for Highway Construction Page 562 of 71 5 SECTION 641 – BIAXIAL GEOGRID
641.01 Description.
Provide biaxial geogrid and all accessories, equipment, and labor necessary to reinforce subgrade or subbase, or similar applications as specified or as directed.
641.02 Materials.
Provide the geogrid manufacturer’s certified test results attesting the geogrid meets the specifications. Provide geogrid certifications signed by the manufacturer’s authorized agent, including the following information about each geogrid to be used:
641.03 Construction Requirements.
Place fill material over the geogrid with low ground pressure (i.e., less than 5 psi) track equipment (e.g., small dozers designed for low ground pressure work). Compact fill mater ial to Class A or as directed. Do not turn track equipment on the first lift of material over areas supported by geogrid. Install geogrid at the locations specified or as directed. Temporarily stretch and secure geogrid in place with staples, pins, sand bags, or backfill as required by fill properties, fill placement procedures, or as directed. Keep the geogrid taut and without wrinkles during t he first fill lift placement. Remove slack in the geogrid a s required by the Engineer. Provide a minimum overlap width of 2 feet or as directed. At transverse joints , install the preceding roll so it overlaps the following roll in the direction that the fill will be placed and spread. Ensure that geogrid sections do not separate at overlaps during fill placement. Cut geogrid placed at corners or curves so there is always a minimum 2 feet overlap. Operate rubber -tired equipment on the geogrid at 5 mph or less and only if the underlying material is capable of supporting the load. Dump and spread the backfill in uniform lifts to maintain the required thickness at all times. Do not spread overlying material closer than 2 feet from geogrid edges before forming overlaps for in stallations requiring adjacent geogrid placements, so that subsequent overlaps can be constructed without having to push material back from geogrid edges. for Highway Construction Page 564 of 71 5 Do not operate track vehicles on the geogrid until there is at least 6 inches of fill material betwe en the geogrid and the tracks. If ruts are created in the fill material due to construction traffic, f ill them with additional fill material. Do not blade adjacent material into the ruts. Repair any geogrid sections that are damaged at no cost to the Department. Ensure all repaired sections contain a minimum 3 feet overlap in all directions .
641.04 Method of Measurement.
The Engineer will measure acceptably completed work by the square yard. A separate measurement will not be made for overlaps.
641.05 Basis of Payment .
The Department will pay for accepted quantities as follows: Pay Item Pay Unit Biaxial Geogrid ....................................................................................... SY 642-644 for Highway Construction Page 565 of 715 SECTIONS 642 -644 - RESERVED for Highway Construction Page 566 of 71 5 SECTION 645 – FIELD LABORATORIES
645.01 Description.
Provide and maintain the specified class of field laboratory at an approved location for the Engineer’s exclusive use for this contract. If the Engineer, or consultant working under the Engineer’s direction, is responsible for damage to the field laboratory or its equipment beyond what is expected during normal use, the Engineer will reimburse the Contractor for the damage at a reasonable replacement or maintenance cost. The Contractor must demonstrate to the Engineer that the damage was beyond normal wear and t ear before the Engineer will reimburse the Contractor for damage.