74 PUMPING EQUIPMENT AND CONTROLS
74-1 General
74-1.01 General
74-1.01A Summary
Section 74 -1 includes general specifications for installing pumping equipment and the control systems .
74-1.01B Definitions
Reserved
74-1.01C Submittals
74-1.01C(1) General
If you use the drainage pumps to maintain total pumping capacity before Contract acceptance, submit:
74-1.01C(2) Shop Drawings
Plans and detail drawings may be 22 by 34 inches. Submit s hop drawings for the pumping equipment including :
74-1.01C(3) Product Data
Submit at least 5 copies of product data. Each copy must be bound together and include an index stating equipment names, manufacturers, and model numbers. T wo copies will be returned. Product data must include:
74-1.01C(4) Samples
The Engineer may request material samples of submitted equipment.
74-1.01C(5) Work Plans
74-1.01C(5)(a) General
Reserved
74-1.01C(5)(b) Performance Testing Plan
Submit a work plan for performance testing of pumping plant equipment. The work plan must include methods for:
74-1.01C(5)(c) Maintenance Plan
Submit a work plan for maintaining the existing pumping plant 's total pumping capacity and maintaining the pumping plant as specified in section 74 -1.03E. The work plan must include:
74-1.01C(6) Maintenance and Operation Manual
Submit a maintenance and operations manual before completion of the work. Submit 1 copy of PDF files on a CD or DVD and 2 copies in print format in 3 -ring binder s with tabbed dividers. The manual must include all authorize d action submittals for drainage pump equipment and pumping plant electrical equipment. Organize each binder as follows:
74-1.01D Quality Assurance
74-1.01D(1) General
Notify the Engineer at least 10 days before testing. The pump plant must be complete before testing is performed. Furnish all water and electrical energy necessary for testing. If authorized, you may use the pumping plant discharge system.
74-1.01D(2) Quality Control
74-1.01D(2)(a) General
Reserved SECTION 74 PUMPING EQUIPMENT AND CONTROLS
74-1.01D(2)(b) Operational Tests
Perform the operational tests in the Engineer's presence. The Engineer verifies the pump nameplates before testing. Fill the pump sump and storage boxes with water. Fill boxes as required until the operational tests and performance tests are authorized . If authorized, you may add bulkheads in the storage boxes. Perform operational tests of the pumping pl ant to demonstrate:
74-1.01D(2)(c) Performance Tests
After acceptance of the operational tests, the Engin eer will run performance tests on the installed pumping plant equipment under section 74 -1.01C(5)(b). Performance tests include two 5 -minute tests for each pump. Performance tests must show that each installed drainage pump complies with at least (1) 97 pe rcent of the factory certified performance curve and (2) the design pump rates shown. Each pump must not load its motor more than the actual full load nameplate amperage, regardless of head. The motor service factor will not be applied. Remove bulkheads an d blocking from pipes after performance testing is complete.
74-1.01D(2)(d) Drainage Pump Final Inspection
If you use the drainage pumps installed under the Contract to maintain the total pumping capacity for the pumping plant drainage area before Contrac t acceptance, remove and disassemble the pumps after your final use of the pumps. Remove and disassemble the pumps before Contract acceptance. The Engineer performs a final inspection of the pumps. Worn, damaged, or otherwise unsatisfactory parts must be r eplaced. Assemble and reinstall the pumps. Test the drainage pumps used before Contract acceptance under section 74 -1.01C(5)(b) after the Engineer's final inspection and before Contract acceptance.
74-1.02 Materials
74-1.02A General
Anchorages must comply with the specifications for concrete anchorage devices in section 75 -3.02C.
74-1.02B Delivery, Storage, and Handling
Deliver products to the job site in an undamaged condition in the manufacturer's original sealed container or other packaging syste m. Packaging must be complete with labels and instructions for handling, storing, unpacking, protecting, and installing. Store and handle products (1) under the manufacturer's written instructions and (2) such that you prevent damage, deterioration, or los s, and maintain warrantee requirements.
74-1.03 Construction
74-1.03A General
Reserved
74-1.03B Painting
Painting metal work must comply with section 59. Paint uncoated drainage pump equipment, including metal work, as machinery under section 59 - 2.01C(4 ). Paint all wood surfaces under section 78 -4.02 before installation . SECTION 74 PUMPING EQUIPMENT AND CONTROLS Paint the pump number on each drainage pump motor and on each discharge pipe 5 feet above every landing. The n umbers must be stenciled and at least 1 -1/2 inches tall. Paint an arrow show ing the direction of the drainage pump rotation on each discharge pipe 4 -1/2 feet above every landing. The arrows must be stenciled and at least 6 inches long. Use 2 applications of commercial -quality white gloss enamel. Paint surfaces before they become unreachable because of assembly operations. Painting must not impair legibility, life expectancy, or function of the following items:
74-1.03C Care and Cleaning
Do not install pumping plant equipment until the structural portion of the pump sump is substantially complete. You may install anchors and embedded equipment whenever required by the structural work. Protect the installed equipment from damage. Clean equipment, enclosures, galvanized and noncorrodible metal surfaces, and wood surfaces in the pumping plant after installation under section 59 -1.03D. Remove debris from the pump house, pump sump, storage boxes, and premises at Contract acceptance.
74-1.03D Maintenance Instructions
Supply an 11 -by-17 inch fused -laminate copy of:
74-1.03E Total Pumping Capacity and Maintenance Requirements
The Department will not issue relief from maintenance and protect ion until Contract acceptance. For existing pumping plants:
74-1.03F Use of Pumps before Contract Acceptance
Section 74 -1.03F applies if you use the drainage pumps installed under the Contract to maintain total pumping capacity before Contract acceptance. The pumping p lant must be complete. Storage boxes, screens, pump sumps, and pumping plant equipment must be authorized before use. Drainage water must be settled before entering the pumping plant. Drainage water must flow through safeguards and drainage inlet bulkheads to remove non -suspended solids. Non -suspended solids include debris, soil, sand, and gravel. Safeguards include stilling ponds, basins, check dams, and weirs. Safeguards must:
74-1.04 Payment
Not Used
74-2 Drainage Pumping Equipment
74-2.01 General
74-2.01A Summary
Section 74 -2 includes specifications for installing drainag e pumping equipment .
74-2.01B Definitions
Reserved
74-2.01C Submittals
74-2.01C(1) General
Reserved
74-2.01C(2) Product Data
Submit product data f or the following items:
74-2.01C(3) Certificates of Compliance
Submit certificates of compliance for factory certified impeller balancing and factory certified drainage pump tests. Certification documents must be in US customary units. Submit the factory original hard copy and 2 copies as PDF files on 2 CDs , DVDs , or another authorized data-storage device . The Department will not accept a facsimile copy. Notify the Engineer of the submittal. Include in the notification the date and contents of the submittal. Factory -certified test documents for each drainage pump must include:
74-2.01D Quality Assurance
74-2.01D(1) General
Reserved
74-2.01D(2) Regulatory Requirements
Drainage pumps must be factory certified under ANSI/HI 14.6. Each pump certification must be for the actual motor, pump, and trimmed impeller combination delivered to the job site. The im peller balancing must be factory certi fied under ISO 1940 -1, ISO Balance Quality Grade G6.3, at the supplied motor rpm.
74-2.02 Materials
74-2.02A General
Reserved
74-2.02B Drainage Pumps and Pumping Apparatus
74-2.02B(1) General
Reserved SECTION 74 PUMPING EQUIPMENT AND CONTROLS
74-2.02B(2) Drainage Pump
Drainage pumps must be submersible, end -suction, single -stage, close -coupled, overhung -impeller, centrifugal wastewater pumps complying with ANSI/HI 1.1 -1.2 and ANSI/HI 1.3. Pumps must be assembled and tested at the factory. Do not use a base elbow mounted pump. Drainage pumps must be coated with the manufacturer's standard finish for the intended use. Drainage pumps must be the rpm and voltage shown and comply with the design pump rates and dynamic heads shown. Drainage pumps must have cast iron:
74-2.02B(3) Pumping Apparatus
Flap valves must have an iron body with pipe flange frame and bronze mating surfaces. Fasteners, expansion anchors, nuts, bolts, and washers must be Type 316 stainless steel. Pressure gauges must be a compound gauge complying with ASME B40.100, Grade A, and must have:
74-2.02C Pump House Doors, Louvers, and Fans
74-2.02C(1) General
Fabricate pump house doors and frames under ANSI/SDI A250.8 or ANSI/NAAMM -HMMA 861. Hinges must comply with ANSI/BHMA A156.1. Locksets must comply with ANSI/BHMA A156.2. Door gasketing must comply with ANSI/BHMA A156.22. Thresholds must comply with ANSI/BH MA A156.21. Galvannealed steel sheet must be commercial steel, Type B, complying with ASTM A1008/A1008M with at least an A60 metallic coating complying with ASTM A653/A653M.
74-2.02C(2) Pump House Doors
The pump house door consists of the door, frame, and door hardware. Furnish the factory applied finish coating system for the exterior locations. The pump house doors must be at least 1 -3/4 inches thick, full flush, seamless hollow metal construction. The doors must comply with ANSI/SDI A250.4, physical endurance Level A, and the following:
74-2.02C(3) Wall Louvers
Wall louvers must be continuous channel frame with nonvision, inverted Y blades. Wall louvers must:
74-2.02C(4) Fans
Reserved SECTION 74 PUMPING EQUIPMENT AND CONTROLS
74-2.02D Pipe, Joints, and Fittings
74-2.02D(1) General
Reserved
74-2.02D(2) Steel Pipe
Galvanized steel pipe must be standard weight complying with ASTM A53/A53M. Threaded fittings must be galvanized steel or galvanized malleable iron. Welded steel pipe must comply with section 70 -3, except that electrically insulated connections must not be used. Coat pipe under section 70 -3.02B(3). Steel pipe must be flanged. Flanges may be a factory threa ded or welded type. Flange dimensions must comply with ASME B16.5, Class 150. Threaded flanges must be ductile iron complying with ANSI/AWWA C115/A21.15 . Welded flanges must be steel hub slip -on type complying with ANSI/AWWA C207, Class D. Galvanize welded flange pipe sections under section 75 -1.02B. Gaskets must be a full face SBR rubber flange type complying with ASME B16.5, Class 150. Steel flange bolts, washers, and nuts must be nonmagnetic stainless steel.
74-2.02D(3) Ductile Iron Pipe
Ductile iron pi pe must comply with ANSI/AWWA C151/A21.51. Pipe and fitting joints must be a gasketed mechanical joint type complying with ANSI/AWWA C111/A21.11 . Pipe fittings must comply with ANSI/AWWA C110/A 21.10 and ASME B16.1, Class 125. Pipe and fittings must have a n asphaltic coating complying with ANSI/AWWA C151/A21.51, and an epoxy lining complying with ANSI/AWWA C116/A21.16.
74-2.02D(4) Flexible Expansion Couplings
Flexible expansion couplings must be gasketed short -sleeve type having:
74-2.02E Bracing and Hardware
Brace drainage pumps and other equipment to prev ent movement during operation. The b racing method must comply with California Seismic Hazard Zone requirements in the CBC. Slots for bolt and U -bolt holes in bracing and clips must be 2 bolt diameters wi de. The s lot holes must be parallel to the axis of the member. Install cut washers under bolt heads and nuts for slotted hole locations. Galvanize braces, frames, and other metal hardware under section 75 -1.02B. Pumping pla nt metal work must comply with section 75 -4.
74-2.02F Storage Cabinets
Storage cabinets must:
74-2.03 Construction
74-2.03A General
Install pressure gauges with gauge guards and gauge cocks. Mount the gauges ver tically. Furnish specialty tools required for the assembly or adjustment of equipment. Mount the tools in the storage cabinet. Install tools too large for the cabinet on adjacent brackets.
74-2.03B Pump House Doors
Install pump house doors under ANSI/BHMA A156.115. Check door frames for square ness , alignment, twist, and plumb ness before and after installation and adjust if necessary. The t olerances are ±1/16 inch. Check the door frame as follows:
74-2.04 Payment
Not Used
74-3 Pumping Plant Electrical Equipment
74-3.01 General
74-3.01A Summary
Section 74 -3 includes specificat ions for installing pumping plant electrical equipment .
74-3.01B Definitions
Reser ved
74-3.01C Submittals
74-3.01C(1) General
Submit the toll-free telephone number of the designated service organization for manufacturer's field services as an informational submittal.
74-3.01C(2) Product Data
Submit product data for:
74-3.01D Quality Assurance
74-3.01D(1) General
Reserved
74-3.01D(2) Regulatory Requirements
Electrical equipm ent must comply with section 86 and be NRTL certified. Materials and workmanship must comply with section 86 and the following:
74-3.01D(3) Manufacturer's Field Services
At Contract acceptance, provide 12 months of full maintenance for the pump controller by qualified employees of the pump controller manufacturer's designated service organization. Ma intenance must include the manufacturer's routine preventive maintenance, adjustments for proper operation, and all required parts and supplies.
74-3.01D(4) Field Quality Control
A factory -authorized service representative must inspect, test, and adjust t he pump controller for proper installation, operation, components, and connections.
74-3.01D(5) Training
Train 6 Department personnel in the programming, connection, operation, troubleshooting, and maintenance of the pump controller. T he training must be for at least 4 hours at the job site. The training instructor must be a factory -authorized representative of the pump controller manufacturer. The training must include :
74-3.02 Materials
74-3.02A General
All magnetic coils of relays, starters, and other electrical equipment must be wound for an operating range hav ing a mean equal to the voltage applied.
74-3.02B Power and Metering Equipment
74-3.02B(1) General
Reserved
74-3.02B(2) Service Pedestal Equipment
Reserved
74-3.02B(3) Motor Control Center Equipment
Panelboards must be a factory -assembled panelboard interior with metal cover, single -phase, 3 -wire, 120/240 V(ac), and must have:
74-3.02C Pump Control
74-3.02C(1) General
The automatic operation of the drainage pump must be controlled by the water level monitoring system and pump controller.
74-3.02C(2) Water Level Monitoring System
The water level monitoring system must be a trapped air level monitoring type that calculates the water depth using air pressure that is converted to an electrical signal. The system must include an air compressor, 3 -way solenoid valve, pressure transducer , polyethylene air tube, and a compression bell. The system must:
74-3.02C(3) Pump Controller
The pump controller must (1) control the pumps based on the output signal of the water l evel monitoring system, (2) interface with the monitoring system, and (3) generate alarms. The controller must be 120 V(ac), solid state, industrial grade with softwar e stored in nonvolatile memory. The controller must process the 4 to 20 mA signal from th e water level monitoring system and operate the pumps as follows:
74-3.02D Conduit
Conduit and fittings must be Type 1 comply ing with section 86. Flexible conduit and fittings must be Type 4 comply ing with section 86.
74-3.02E Conductors and Cable
74-3.02E(1) General
Do not rewire manufacturer's stock items specified in section 74 -3.01C(2).
74-3.02E(2) Conductors
Conductors must comply with section 86, except conductors must be stranded copper and comply with the following:
74-3.02E(3) Conductor and Cable Identification
Identify conductors by number. Use one of the following methods:
74-3.02F Nameplates and Warning Plates
74-3.02F(1) General
Nameplate and warning plates must be predrilled, multilayer, multicolor, plastic labels with mechanically engraved inscriptions. Secure plates to equipment using screws or rivets. Do not use adhesives except on the insi de face of enclosure doors. If authorized, you may secure nameplates to an adjacent surface.
74-3.02F(2) Nameplate and Warning Plate Identification
Nameplate and warning plate inscriptions must be as shown. Nameplate letters must be white, upper case Helv etica, and 1/4 inch in height. Leave at least a 3/8 -inch black background on all 4 sides. Equipment control switch nameplate letters must be white, upper case Helvetica, and 1/8 inch in height. Leave at least a 3/8 -inch black background on all 4 sides. Sec ure the nameplate to the equipment directly beneath the switch. SECTION 74 PUMPING EQUIPMENT AND CONTROLS Warning plate letters must be white, upper case Helvetica, and 1/4 inch in height. Leave at least a 3/8 - inch red background on all 4 sides.
74-3.02G Miscellaneous Materials
Enclosures must be minimum NEMA Type 1. Floor coverings must comply with ASTM D178 and be rated for at least 20,000 volts dielectric strength, when tested under ASTM D149. Floor covering must be at least 1/4 inch thick. Float switches must:
74-3.03 Construction
74-3.03A General
Do not install electrical equipment on unpainted wood panels.
74-3.03B Installation
74-3.03B(1) General
Reserved
74-3.03B(2) Conduit, Conductors, and Cable
Do not install conduits behind ladders or within 15 inches of the ladder -rung vertical ce nterline. Install flexible conduit with approximately 6 inches of slack between terminations. Flexible conduits and their fittings are considered a discontinuity and must be shunted by bonding jumpers. Install bonding jumpers inside the flexible conduit. D o not use the flexible conduit as the ground. Install conductors and cable s under section 87 and as follows :
74-3.03B(3) Motor Control Center
Use concrete anchorage devices to anchor the motor control center sections to the concrete slab. Shim each section to make the motor control center level. SECTION 74 PUMPING EQUIPMENT AND CONTROLS The motor control center sections must fit through the pump house doorway or roof access opening. Any modification s required for installation must be pre -approved by the manufacturer and must not change performance. Install current switches in the starter compartments. Loop power conductors around the sensing coil multiple times.
74-3.03B(4) Panel LP
The panelboard d irectory must list the equipment controlled and the area designation. The directory must be printed using Times New Roman font and at least 12 -point font size. Place the directory in the panelboard door frame with a transparent protective cover.
74-3.03B(5) Miscellaneous Materials
Secure hangers, brackets, supports, and electrical equipment to surfaces using:
74-3.03C Conductor Splices
Do not splice the drainage pump cables between the pumps and the enclosure shown. Conductor splices must be made only in (1) fixtures, (2) junction boxes, and (3) gutters. Splices must be made using either pressu re connectors listed by a NRTL or soldered joints made by soldering irons. Do not use open flame soldering. Insulate splices using the following sequence:
74-3.04 Payment
Not Used
74-4 Booster Pump S
74-4.01 General
74-4.01A Summary
74-4.01B Definitions
Reserved
74-4.01C Submittals
74-4.01C(1) General
Reserved
74-4.01C(2) Shop Drawings
Submit shop drawings for each booster pump.
74-4.01C(3) Product Data
Submit product data for the booster pump, including the following components:
74-4.01C(4) Closeout Submittals
Submit closeout submittals as a Maintenance and Operations Manual before completion of the work. Submit 2 copies as PDF files on CDs or DVDs. Submit 1 copy as fused -laminate prints in a 3 ring binder with tabbed dividers. Organize each manual as follows:
74-4.01D Quality Assurance
The requirements of section 74 -1.01D do not apply to the booster pump. Notify the Engineer 5 business days before testing the booster pump. Test the booster pump in th e Engineer's presence after connecting the booster pump to the irrigation system. The d ischarge water from testing must not cause erosion, damage to equipment or plantings, or interfere with ongoing work. The pump must not load the motor to more than the product of the nameplate (1) amperage and (2) service factor. The flow rate must not vary from the pump curve by more than 5 percent at 100 percent motor speed. Test each booster pump at the following test points:
74-4.02 Materials
74-4.02A General
The concrete for the foundation and pa d of the booster pump must be minor concrete.
74-4.02B Manufactured Units
74-4.02B(1) General
The booster pump must consist of a factory assembled and tested skid -mounted system with the following components: pump, pump controller, booster pump enclosure, manifold, inlet and outlet valves, sensors, fittings, and appurtenances. The system working pressure must be at least 150 ps i. The booster pump must be listed and labeled by a NRTL. SECTION 74 PUMPING EQUIPMENT AND CONTROLS
74-4.02B(2) Components
74-4.02B(2)a General
Reserved
74-4.02B(2)(b) Pumps
Pumps must consist of a close -coupled pump and motor. Pumps must be (1) end suction, centrifugal type with mechanical seals, (2) coated with the manufacturer's standard finish for exterior use, and (3) single or multiple stage. Booster pumps must have a horizontal or vertical configuration. For horizontal pumps:
74-4.02B(2)(c) Ball Valves
Ball valves must have a 2 -piece bronze body with full size port, chrome -plated or brass ball, and be rated for at least 400 psi.
74-4.02B(2)(d) Butterfly Valves
Butterfly valves must have a ductile iron body with molded seat liner made from EPDM or PTFE, bi - directional stainless steel stem, locking lever with extended neck, and be rated for at least 250 psi.
74-4.02B(2)(e) Pump Controller
The pump controller must consist of an enclosure, VFD, main disconnect, circuit breakers, motor starter, motor protector, and a pressure transducer. The pump controller must keep the pump r unning when the flow of water fluctuates between the changing of the irrigation controller stations. The pump controller must have a potentiometer or keypad for adjusting the motor speed. The enclosure must be a NEMA Type 12 enclosure and rated for the hor sepower, voltage, and phase shown. The ground bus must be bonded to the enclosure. The circuit breaker must be rated as shown. The following equipment must be on the front of the enclosure:
74-4.02B(2)(f) Booster Pump Enclosures
The booster pump enclosure and lid must be fabricated from stainless steel or marine grade aluminum. The lid must have a continuous hinge, gas springs or equivalent lid supports, and a hasp for padlocking. Gas springs must use their entire stroke without forcing the lid beyond its fully opened position. Side louvers must have internal bronze insect screens and be mounted on each end. The enclosure must include at least 1 thermostatically controlled exhaust fan with bronze insect screens.
74-4.02B(2)(g) Pressure Gauges
Pressure gauges must:
74-4.02B(2)(h) Appurtenances
Manifolds must be steel pipe or copper pipe. Steel pipe must comply with ASTM A53, Grade B. Copper pipe must comply with ASTM B88, Type K. The skid must be (1) either steel or aluminum channel with risers as necessary, and (2) all welded construction. Welding must comply with AWS D1.1 for steel construction or AWS D1.2 for aluminum construction. Fasteners, expansion anchors, nuts, bolts, and washers must be Type 316 sta inless steel. Nameplates must comply with section 74 -3.02F.
74-4.02B(3) Fabrication
Fabricate the booster pump as follows:
74-4.03 Construction
74-4.03A General
Support the connected water piping outside the enclosure. Do not use the booster pump to support the connected piping. Install a padlock after installing the booster pump. The Department furnishes a padlock at Contract acceptance. Place the maintenance and operations manual binder inside the enclosure.
74-4.03B Foundation and Pad
Pour a concrete foundation and pad where the booster pump is shown. The foundation must be at least 3 inches wider than the skid on all 4 sides. Place the pad against the foundation on the door side of the enclosure. The pad must be the same width as the foundation and at least 36 inches long. Conduit risers must be located inside the skid footprint.
74-4.03C Skid Installation
Use concrete anchorage devices to mount the booster pump skid on the foundation. Use at least 4 sets of tapered steel leveling wedges to level the skid. Use 2 wedges placed taper -to-taper at each point of support. The steel wedges must remain in place in the completed work. After suction and discharge piping has been installed and tightened in place, level the skid and tighten the concrete anchor hex nuts against the base. Fill the voids under the base with mortar complying with section 51 -1.02F. Retighten the mounting bolts after the voids have been filled.
74-4.03D Nameplates
Install nameplates under section 74 -3.02F. Install nameplates on:
74-4.04 Payment
Not Used