Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction

Section 605 — REMOVING OR FILLING EXISTING MANHOLES, CATCH

Illinois Standard Specifications for Road and Bridge Construction, Section 605. Full text, cross-references and related pay items on BuildSpec.

Art. 605.02 Removing or Filling Existing Manholes 540 605.02 Materials. Materials shall be according to the following. Item Article/Section (a) Portland Cement Concrete ..................................................................... 1020 (b) Building Brick (Made from Clay or Shale) .......................................... 1041.01 (c) Concrete Brick ......................................................................................... 1042 CONSTRUCTION REQUIREMENTS 605.03 Removing Existing Manholes, Catch Basins, and Inlets. Existing manholes, catch basins, and inlets designated to…

The rest of Section 605 — REMOVING OR FILLING EXISTING MANHOLES, CATCH is for members

You're reading the opening of Section 605 — REMOVING OR FILLING EXISTING MANHOLES, CATCH. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 605 — REMOVING OR FILLING EXISTING MANHOLES, CATCH — free for 14 daysSign in