441.1General Description
This work includes placing Portland cement concrete as follows: • As slope paving on end rolls, cut slopes, paved ditches, spillways, and ditch slopes • In median pavement • As sidewalks • In concrete curbs, gutters, curb and gutters, and valley gutters • As nonreinforced headwalls • As velocity dissipators and concrete slope drains • As concrete spillways • Curb cut wheel chair ramps • At other locations designated on the Plans or as directed This work includes subgrade preparations including: • Fine grading and backfilling • Forming, furnishing, placing, and finishing concrete • Constructing weep holes and furnishing and placing the coarse aggregate • Furnishing and placing preformed joint fillers as shown on the plans • Placing driveway concrete as shown on the Plans. Nominal 4 in. (100 mm) or 6 in. (150 mm) thick as specified or to match existing pavement. 441.1.01 Definitions General Provisions 101 through 150. 441.1.02 Related References
ection 430—Portland Cement Concrete PavementS ection 500—Concrete StructuresS ection 832—Curing AgentsS ection 833—Joint Fillers and SealersS ection 853—Reinforcement and Tensioning Steel
General Provisions 101 through 150. 441.1.03 Submittals General Provisions 101 through 150. 561 561 561 561 561 561 561
441.2Materials
Use concrete that conforms to the minimum requirements for Class “B,” as specified in Section 500, except that a one-bag mixer may be used. The requirements of Subsection 500.1.03.G, Cold Weather Concrete Curing and Protection Plan and Subsection 500.3.05.X, Pour Concrete in Cold Weather for cold weather concrete placement are deleted. Place miscellaneous concrete only when the air temperature is 40 °F (4 °C) and rising. Protect concrete from freezing for the first 24 hours. Hand finishing is allowed. Other materials and their Specifications are as follows: Material Section Steel Bars for Concrete Reinforcement 853.2.01 Membrane Curing Compound, Type 2 832.2.03 Dowel and Tie Bars and Reinforcing Steel 853.2.03 Joint Fillers and Sealers 833 Welded Steel Wire for Concrete Reinforcement 853.2.07 441.2.01 Delivery, Storage, and Handling General Provisions 101 through 150.
441.3Construction Requirements
441.3.01 Personnel General Provisions 101 through 150. 441.3.02 Equipment
Forms are subject to the Engineer’s approval. Use forms that are: • Wood or metal that is readily available • Straight and oiled before each use Use metal divider plates and templates. Use the slip form placement method when applicable. If the slip form method does not produce a product with the proper quality, shape, grade, or alignment, the Engineer may require using fixed forms.
Provide weep hole drain pockets filled with coarse aggregate to use with weep hole drain pipe or formed openings according to the plan details. 441.3.03 Preparation Before placing the concrete, excavate for toe walls, edge walls, and weep hole drain pockets; place coarse aggregate in weep hole drain pockets; and grade, finish, and compact the subgrade surface. Use mechanical tamps for compaction if necessary. 441.3.04 Fabrication General Provisions 101 through 150. 562 562 562 562 562 562 562
441.3.05 Construction
See the plans to determine the areas to be paved and the dimensions. Thicknesses are subject to a minus tolerance of 0.5 in. (13 mm). Do not perform overlay pours.
Finish the subgrade for miscellaneous concrete to the line and grade on the Plans and the following:
according to Section 209.
grading for the slope paving. The Bridge Contractor shall complete final grading, compacting, dressing, placing, and maintenance to the structures until completion.
the roadway construction.
excavate wider than necessary to provide working space or to remove soft, unsuitable material. Backfill with selected material.
Use metal parting strips to hold the ends of dowels bent into the grooves.
Mix Class B concrete as specified in Section 500 with the following exceptions:
Subsection 500.3.05.P, Meet the Minimum Placement Rates is waived for miscellaneous concrete.
operation and the operator is certified by the Office of Materials.
Place and finish concrete as follows:
depth to produce the specified thickness. NOTE: Do not place concrete on a muddy or frozen surface.
Subsection 500.3.05.AB, Finish Concrete and complete the following: 1) Concrete Slope Paving. Give a final finish with a stiff-bristle broom. With the Engineer’s approval, mechanically convey the concrete to the forms. 2) Concrete Sidewalks. Give a Type V finish unless otherwise noted on the Plans. Test the surface with a 10 ft. (3 m) straightedge laid parallel to the center line. Eliminate irregularities greater than 0.25 in. (6 mm) per 10 ft. (3 m) while the concrete is still plastic. Ensure that concrete sidewalk constructed as curb cut (wheelchair) ramps has a rough or textured finish. 563 563 563 563 563 563 563
3) Concrete Paved Ditches. Ensure that the surface of the bottom and sides of paved ditches are uniform and true to grade and cross section. Ensure that straight-grade tangents do not deviate more than 1 in. (25 mm) within 10 ft. (3 m) when tested with a 10 ft. (3 m) straightedge. Do not allow deviation if it reduces the ditch paving thickness, causes water to pond, or alters the direction of flow. Finish the ditch paving by floating with wood or metal floats to bring mortar to the surface to cover the coarse aggregate. Use reinforcing that conforms to Plan details if required. 4) Concrete Curbs, Gutters, and Median. Finish according to Subsection 441.3.05.C.2, Placing and Finishing. Remove face forms as soon as possible and finish the exposed surfaces with a wood float. Use a straightedge to test the edge of the gutter and top of the curb and median to conform to the requirements for the adjacent pavement. Irregularities shall not exceed 0.25 in. (6 mm) in 10 ft. (3 m). Place the curb and gutter using a machine as long as the results are satisfactory. 5) Curb Cut Wheel chair Ramps. Construct a Type I, II, or III ramp according to Georgia Standard 9031W. Tie ramps into adjacent paved or unpaved sidewalk and use a rough or textured finish.
Follow these procedures to construct joints on slopes, ditches, sidewalks, and curbs, gutters, and medians.
Place paving on slopes in horizontal or vertical courses, but not a mixture of both. 1) Construct horizontal courses approximately level and at least 3 ft. (1m) but no more than 6 ft. (1.8 m) wide measured along the slope. When needed, construct trapezoidal courses at the top and bottom to accommodate sloping berm and ditch line conditions. 2) Edge the paving at construction joints between courses with a 0.25 in. (6 mm) radius tool. 3) Provide vertical contraction or construction joints spaced along the horizontal course at right angles to the horizontal construction joints at approximately 40 ft. (12 m) intervals, in line not staggered. No other vertical lines will be required in horizontal courses. When using vertical contraction joints, cut them with a tool one-third the depth of the paving during the finishing operation. Edge the contraction joints the same as construction joints. Vertical courses approximately equal and at least 3 ft. (1 m) but no more than 5 ft. (1.5 m) wide across the plane of the slope. The desired width is 4 ft. (1.2 m). Horizontal lines are not required in vertical courses. Separate slope paving from the masonry of structures, sidewalks, curbs, and rigid-type roadway pavements of preformed joint filler that are 0.5 in. (13 mm) thick.
Form joints in concrete paved ditches as follows: 1) Space contraction joints at 30 ft. (9 m) intervals. 2) Place expansion joints only where the paved ditch joins the roadway pavement or some other structure. 3) Do not use joint sealers for expansion or contraction joints.
Form transverse contraction joints using a tool designed to form a groove one-third the depth of the sidewalk at intervals shown on the Plans. Where sidewalks abut the curb and gutter, ensure that alternate joints coincide. Round the edges with a 0.25 in. (6 mm) edger. Make expansion joints according to the materials, dimensions, and locations specified on the plans. 564 564 564 564 564 564 564
Form contraction joints or expansion joints on curbs, gutters, and medians. 1) Contraction Joints. Ensure that joints in curb, gutters, and medians are spaced the same as the joints in paving. Form joints by using metal divider plates or sawing them as in Section 430. Form joints at least one-fifth but not greater than one-fourth the depth of the concrete. Except for sawed joints, finish the joints with a 0.25 in. (6 mm) edging tool. For curbs, gutters, and medians adjacent to pavement other than concrete, contraction joints shall be as follows: • For header curb and combination curb and gutter, install contraction joints spaced no more than 20 ft. (6 m) apart. • For gutter median, install a contraction joints spaced no more than 20 ft. (6 m) apart. 2) Expansion Joints. Form expansion joints according to the plan details or as directed. Ensure that they coincide with the expansion joints in the adjoining pavement or gutter. Cut the joint fillers to the same cross section as the construction. Trim flush the material that protrudes after the concrete is finished. When miscellaneous concrete items are not adjacent to concrete construction, provide expansion joints at an interval of at least 500 ft. (150 m).
Locate and form expansion joints for curb cut wheelchair ramps according to the Special Details for ramp Type A, B, C, or D.
Use curing methods specified in Subsection 430.3.05.L, Cure the Concrete. Ensure that the membrane curing compound is Type 2, if used. Pack honeycombed areas immediately after removing the forms.
Backfill the areas as soon as possible without damaging the work.
When concrete work is complete, clean each surface. Protect the work from stains or other damage until Final Acceptance. 441.3.06 Quality Acceptance General Provisions 101 through 150. 441.3.07 Contractor Warranty and Maintenance General Provisions 101 through 150. 565 565 565 565 565 565 565
441.4Measurement
Concrete slope paving is measured for payment in square yards (meters) of accepted surface area of paving of the
specified thickness. Concrete in toe or edge walls, excavation, backfill, weep holes, and aggregates are not
measured for separate payment.
Concrete sidewalks are measured in square yards (meters) of the specified thickness, complete in place and
accepted. The length is the actual measured length along the surface. The width is the plan width or as directed.
Excavation and backfill are not measured separately for payment.
The area measured for payment is the square yards (meters) of exposed surface area, exclusive of top edges,
of the specified thickness placed according to the plans or as directed. Reinforcing steel, excavation, preparation
of subgrade including Type I backfill, forms, and concrete in toe or edge walls are not measured separately
for payment.
Type II backfill, when required, will be paid according to Section 207.
The following are measured by the linear foot (meter) along the face of the curb:
• Concrete curb and gutter
• Concrete curb
• Concrete header curb
The following are measured by the square yard (meter) or by the linear foot (meter), whichever is specified:
• Concrete gutter
• Concrete valley gutter
• Concrete valley gutter with curb
• Concrete median pavement
• Concrete gutter with raised edge
The length used to compute the square yards (meters) or linear foot (meter) is measured along the center line of
the gutter. The width is the total width of the gutter including the curb or raised edge. Concrete doweled integral
curb includes dowels.
Headwalls are measured for payment according to Subsection 500.4.01.B, Payment per Cubic Yard (Meter) and
Subsection 500.5.01.E, Filler Concrete. Filler concrete, where required, will be paid for at 60 percent of the
Contract Unit Price for Class B concrete.
Concrete spillways regardless of the type specified are measured by the actual number poured complete
and accepted.
Concrete slope drains are measured in square yards (meters) along the surface, complete and accepted.
Velocity dissipators are measured in square yards (meters), surface measure, complete and accepted.
Driveway pavement is measured along the surface from the paving edge or back of the curb to where old and new
concrete join. The width is the average width constructed. 566566566566566566566
For new construction, curb cut wheelchair ramps will not be measured. For new construction, linear feet (meters)
of curb and gutter will include the transitioned curb in front of ramps and square yards (meters) of concrete
sidewalk will include ramps. No additional payment will be made for curb cut ramps.
For existing sidewalks, curb cut wheelchair ramps are measured as the actual number formed and poured,
complete and accepted. No additional payment will be made for sawing existing sidewalk and removal and
disposal of removed material for new ramp construction.
441.4.01 Limits
General Provisions 101 through 150.
441.5Payment
These Items, measured as specified above, will be paid for at the Contract Unit Price per each, per square yard
(meter), per linear foot (meter), or per cubic yard (meter).
Payment will be made under:
Item No. 441 Concrete slope paving [thick] in. (mm) Per square yard (meter)
Item No. 441 Concrete sidewalk (thick) in. (mm) Per square yard (meter)
Item No. 441 Plain concrete ditch paving (thick) in. (mm) Per square yard (meter)
Item No. 441 Reinforced concrete ditch paving (thick) in. (mm), including
reinforcing steel
Per square yard (meter)
Item No. 441 Concrete curb and gutter, (thick) in. (mm)x (width) in. (mm) type___ Per linear foot (meter)
Item No. 441 Concrete header curb, [height] in. (mm), type___ Per linear foot (meter)
Item No. 441 Concrete valley gutter, [thick] in. (mm) Per square yard (meter)
Item No. 441 Concrete valley gutter with curb, [thick] in. (mm) Per square yard (meter)
Item No. 441 Concrete gutter with raised edge, [thick] in. (mm) Per square yard (meter)
Item No. 441 Concrete median [thick] in. (mm) Per square yard (meter)
Item No. 441 Concrete median, corrugated [thick] in. (mm) Per square yard (meter)
Item No. 441 Concrete doweled integral curb, type___ including dowels Per linear foot (meter) 567567567567567567567
Item No. 441 Concrete spillway type___ Per each
Item No. 441 Concrete slope drain Per square yard (meter)
Item No. 441 Velocity dissipators Per square yard (meter)
Item No. 441 Concrete headwalls Per cubic yard (meter)
Item No. 441 Driveway concrete___ in. (mm) thick Per square yard (meter)
Item No. 441 Curb cut wheelchair ramps, Type__ Per each
441.5.01 Adjustments
General Provisions 101 through 150.. 568 568 568 568 568 568 568
Get an email when 441 changes
Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.