for Highway Construction Page 554 of 715 SECTION 633 - RESERVED for Highway Construction Page 555 of 715 SECTION 634 – MAILBOX
634.01 Description.
Remove the existing mailbox assembly and provide and install mailbox assembly.
634.02 Materials.
Provide mailboxes that are approved by the U.S. Postmaster General. Fabricate t he platform, shelf, and brackets in accordance with ASTM A568. Galvanize the supports , platform, shelf, locking wedges, anti -twist plates, bolts , bracket, nuts, screws, washers, and miscellaneous hardware in accordance with A STM A153 Class C/D or ASTM B695 Class 40. Provide mailbox support posts that meet 708.16 and 710.02.
634.03 Construction Requirements.
Remove the existing mailbox assembly and snow shield and return it to the owner. Provide and install a new mailbox assembly and mailbox snow shield as specified or as directed. Verify the number and size of the mailbox, mailbox snow shield, and type of assembly before ordering. Place the name and address as shown on the existing mailbox on the new mailbox or as directed. Maintain continuous access to the mailbox and do not interrupt mail service. The Engineer may approve an acceptable temporary mailbox assembly installed during construction operations before the installation of the new mailbox assembly.
634.04 Method of Measurement.
The Engineer will measure acceptably completed work as follows:
634.05 Basis of Payment .
The Department will pay for accepted quantities at the contract unit prices as follows: Pay Item Pay Unit Mailbox ................................................................................................... Each Mailbox Snow Shield .............................................................................. Each Post, platform, shelf, brackets, and other hardware are incidental and the cost included in the mailbox contract unit price.