Division 25 — Miscellaneous Construction

2555Deliver and Stockpile Salvaged Materials

IA · 2023 Standard Specifications✓ Full text on BuildSpecBook pages 1010–1010 Save this section

Ask about Section 2555

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

2555.01DESCRIPTION

Deliver and stockpile salvaged materials as tabulated in the contract documents. 2555.02 None.

MATERIALS.

2555.03

CONSTRUCTION.

A.

The contract documents will identify the quantity of each item to be salvaged, delivery location, and stockpiling requirements.

B.

Salvage without damaging, disassemble, clean, and match mark (if required) items to be stockpiled. Bundle in lots normal to the product being salvaged. Replace items damaged from Contractor's operations with new materials (at no additional cost to the Contracting Authority).

C.

Deliver salvaged materials, to the location indentified on the contract documents, during normal business hours. Contact the Engineer to schedule delivery and stockpiling of materials at stockpile site.

D.

Stockpile salvaged materials in an orderly fashion without intermingling. Provide blocking as necessary to ensure items are not in contact with soil.

2555.04METHOD OF MEASUREMENT

None. Lump sum item.

2555.05BASIS OF PAYMENT

The lump sum price for Deliver and Stockpile Salvaged Materials will be full payment for salvaging, disassembling, cleaning, match marking, bundling, delivering, blocking, and stockpiling.

Get an email when 2555 changes

Iowa revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Iowa Standard Specifications for Highway and Bridge Construction, 2023 Edition. Pages 1010–1010 of 1,288. View official source ↗

Ask about this section

Scoped to Iowa Standard Specifications for Highway and Bridge Construction, Section 2555 — Deliver and Stockpile Salvaged Materials. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.