Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction

Section 704 — TEMPORARY CONCRETE BARRIER

Illinois Standard Specifications for Road and Bridge Construction, Section 704. Full text, cross-references and related pay items on BuildSpec.

Temporary Concrete Barrier Art. 704.05 627 (d) Connecting Loop Bars (Note 2) (e) Packaged, Dry, Rapid Hardening Mortar or Concrete ............................ 1018 Note 1. Connecting pins and anchor pins shall be according to the requirements of ASTM F 1554 Grade 36 (Grade 250). Note 2. Connecting loop bars shall be smooth bars according to the requirements of ASTM A 36 (A 36M). CONSTRUCTION REQUIREMENTS 704.03 General. Precast concrete barrier shall be the F shape as detailed on the plans. 704.04 Installation. The barriers shall be seated on bare, clean pavement or paved shoulder and…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in