Division 24 — Structures

2423Support Structures for Highway Signs, Luminaires, and Traffic

IA · 2023 Standard Specifications✓ Full text on BuildSpecBook pages 558–561 Save this section

Ask about Section 2423

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

Signals

2423.01DESCRIPTION

Fabricate, furnish, and erect support structures for highway signs, luminaires, and traffic signals. Design according to the contract documents and the applicable AASHTO specifications for highway signs, luminaries, and traffic signals.

2423.03

Support Structures for Highway Signs, Luminaires, and Traffic Signals

2423.02MATERIALS

Apply Section 4187. 2423.03

CONSTRUCTION.

A.

General Requirements.

B.

C.

1.

Before fabrication, submit shop drawings according to Article 1105.03.

2.

Provide the Engineer ample notice: • Prior to the start of shop fabrication so that required inspection can be performed, and • Prior to shipment so that final shop inspections can be performed.

3.

Fabricate support structures according to the contract documents. Present proposed design or material changes to the Engineer in written form, plan form, or both. Do not make changes without the Engineer's written approval. The Engineer will not approve substitution of material or design detail changes which constitute a reduction in quality or strength of the structure.

4.

The Contractor is to defend and save the Contracting Authority harmless from any and all patent infringement suits resulting from the use of any design, device, material, process, portion, or phase thereof, employed in the manufacture or use of overhead sign support structures according to the contract documents and Article 1107.04.

Fabrication and Assembly. Fabricate structural steel supports according the Structural Welding Code – Steel, AWS D1.1, current edition, or the Structural Welding Code – Aluminum, AWS D1.2, current edition, with the following exceptions: 1.

Apply AWS D1.1, Section 6, Part D to non-destructive tests of welds for steel structures, and include tests of column-to-base plate full penetration welds. Apply AWS D1.2, Section 5, to non-destructive tests of welds for aluminum structures and limit tests to the flange connections of the overhead section and the end supports.

2.

Apply Article 2408.03, B, relative to qualifications of welders, welding operators, and tackers and the effective period of their qualifications.

3.

The provisions of AWS D1.2, Paragraph 9.1.2 do not apply. Structures are Class II structures.

4.

Clean weld splatter, black smoke, and residue from fabrication before shipping completed structure to the job site. The fabricator is required to warrant that each complete structure is free from misfits or structural deficiencies prior to shipment.

Packing. Pack prefabricated structural units in a manner to prevent damage or defacement during transportation.

Support Structures for Highway Signs, Luminaires, and Traffic Signals 2423.05

D.

Acceptance and Rejection. Failure of the structure to meet requirements of this specification may be cause for rejection.

2423.04METHOD OF MEASUREMENT

Measurement for items for construction of support structures for highway signs, luminaires, and traffic signs will be as follows: A.

Superstructure. Each overhead sign support structure will be counted by the span and type specified and shown in the contract documents.

B.

Substructures. 1.

Excavation: as specified in Article 2402.04 for the class shown in the contract documents.

2.

Concrete: as specified in Article 2403.04.

3.

Reinforcement: as specified in Article 2404.04.

2423.05BASIS OF PAYMENT

Payment for acceptable portions of the following items of work will be at the contract unit price as follows: A.

B.

Superstructure. 1.

For overhead sign support structures, payment will be for each span and type specified.

2.

Payment is full compensation for the following:

a.Furnishing prefabricated structural units, supports, necessary

fastenings for assembly of the structure, anchor bolts, and fittings for bolting the upright supports to the concrete bases.

b.Erection of the structure as designated by the contract documents

or by the Engineer.

Substructures. 1.

Excavation:

a.As specified in Article 2402.05 for the class shown in the contract

documents.

b.Payment is full compensation for excavation, placing backfill

material, compaction of backfill material, replacement and compaction of special shoulder construction materials at the same depth and elevation encountered in the excavation, and depositing of unused excavated materials in a manner satisfactory to the Engineer.

2.

Concrete:

a.As specified in Article 2403.05.

2424.02

Shotcrete

b.

3.

Payment is full compensation for furnishing, placing, and finishing according to the provisions of Section 2405.

Reinforcement: As specified in Article 2404.05.

Get an email when 2423 changes

Iowa revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Iowa Standard Specifications for Highway and Bridge Construction, 2023 Edition. Pages 558–561 of 1,288. View official source ↗

Ask about this section

Scoped to Iowa Standard Specifications for Highway and Bridge Construction, Section 2423 — Support Structures for Highway Signs, Luminaires, and Traffic. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.