653RESERVED

ID · 2023 Standard Specifications✓ Full text on BuildSpecBook pages 623–623 Save this section

Ask about Section 653

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

for Highway Construction Page 587 of 715 SECTION 653 - RESERVED for Highway Construction Page 588 of 715 SECTION 654 – COMPOST

654.01 Description.

Provide and apply compost on dist urbed areas, which include areas within the right of way where existing vegetation has been removed or new construction areas, including haul roads. Contact the Engineer before applying compost. Apply as a temporary and permanent erosion control measure m eeting all applicable portions of 212.03.

654.02 Materials.

Provide compost homogeneous in color (e.g., dark loam), with an earthy smell (i.e., not odiferous), and that contains no visible straw or organic or inorganic trash (i.e., maximum of 0.5 percent plastic and less than 1 percent for other trash). Completely decomposed material will be evidenced by total breakdown of raw ingredients and lack of odor or heat generations (i.e., mature and stable exhibiting no anomalous hot -spots).

1.Solvita maturity tes ting: ammonia (NH3) and carbon dioxide (CO2) respiration or temperature self - heating tests (may not reheat to 66°F (20°C) above ambient temperature).
2.Combination evolution rate is greater than 6.
3.Conductivi ty testing is les s than 5 mmhos per centimeter and no greater than 15 mmhos per centimeter.
4.PH of 5.5 to 8.2.
5.Sieve testing requirements: must be friable and pass through a minimum 1 inch- screen.
6.Maximum nutrients allowable:
a.Nitrogen, total (TKN): 1.8 per cent dry weight.
b.Phosphorus total: 3.3 percent dry weight.
7.Maximum physical contaminants (i.e., manufactured manmade inerts):
a.Plastic: 0.5 percent dry weight.
b.Concrete: 1 percent dry weight.
c.Ceramics: 1 percent dry weight.
d.Metal: 1 percent dry weight.
e.Other: 1 percent dry weight.
8.Percent moisture allowable: 0 to 35 percent.
9.Must be certified noxious weed free. The supplier or the Idaho State Department of Agriculture (ISDA) Seed Laborator y will sample every 500 tons of c ompost. Compost tests will be completed and certified by a NAPT -PAP or an independent Seal of Testing Assurance Program -certified laboratory. The following labs are accredited to perform the required tests:
1.Stukenholtz Laboratory; Twin Fall s, ID.

RESERVED in other states

Get an email when 653 changes

Idaho revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Idaho Standard Specifications for Highway Construction, 2023 Edition. Pages 623–623 of 768. View official source ↗

Ask about this section

Scoped to Idaho 2024 Standard Specifications for Highway Construction, Section 653 — RESERVED. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.