Division 500 — Structures

522Shoring

GA · 2021 Standard Specifications✓ Full text on BuildSpecBook pages 824–825 Save this section

Ask about Section 522

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

522.1 General Description

This work consists of furnishing, placing, maintaining, and removing all materials and equipment required for shoring as shown on the Plans and as described in other Special Provisions. It also includes all incidentals and additional work related to shoring.

522.1.01 Definitions

General Provisions 101 through 150.

522.1.02 Related References

A. Related Specifications General Provisions 101 through 150. B. Referenced Documents General Provisions 101 through 150.

522.1.03 Submittals

A. Drawings The Engineer may require the Contractor to submit drawings of the proposed shoring for review. If this is required, the Contractor shall not start work until the Engineer completes the review. The review will not relieve the Contractor of responsibility for the adequate and safe performance of the shoring.

522.2 Materials

Use materials that meet the requirements of the plans and specifications. The Contractor retains ownership of all shoring materials.

522.2.01 Delivery, Storage, and Handling

General Provisions 101 through 150.

522.3 Construction Requirements

522.3.01 Personnel

General Provisions 101 through 150.

522.3.02 Equipment

General Provisions 101 through 150.

522.3.03 Preparation

General Provisions 101 through 150.

522.3.04 Fabrication

General Provisions 101 through 150.

522.3.05 Construction

A. Shoring Design Ensure that shoring is structurally adequate to withstand forces including the following: • Forces and pressures resulting from excavation • Forces and pressures of surcharge loads from adjacent structures, roadbeds, tracks, slopes, and equipment B. Work Standards Ensure this work conforms to the Sequence of Construction outlined on the plans and in the Special Provisions.

522.3.06 Quality Acceptance

General Provisions 101 through 150.

522.3.07 Contractor Warranty and Maintenance

General Provisions 101 through 150.

522.4 Measurement

This work is not measured separately for payment.

522.4.01 Limits

General Provisions 101 through 150.

522.5 Payment

This work will be paid for at the Contract Price for shoring complete in place, maintained, and removed. Payment will be made under: Item No. 522 Shoring Per lump sum

522.5.01 Adjustments

General Provisions 101 through 150.

Get an email when 522 changes

Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction of Transportation Systems, 2021 Edition. Pages 824–825 of 2,050. View official source ↗