Division 21 — Earthwork, Subgrades, and Subbases

2128Furnish and Apply Granular Shoulder Material

IA · 2023 Standard SpecificationsBook pages 246249View official source ↗

2128.01DESCRIPTION

Furnish and apply granular material on the shoulder of an existing road for the purpose of shoulder repair. The quantity and rate will be specified for each site in the contract documents. Furnish the material to the locations shown in the contract documents. The Contracting Authority will prepare the surface, shape the material to the desired cross-section, and compact materials. 2128.02

MATERIAL AND EQUIPMENT.

A.

Furnish material meeting the requirements of Section 2121 for Type B Granular Shoulders.

B.

Use weighing equipment meeting the requirements of Article 2001.07.

2128.04

C.

2128.03

Furnish and Apply Granular Shoulder Material

The contract documents may require the Contractor to use an edge rut spreader that will be furnished by the Contracting Authority. The contract documents may require the Contactor to deposit the material directly into a shouldering machine furnished and operated by the Contracting Authority. CONSTRUCTION.

A.

Traffic Control The Contracting Authority will furnish traffic control. All material to be deposited onto a shoulder will be accessible from a closed lane.

B.

Staging of Work Provide the Engineer a minimum of one week notice prior to commencing delivery of materials at a particular site. The hours of delivery, delivery days of the week, delivery requirements, and contact person will be identified in the contract documents. The Contractor will be restricted to a single work site unless otherwise specified in the contract documents.

C.

Placement Spread the material to the width and depth specified in the contract documents. Place granular shoulder material on the subgrade in such manner that no material is deposited on the adjacent pavement surface. If material is inadvertently spilled on the pavement, immediately remove it.

D.

Spreading The Contracting Authority will perform the final spreading of the placed material to the final cross section.

E.

Compaction The Contracting Authority will compact the placed material.

2128.04

METHOD OF MEASUREMENT.

A.

Measurement for Furnish and Apply Granular Shoulder Material satisfactorily placed will be computed from the weights of individual truckloads, including moisture in the aggregate at time of delivery.

B.

Measurement may be converted from tons to cubic yards or cubic yards to tons with approval of the Engineer. The Engineer will determine the conversion factor.

C.

When measurement is by the cubic yard, all loads shall be leveled and corners filled at the loading point. Measurement will be checked at the point of delivery. Deductions will not be made for natural settlement in transit. The tops of end gates on transporting vehicles shall not be lower than the adjacent sides. Weight measurements shall be taken on the Contractor's weighing equipment according to Article 2001.07. Load vehicles to ensure against loss of material between the scales and the point of delivery. Deduction will not be made for the weight of moisture naturally occurring in the material.

Furnish and Apply Granular Shoulder Material

2128.05

2128.05

BASIS OF PAYMENT.

A.

Payment for Furnish and Apply Granular Shoulder Material will be the contract unit price per cubic yard or ton.

B.

Payment is full compensation for: • Furnishing, transporting, and depositing the material on the shoulder according to the contract documents, • Furnishing all equipment, labor, and materials, and • Performance of all work necessary to complete the work.

DIVISION 22. BASE COURSES

Construct base courses on prepared subgrades or subbases. Base courses consist of construction performed according to the requirements specified for the various types in the following sections. Comply with the lines, grades, thicknesses, and typical cross sections shown in the contract documents. If a subbase or other prepared subgrade is not specifically required, prepare the subgrade as provided in Section 2109. 2201. Portland Cement Concrete Base. 2203. Hot Mix Asphalt Base. 2210. Macadam Stone Base. 2212. Base Cleaning and Repair. 2213. Base Widening. 2214. Pavement Scarification. 2216. Cracking and Seating PCC Pavement. 2217. Rubblizing Existing Portland Cement Concrete Pavement.

Source: Iowa Standard Specifications for Highway and Bridge Construction, 2023 Edition. Pages 246249 of 1,288.