1061 concrete barrier will be paid for in accordance with the requirements of Subsection 905- 5 of the specifications. 911- 1 Description: The work under this section shall consist of furnishing all materials and installing new right -of-way markers, including reference markers, or removing and resetting existing right -of-way markers, at the locations shown on the project plans and the requirements of these specifications. 911- 2 Materials: 911- 2.01 Concrete: Concrete shall be utility concrete conforming to the requirements of Section 922 of the specifications. 911- 2.02 Steel: Steel shall conform to the requirements of AASHTO M 183 for structural carbon steel. 911- 2.03 Paint: Paint shall be of the types specified on the plans and shall conform to the requirements of Section 1002 of the specifications. 911- 3 Construction Requirements: Right -of-way markers shall consist of a survey monument and a reference marker. The survey monument shall be cast -in-place concrete with a standard marker cap. The standard marker cap will be furnished by the Department. Excavation for right -of-way markers shall be to the di mensions shown on the plans. Concrete shall be placed in accordance with the requirements of Section 922 of the specifications and the standard marker set in the fresh concrete. The right -of-way markers and reference markers shall be set vertically in the ground. The reference markers shall be painted and lettered as shown on the plans. Existing right -of-way markers, including reference markers, designated for removal and resetting shall be carefully removed and reset at the new locations in the manner sp ecified herein for right -of-way markers. TABLE OF CONTENTS INDEX
Home / DOT Specifications / Arizona / Standard Specifications for Road and Bridge Construction / 911
911RIGHT -OF-WAY MARKERS
Source: Arizona Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages – of 1,296.