27 CEMENT TREATED BASES
27-1 General
27-1.01 General
27-1.01A Summary
Section 27 -1 includes general specifications for placing cement treated base .
27-1.01B Definitions
coarse aggregate: Aggregate retained on a no. 4 sieve. fine aggregate: Aggregate passing a no. 4 sieve.
27-1.01C Submittals
Submit evidence of the cost of cement used for an ordered increase or decrease. Submit cement treated base QC plan.
27-1.01D Quality Assurance
27-1.01D(1) General
27-1.01D(1)(a) General
After the CTB has been spread on the subgrade and before initial compaction, the cement content of the completed mixture of CTB must not vary from the spe cified cement content by more than 0.6 percent of the weight of the dry aggregate when tested under California Test 338. For Class A CTB, compaction is tested under California Test 312 or 231. The relative compaction of CTB must be at least 95 percent. Eac h layer of CTB may be tested for compaction, or all layers may be tested together at the option the Engineer. If all layers are tested together, you are not relieved of the responsibility to achieve the required compaction in each layer placed.
27-1.01D(1) (b) Aggregate
When tested under California Test 301, aggregate for Class B CTB must have (1) an R -value of at least 60 before mixing with cement and (2) an R -value of at least 80 when aggregate is mixed with an amount of cement that does not exceed 2.5 pe rcent by weight of the dry aggregate. Before sand equivalent testing, aggregate samples must not be treated with lime, cement, or chemicals. If the aggregate gradation test results, the sand equivalent test results, or both comply with contract compliance requirements but not operating range requirements, you may continue placing CTB for the remainder of the workday. Do not place additional CTB until you demonstrate to the Engineer that the CTB to be placed complies with the operating range requirements. If the aggregate gradation test results, sand equivalent test results, or both do not comply with contract compliance requirements, remove the CTB or request a payment deduction. If your request is authorized, $2.50/cu yd is deducted. If CTB is paid for by w eight, the Engineer converts tons to cubic yards for the purpose of reducing payment for noncompliant CTB left in place. An aggregate gradation and a sand equivalent test represents up to (1) 500 cu yd or (2) 1 day's production if less than 500 cu yd.
27-1.01D(1)(c) Road-Mixed Cement Treated Base Moisture Content
Just before initial compaction the moisture content of the completed mixture must be at least the optimum moisture content less 1 percent. The moisture content is determined under California Test 226 and optimum moisture content is determined under California Test 312.
27-1.01D(1)( d) Plant-Mixed Cement Treated Base Moisture Content
At the point of delivery to the work, the moisture content of the completed mixture must be at least the optimum mois ture content less 1 percent. The moisture content is determined under California Test 226 and optimum moisture content under California Test 312. SECTION 27 CEMENT TREATED BASE S
27-1.01D(2) Quality Control
27-1.01D(2)(a) General
Reserved
27-1.01D(2)(b) Quality Control Plan
Reserved
27-1.01D(2)(c) Qualifications
Reserved
27-1.01D(2)(d) Quality Control Testing
CTB quality control must include testing the quality characteristics at the frequencies shown in the following table: QC Testing Frequencies Quality characteristic Test method Sampling location Minimum frequency Aggregate gradation California Test 202 modified Stockpiles, plant, transportation units, windrow, or roadway 1 per 500 cu yd but at least one per day of placement Sand equivalent California Test 217 Stockpiles, plant, transportation units, windrow, or roadway R-valuea California Test 301 Stockpiles, plant, transportation units, windrows, or roadway 1 test before starting work and every 2 ,000 cu yd thereafterb Optimum moisture content California Test 312 Plant, transportation units, windrow, or roadway 1 per day of placement Moisture content California Test 226 Roadway 1 per 500 cu yd but at least one per day of placement Cement content California Test 338 Windrows or roadway 1 per 1 ,000 cu yd but at least one per day of placement Relative compaction California Test 312 or 231 Roadway 1 per 2 ,000 sq yd but at least one per day of placement Compressive strengthc California Test 312 Windrow or roadways 1 per day of placement aR-value is required for Class B CTB only . bAdditional R -value frequency testing will not be required while the average of 4 consecutive sand equivalent tests is 4 or more above the specified operating range value. cCompressive strength is required for Clas s A CTB only when specified .
27-1.01D(3) Department Acceptance
The Department 's acceptance testing includes testing the CTB quality characteristics shown in the following table: SECTION 27 CEMENT TREATED BASE S CTB Requirements for Acceptance Quality characteristic Test method Aggregate gradation California Test 202 modified Sand equivalent California Test 217 R-valuea California Test 301 Optimum moisture content California Test 312 Moisture content California Test 226 Cement content California Test 338 Relative compaction California Test 312 or 231 Compressive strengthb California Test 312 aR-value is required for Class B CTB only . bCompressive strength is required for Class A CTB only when specified . The Engineer takes samples for aggregate gradation and sand equivalent from any of the following locations:
27-1.02 Materials
Cement must comply with section 90 -1.02B(2). Asphaltic emulsion curing seal must be Gra de SS -1 or CSS -1. Aggregate must be clean and free from deleterious substances. Aggregate must be within the percentage passing limits for the sieve sizes shown in the following table: Aggregate Gradationa Sieve size Percentage passing Class A Class B Operating range Contract compliance Operating range Contract compliance 3" -- -- 100 100 2-1/2" -- -- 90–100 87–100 1" 100 100 -- -- 3/4" 90–100 87–100 -- -- No. 4 40–70 35–75 35–70 28–77 No. 30 12–40 7–45 -- -- No. 200 3–15 0–19 3–20 0–24 aCalifornia Test 202 is modified by California Test 105 if the difference in specific gravity between the coarse and fine portions of the aggregate or between the blends of different aggregates is 0.2 or mo re. The aggregate quality characteristics must comply with the requirements shown in the following table: Aggregate Quality Characteristics Quality characteristic Requirement California Test Operating range Contract compliance Sand equivalent (min) 217 21 18 Compressive strength (min, psi)a 312 -- 750 aFor Class A CTB only . Water must comply with section 90 -1.02D. SECTION 27 CEMENT TREATED BASE S
27-1.03 Construction
27-1.03A General
Reserved
27-1.03B Subgrade
Immediately before spreading CTB, the subgrade , must comply with the specified compaction and elevation tolerance for the material involved and be free from loose or extraneous material.
27-1.03C Depositing Aggregate and Mixi ng Road -Mixed Cement Treated Base
27-1.03C(1) General
Reserved
27-1.03C(2) Depositing Aggregate
For road -mixed CTB, deposit enough untreated aggregate on the roadbed to compl y with the depth shown, the depth specifications in section 27 -1.03E, and the grade tolerance specifications in section 27 - 1.03F. Do not mix the aggregate to be treated with roadbed material that is not to be treated. If 2 or more nominal sizes of coarse a nd fine aggregate are deposited on the grade, accurately and uniformly meter each nominal size as it is deposited. Before adding cement, mix the deposited aggregate as many times as necessary to produce a uniform mixture that complies with the specified gr adation. For mixing done from windrows, shape the windrow to a uniform cross section with a sizing device. Do not use a motor grader unless equipped with a sizing device. Aggregate mixed with cement and water before delivery on the roadbed must be deposite d and spread on the prepared subgrade under section 27 -1.03E.
27-1.03C(3) Mixing
Mix road -mixed CTB by either of the following methods:
27-1.03D Proportioning and Mixing Plant -Mixed Cement Treated Base
27-1.03D(1) General
Mix plant -mixe d CTB at a central mixing plant by either of the following:
27-1.03D(2) Batch Mixing
If different agg regate sizes are used, the aggregates must be blended as they enter the mixer. Weigh cement for each batch on scales that are separate and distinct from the aggregate batching scales. Each cement scale graduation must be approximately 1/1 ,000 of the total scale capacity. The total capacity of the scale must not exceed the capacity of the smallest commercially available scale that is capable of weighing twice the amount of cement when the plant is operated at full capacity. No scale is required to have a tot al capacity less than 1 ,000 lb or graduations less than 1 lb. Mixing plants must be Class 1 unless Class 2 is specified. Class 1 batch mixing plants must be equipped with:
27-1.03D(3) Continuous Mixing
Draw aggregate from storage facilities by a feeder or feeders that continuously supply the correct amount of aggregat e in proportion to cement. If different aggregate sizes are used, arrange feeders such that the proportion of each aggregate size can be separately adjusted. Storage facilities for fine aggregate must be equipped with a device that effectively vibrates the side walls of the feeder preventing hang -up of material while the plant is operating. The plant must be equipped with a control system that automatically closes down the plant when the material in any storage facility approaches the strike -off capacity of the feed gate. The plant must not be operated unless the automatic control system is in good working condition. The aggregate feeder must be mechanically or electrically driven. Mechanically driven feeders must be directly connected to the cement feeder d rive. The drive shaft on the feeder must be equipped with a revolution counter that reads to 1/10 revolution with sufficient capacity to register the total number of revolutions in a day's run. Electrically driven feeders must be actuated by the same circu it that provides power to the cement feeder motor. For electric power obtained from a noncommercial source, a frequency meter must be connected SECTION 27 CEMENT TREATED BASE S to the cement feeder motor circuit. The meter must have a minimum range from 57 to 63 Hz and must be graduated i n 1 Hz increments or less. A voltage regulating transformer must be installed in the circuit of vibratory aggregate feeders. The transformer must maintain the voltage to the feeder motors to within 1 percent of their nameplate voltage. A voltmeter must be connected to the secondary of the voltage regulating transformer. The meter must have a range from -10 to +10 percent of the motor nameplate voltage and must be graduated in increments of 1 percent of the nameplate voltage, or less. For plants equipped with electrically actuated aggregate feeders, the power must have a frequency of 60 ± 1 Hz. Continuous mixing plants must be equipped with an automatic sampling device specified for Class 1 plants in section 27 -1.03D(2) that allows samp ling when the plant is in full operation. The cement feeder and aggregate feeders must be equipped with devices that allow the feed rate to be determined when the plant is in full operation.
27-1.03E Spreading Treated Mixture
Transport materials mixed at a location off the roadbed as a uniform mixture. Cover the mixture during transport to avoid moisture loss, if ordered. Deposit the mixture on the roadbed at a quantity that provides the specified compacted thickness without spotting, picking up, or shifti ng the mixture. Just before depositing plant -mixed or spreading road -mixed CTB , moisten the area to be covered. The area must be kept moist, but not excessively wet. Avoid material segregation. CTB must be free from p ockets of coarse or fine material. Spread the mixed materials in widths of not less than 2 lanes, insofar as the width of the CTB to be spread permits. Sections with 3 -lane width may be spread as a 2 -lane width and a 1 -lane width. Spread materials with 1 s preader or with several spreaders operating in a staggered position across the subgrade, unless traffic conditions limit spreading to less than a 2 -lane width. If traffic conditions limit spreading to less than a 2 -lane width, spread the remainder of the 2 -lane section within 2 hours. For traffic conditions that prevent placement of CTB in adjacent lanes within 2 hours, a longer time may be authorized. Longitudinal construction joints must be within 1 foot of lane line delineation. For areas inaccessible to mechanical spreading equipment, spread CTB in 1 layer using an authorized method. After spreading, thoroughly compact the mixture with pneumatic tampers or other compacting equipment that obtains the degree of compaction specified in section 27 -1.03F to t he required lines, grades, and cross section. Do not mix or place CTB while the atmospheric temperature is below 35 degrees F. Do not place CTB on frozen ground. Apply curing seal to completed CTB before the atmospheric temperature falls below 35 degrees F . Comply with one of the following types of spreading operations:
27-1.03F Compacting
Compacting equipment must produce the required compaction within the operation time limit specified in
27-1 03g.
Immediately following the spreading operation, compact the CTB with at least 1 complete coverage. After initial compaction, wherever the finished surface is higher than the specified tolerance, trim off high spots to within tolerance. Do not fill low areas by drifting or hauling trimmed material . Follo wing trimming, the trimmed areas must be compacted with 1 complete coverage such that the entire layer of CTB complies with the specified compaction requirements. Perform final compaction in such a manner that no loose material remains on the surface and t ear marks are eliminated. If CTB is spread and compacted in more than 1 layer, compact each layer to the required degree of compaction before placing the next layer. Trim only to comply with the specified layer thickness. The compacted thickness of any 1 l ayer must not exceed 0.50 foot or be less than 0.25 foot. When placed in more than 1 layer, keep the compacted material moist until covering with the next layer or applying curing seal. Apply curing seal to the surface of a lower layer that will not be cov ered with the next layer on the same day. The finished CTB surface must be uniform and must not deviate at any point by more than 0.03 foot from the bottom of a 12 -foot straight edge laid in any direction. The finished CTB surface must be within 0.05 foot above or below the grade established by the Engineer, except wherever concrete pavement will be placed on CTB, the finished CTB surface must not extend above the grade established by the Engineer. The surface must be kept moist at all times until the curing seal is applied. Wherever the surface of hardened CTB is lower than 0.05 foot from the grade established by the Engineer, remove the base and replace it with CTB or if authorized fill low areas according to the pavement material as follows:
27-1.03G Operation Time Requirement
Complete initial compaction before trimming within 2 hours of adding water to the aggregate and cement. Complete final compaction after trimming within 2 -1/2 hours of adding water to the aggregate and cement.
27-1.03H Contact Joints
Construct a contact joint at the end of each work day and whenever CTB operations are delayed or stopped for more than 2 hours . Contact joints must be constructed in thoroughly compacted material, normal to the roadbed centerline, with a vertical face. Do not place additional CTB until the contact joint is accepted. Where CTB has been fin ally compacted for more than 1 hour, construct longitudinal joints by cutting vertically into the existing edge approximately 3 inches deep. Moisten the face of the cut joint in advance of placing adjacent base. Material from cutting may be used as excess material as specified in section 27 - 1.03F.
27-1.03I Curing
Cover the completed CTB with asphaltic emulsion curing seal. Dilute and thoroughly mix asphaltic emulsion for curing seal at a ratio of 1 part water to 1 part asphaltic emulsion. The water must not cause premature separation of the emulsion. Uniformly apply the diluted curing se al at a rate between 0.20 to 0.30 gal/sq yd of CTB surface. The Engineer determines the exact rate. Apply curing seal on the same day as completion of final compaction and as soon after final compaction is practicable. Keep the surface moist until curing s eal is applied. Do not allow traffic or equipment on the CTB for 72 hours after application of the curing seal. After 72 hours, limit traffic and equipment on the CTB to that used in paving operations or placing additional layers of CTB.
27-1.04 Payment
If excess material is placed in an area in which the item is measured by the ton, payment as the item where placed is not made unless applicable measurement specifications for the item where placed are complied with. If cement treated base is paid for by th e ton, the payment quantity for cement treated base does not include the quantity of excess material except for the quantity of excess material used in shoulders. If cement treated base is paid for by the cubic yard: