR source PDF ↗402.01 Description. This item shall consist of the application of
one or more seal coats, as specified, according to these specifications and in reasonably close conformity w ith the lines shown on the plans or as directed. When requested by the Contractor and approved by th e Engineer, Asphalt Concrete Hot Mix Surface Course (1/2” [12.5 mm]) or (3/8” [9.5 mm]) , conforming to Section 407, may be used in lieu of an asphalt surface treatment and will be considered to be equivalent construction when furnished according to the follow ing minimum substitution rate: Shoulders Roadways Material Single AST Double AST Double AST ACHM Surface Course (1/2” [12.5 mm]) or (3/8” [9.5 mm]) 100 lbs./S.Y. (60 kg/sq m) 165 lbs./S.Y. (90 kg/sq m) 165 lbs./S.Y. (90 kg/sq m)
402.02 Materials. All materials for asphalt surface treatment
shall conform to the applicable requirements of Sec tion 403. All materials for equivalent construction shall conform to the applicable requirements of Sections 407, 409, and 410. 234 The asphalt material shall be either a medium or ra pid curing cut- back asphalt, an emulsified asphalt, or asphalt bin der. If the type and grade are not specified in the Contract, the Co ntractor may choose the type and the Engineer will specify the g rade.
402.03 Construction Requirements. (a) General. The methods
employed in performing the work, and all equipment, tools, and machinery used in handling material and executing a ny part of the work shall be subject to the approval of the Engine er before the work is started and whenever found unsatisfactory s hall be changed and improved as required. Equipment, tools, and ma chinery used must be maintained in a satisfactory condition, and must conform to the requirements provided in Section 403, or in Sec tions 409, and 410, for equivalent construction. The surfaces of all structures shall be protected b y some satisfactory method to prevent their being disfigur ed by the application of asphalt material. Objectionable asp halt discoloration, caused by the Contractor's operations, shall be rem oved from all roadway and bridge structures at no cost to the Dep artment. Asphalt material shall not be applied on a surface having excess moisture or when weather conditions are unsuitable. The Contractor shall monitor local weather conditions to avoid pla cing material on the road ahead of adverse weather that could subseq uently damage the material. In the event materials are damaged b y adverse weather, they shall be replaced or repaired at no a dditional cost to the Department. Special precautions shall be taken to ensure that t he equipment is operated in a manner that distributes the asphalt a nd aggregate evenly and uniformly. Deposits of asphalt and aggr egate material upon the road surface in excess of the quantity spe cified, caused by stopping or starting the distributing machine, over flow, leakage, or other mechanical or human errors, shall be removed. Prior to performing the actual work, all equipment shall be adjusted and calibrated according to Section 403 an d applicable manufacturer's requirements. The surface section shall be constructed in half wi dths for each application when public traffic is to be maintained . When traffic is not being maintained over the roadway, full width a pplications may be made when sufficient aggregate spreading and rol ling equipment is provided for complete simultaneous coverage. 235 (b) Sweeping and Cleaning. Before the asphalt material is applied, the surface shall be thoroughly cleaned an d swept with a rotary power broom to remove all dust, dirt, mud, a nd loose or foreign material. A blower may be used to assist i n the cleaning operation. The sweeping and cleaning operations sh all be carried only far enough in advance of the application of th e asphalt material to ensure that the surface is maintained in the pro per condition at the time of application.
402.04 Traffic Control. During the application of the asphalt
material and aggregate, and during the rolling oper ation, traffic will not be allowed on the new surface. When traffic mu st use the lane adjacent to the lane under construction, the Contra ctor shall regulate the flow of vehicles past the surfacing operation a t a speed not to exceed 25 miles per hour (40 km/h). The Engineer m ay require the use of a pilot vehicle. Until the asphalt has set and the cover aggregate i s firmly embedded, traffic shall not exceed 25 miles per hou r (40 km/h). The vehicle speeds shall be controlled by the use of on e or a combination of barricades, flaggers, signs, or pilot vehicles t hat will minimize the loss of cover aggregate. The method used for speed control shall be 237 approved by the Engineer and will be subject to cha nge or modification should the selected method of control prove unsatisfactory. The Contractor shall route the aggregate haul truck s to and from the work area so that they will not have to turn on the freshly placed surface treatment.
402.05 Temperature and Seasonal Limitations. Asphalt
material shall not be applied when the surface temp erature is below 60° F (15° C). In addition, asphalt surface treatm ents shall not be applied outside the following seasonal limitations: Traveled Lanes April 15 to September 30 Shoulders April 1 to October 31 No deviation from the above limitations will be all owed except by written permission from the Engineer.
402.06 Method of Measurement. (a) Mineral aggregate in
surface treatments will be measured either by the c ubic yard (cubic meter) or by the ton (metric ton).