for Highway Construction Page 482 of 715 SECTION 606 – PIPE UNDERDRAINS AND URBAN AND RURAL EDGE DRAINS
606.01 Description.
Provide, plac e, and ins pect pipe underdrains , rural edge drains , and urban edge drain pipes.
606.02 Materials.
Provide materials as specified in: Coarse Aggregate for Concrete (Drain Rock ) (Coarse Aggregate Size 1, 2a, 2b) ....................................................................................... 703.02.C Grout (Mortar) .......................................................................................................................... 705.04 Corrugated PE Drainage Tubing, Perforated and U nperforated .............................................. 706.10 Metallic -Coated Corrugated Steel Underdrains ....................................................................... 706.07 Corrugated Aluminum Pipe for Underdrains ............................................................................ 706.08 PVC Pipe, Perforated and Unperforated .................................................................................. 706.14 Fittings for PE Drainage Tubing .............................................................................................. 706.20 Rodent Protection Devices for Trench Drain ........................................................................... 706.21 Edge Drain Markers ................................................................................................................. 712.10 Subgrade Separation Geotextile , Type III ................................................................................ 718.07 Corrugat ed Steel Pipe, Metallic -Coated, for Sewers and Drains ................................. AASHTO M 36 Provide drain rock that is clean angular quarried or crushed rock. The Department will accept drain rock by certification . Submit quality control test results that represent each 500 tons of drain rock placed, with at least 1 test per contract , including gradation (AASHTO T 27 with no wash required) and sand equivalent (AASHTO T 176) to veri fy the certification. Perform quality control sampling and testing using a qualified independent laboratory and submit the test results. The Contractor may provide a grout product that is on the QPL or submit a proposed mix design for approval. Submit a completed certification ITD-0851 form.
606.03 Construction Requirements.
606.04 Method of Measurement.
The Engineer will measure acceptably completed work by the foot.
606.05 Basis of Payment .
The Department will pay for accept ed quantities as follows: Pay Item Pay Unit Pipe Underdrain ...................................................................................... FT for Highway Construction Page 484 of 71 5 Urban Edge Drain ................................................................................... FT Rural Edge Drain .................................................................................... FT Concrete coring, grout (mortar), or other items necessary to complete the installation are incidental and the cost included in the urban edge drain contract unit price. Video inspection is incidental and included in the contract unit prices for other items. The Department will pay for materials placed over pipe underdrains , urban edge drains, and rural edge drains under their respective contract pay items . for Highway Construction Page 485 of 71 5 SECTION 607 – EMBANKMENT PROTECTORS
607.01 Description.
Provide and install corrugated metal embankment protectors .
607.02 Materials.
Use entrance and exit sections that meet the requirements of AASHTO M 36 or AASHTO M 196. Provide the discharge pipe as specified in 706.06. Use all steel or all aluminum for each assembly.
607.03 Construction Requirements.
Install the entrance device to prevent water from percolating under or around the structure. Install discharge pipe as specified in 602.03. Securely anchor the pipe to the ground surface where it is not possible to provide a trench for the installation.
607.04 Method of Measurement.
The Engineer will measure acceptably completed work as follows:
607.05 Basis of Payment .
The Department will pay for accepted quantities at the contract unit prices as follows: Pay Item Pay Unit Embankment Protector, Type ___ .......................................................... Each Discharge Pipe ....................................................................................... FT The Department will measure and pay for materials necessary to pave the inlet area as specified in 405 or 406. Excavation , backfill, outlet protection, and anchorage are incidental .