953 801- 1 Description: The work under this section shall consist of excavating areas to be landscaped, hauling, and satisfactory disposal of surplus excavated material, in accordance with the details shown on the project plans and the requirements of these specifications. 801- 2 Blank : 801- 3 Construction Requirem ents: All landscape excavation shall be performed in reasonably close conformity to the lines, grades, dimensions and cross sections established by the Engineer or shown on the project plans. The hauling and disposal of surplus excavated material shall be in accordance with the requirements of Subsection 203- 3.03(E) of the specifications. 801- 4 Method of Measurement: Landscape excavation will be measured either by the cubic yard or by the ton. Landscape excavation measured by the cubic yard will be measured in its original position by the Engineer, and the volume will be computed by the average end area method or by other methods approved by the Engineer. Landscape excavation measured by the ton will be measured in accordance with the requirements of Subsection 109.01 of the specifications. 801- 5 Basis of Payment: The accepted quantities of landscape excavation, measured as provided above, will be paid for at the contract unit price per cubic yard or per ton for the pay unit designated in the bidding schedule. SECTION 802 LANDSCAPE GRADING : 802- 1 Description: The work under this section shall consist of grading, contouring, smoothing or otherwise shaping areas at the loc ations designated on the project plans. TABLE OF CONTENTS INDEX
Home / DOT Specifications / Arizona / Standard Specifications for Road and Bridge Construction / 802
802LANDSCAPE GRADING
Source: Arizona Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages – of 1,296.