Division 1700 — Miscellaneous Materials

1718Bond-Breaker for Portland Cement Concrete Pavement Dowel Bars

KS · 2015 Standard Specifications✓ Full text on BuildSpecBook pages 817–818 Save this section

Ask about Section 1718

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

1718 – BOND-BREAKER FOR PORTLAND CEMENT CONCRETE PAVEMENT DOWEL BARS 1700-27 BOND-BREAKER FOR PORTLAND CEMENT CONCRETE PAVEMENT DOWEL BARS

1718.1 Description

Bond-breaker is applied to dowel ba rs to be placed in contraction joints in rigid pavement before placement of the concrete. The material serves to prevent the concrete from bonding to the dowel bars, thus preserving the joint as a working one.

1718.2 Requirements

a. Bond-breaker must have an average pull out resistance less than 3400 lbs. b. Bond-breaker must not have any detrimental effects on portland cement concrete or the epoxy coating on the dowel bars. c. Apply bond-breaker accordin g to the manufacturer's instructions. Do not a pply bond-breaker with a thickness value greater than 24 mils. The thickness value is the average of 3 measurements taken at ¼, ½ and ¾ bar length spaced 120 degrees apart. No measurements are permitted to exceed 24 mils. d. Dowels that have bond-breaker applied in the plant by the dowel supplier must be stored in such a way as to prevent dust, dirt or any other contaminant that would impair the bond-breaking action, from accumulating on the treated surface. Pre-coated dowels th at have been stored in the field for any length of time will be inspected to verify that the coating is still active and will perform as required.

1718.3 Test Methods

Test pull out resistance using KDOT Test Method KT MR-16, Testing of Dowel Bars Placed in Concrete for Resistance to Removal (Pull Out).

1718.4 Prequalification

a. All bond-breakers intended for use under this specification must be prequalified before use. Submit a written request to the Bureau Chief of Construction and Mate rials with the following information for each type and brand name:

1.Name, address and telephone number of the manuf acturer. Include the name of the preferred contact person.
2.Brand name of the material.
3.Information regarding recommended usage and application instructions.
4.Material Safety Data Sheets. b. Submit three smooth 1 1/8 inch diameter (No. 9) epoxy coated dowel bars and sufficient bond-breaker material to coat the bars before sample preparation and tes ting. Send the samples to the Engineer of Tests. The bars will be coated, then cast in concrete and the bond tested. Submit one additional No. 9 bar for the noncoated comparison test. All sample bars should be a minimum of 24 inches in length. c. The information and test reports will be reviewed by the Bureau Chief of Construction and Materials. The manufacturer will be advised as to whether or not the product is prequalified. d. The Bureau of Construction and Materials will mainta in a list of prequalified bond-breakers. Products will remain prequalified as long as the formulation and manufacturing processes remain unchanged, and field experience indicates that the material functions appropriately. Changes in formulation or manufacturing processes will require new prequalification testing. Failure of the mate rial to function appropriately in the field will be cause for removal of the product from prequalified status. Pr oducts removed from prequalified status will be again 1718 – BOND-BREAKER FOR PORTLAND CEMENT CONCRETE PAVEMENT DOWEL BARS 1700-28 considered for prequalification if the manufacturer can provide evidence that the cause of failure has been positively identified, and necessary formulation changes and quality control measures have been implemented to eliminate that cause. Complete prequalification testing will be required for products which have been removed from prequalified status.

1718.5 Basis of Acceptance

Prequalification as specified in subsection 1718.4. Receipt and approval of a Type C certification as specified in DIVISION 2600.

Get an email when 1718 changes

Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for State Road and Bridge Construction, 2015 Edition. Pages 817–818 of 978. View official source ↗