General Provisions (00100-00999)

206RESERVED

ID · 2023 Standard SpecificationsBook pages 196196View official source ↗

for Highway Construction Page 160 of 715 SECTION 206 - RESERVED for Highway Construction Page 161 of 715 SECTION 207 – STRIPPING DESIGNATED SOURCE MATERIAL DEPOSITS

207.01 Description.

Strip earth overburden and other unsuitable material from designated source material deposits . Keep topsoil in separate stockpiles from other stripped materials.

207.02 Materials.

Not specified.

207.03 Construction Requirements.

Clear and grub the portion of the source neces sary for the removal of the material and remove earth overburden, vegetation, or other deleterious materials. Dispose of wasted material and debris. The Department will not pay for stripping of overburden from the Contractor -provided material sources . The Department will not pay for the development of alternate material deposits .

207.04 Method of Measurement.

The Engineer will measure acceptably completed work by the cubic yard in its original position or in approved stockpiles, using the average- end-area method.

207.05 Basis of Payment .

The Department will pay for accepted quantities as follows: Pay Item Pay Unit Stripping Designated Source Material Deposits ..................................... CY If the contract does not include a stripping designated source material deposits contract pay item, t his work is incidental and the cost included in other contract pay items when a material source is designated in the contract. Clearing and grubbing is incidenta l and included in the contract unit price for stripping designated source material deposits .

Source: Idaho Standard Specifications for Highway Construction, 2023 Edition. Pages 196196 of 768.