528Epoxy Pressure Injection of Concrete Cracks

GA · 2021 Standard Specifications✓ Full text on BuildSpecBook pages 834–835 Save this section

Ask about Section 528

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

528.1 General Description

This work consists of labor, material, equipment, and services necessary for repairing concrete cracks. The plans will specify or the Engineer will determine the extent of repair. The work shall comply with the specifications including Special Provisions where applicable.

528.1.01 Definitions

General Provisions 101 through 150.

528.1.02 Related References

A. Standard Specifications Section 886—Epoxy Resin Adhesives B. Referenced Documents General Provisions 101 through 150.

528.1.03 Submittals

General Provisions 101 through 150.

528.2 Materials

Ensure epoxy used for crack repair complies with the requirements of Section 886, Type V epoxy adhesive. Ensure epoxy used for sealing cracks at the surface is strong enough to withstand injection pressures up to 250 psi (2 MPa).

528.2.01 Delivery, Storage, and Handling

General Provisions 101 through 150.

528.3 Construction Requirements

528.3.01 Personnel

General Provisions 101 through 150.

528.3.02 Equipment

A. Injection Equipment Ensure that dispensing equipment for the injection complies with the following performance requirements: • Self-monitor pressures of 250 psi (2 MPa) for extended periods under flow. • Maintain a ratio of accuracy of one percent at the required pressures. • Mix in-line using a static mixing head. When using screen wire, wire brushes, or other elements for mixing, provide independent certification that the material is mixing thoroughly at the flow rate and temperatures for the job. Also demonstrate that the unit will not dispense resin if the material line is blocked on the supply or dispense side of the system.

528.3.03 Preparation

Before repairing the cracks specified on the Plans, prepare the concrete surfaces next to the cracks by exposing clean and sound concrete. The exact procedures for exposing clean and sound concrete shall be the Contractor’s option and responsibility. However, the procedures must comply with any traffic handling and construction sequencing requirements for the project.

528.3.04 Fabrication

General Provisions 101 through 150.

528.3.05 Construction

Seal concrete cracks as follows: 1. After preparing the concrete surfaces, seal the cracks at the surface with epoxy. Port spacing, location, and port type shall be the Contractor’s option and responsibility. 2. If the voids are not thoroughly penetrated, use the following procedure: a. Wet core on 8 in. (200 mm) centers the holes that are 1/2 in. (13 mm) diameter and 3/4 in (19 mm) to 1 in. (25 mm) depth. b. Insert into the cored holes to the full depth copper or plastic tubes 1/2 in. (13 mm) diameter and notched at the base. c. Seal the circumference of the ports at the surface. d. Inject the epoxy at a constant pressure not to exceed 250 psi (2 MPa) for at least 10 minutes or until penetration occurs. 3. After the injection operation is complete, clean the sealed cracks to the original concrete surface. 4. Remove nipple devices and surface sealers over the injection holes.

528.3.06 Quality Acceptance

General Provisions 101 through 150.

528.3.07 Contractor Warranty and Maintenance

General Provisions 101 through 150.

528.4 Measurement

No measurement for payment will be made for any material, equipment, or labor necessary to accomplish this Work.

528.4.01 Limits

General Provisions 101 through 150.

528.5 Payment

All costs for material, equipment, or labor shall be included in the Lump Sum price bid for Epoxy Pressure Injection of Concrete Cracks. Payment will be made under: Item No. 528 Epoxy Pressure Injection of Concrete Cracks, Bridge No.___ Per lump sum

528.5.01 Adjustments

General Provisions 101 through 150.

Referenced in this section

Get an email when 528 changes

Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction of Transportation Systems, 2021 Edition. Pages 834–835 of 2,050. View official source ↗

Ask about this section

Scoped to Georgia 2021 Standard Specifications, Section 528 — Epoxy Pressure Injection of Concrete Cracks. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.