2004 - FLY ASH FOR USE IN CONCRETE 2000-7
2004.1 Description
This specification covers fly ash that may be used as a partial replacement for portland cement and blended hydraulic cement in concrete, when allowed by other parts of the Contract Documents.
2004.2 Requirements
a. Fly ash sources must be prequalified. b. Provide material that complies with the chemical and physical requirements of ASTM C 618, Class C or Class F, except the loss on ignition may not exceed 3.0%. The supplementary optional physical requirements apply, except that with the “Effectiveness in Controlling Alkali-Si lica Reaction,” the expansion of the test mixture as a percentage of the low-alkali cement control at 14 days may not exceed 120%. Conduct this testing with 15% fly ash and a Type I/II cement with an alkali content between 0.40% and 0.44%. c. The quality-monitoring program must comply with the minimum sampling and testing frequencies established in ASTM C 311. This frequency may be altered slightly with the approval of the Bureau Chief of Construction and Materials, provided the monitoring intent of ASTM C 311 is met or exceeded. d. There are other requirements that must be met for the fly ash/cement mixture in addition to those cited above for qualification of the fly ash alone. Additional testing will be required for specific applications. Consult the Contract Documents before proposing the use of fly ash in concrete.
2004.3 Test Methods
Sample and test fly ash according to ASTM C 311. Field sample according to Part V, KT-29.
2004.4 Prequalification
a. Becoming Prequalified.
2004.5 Basis of Acceptance
a. Prequalification as specified in subsection 2004.4. b. A proper certification must accompany each shipment of fly ash. Provide to the Field Engineer 2 copies of the bill of lading which includes the following certification statement and the signature of a responsible company representative. Certification Statement The material herein has been sampled and tested as prescribed by KDOT and complies with the applicable specification requirements for Class ___ fly ash. Date________________ Signed_______________________________ Identify the bills of lading with a project number, and denote the fly ash source, the type and the quantity in the shipment. Retain these copies at the project or ready mix plant for the Field Engineer's records. In the case of more than one project being supplied by a ready mix plant, the plant must provide the Field Engineer with a copy of the bill of lading, or a signed listing of the bills of lading representing the fly ash incorporated in each project. Note: Verification samples will be obtained by KDOT pe rsonnel at the project site. Test results which do not comply with the Contract Documents may be considered sufficient cause to rescind approval to furnish fly ash on a certification basis.