Kansas Department of Transportation (KDOT) · KDOT Standard Specifications for Road & Bridge Construction
Section 203 — Resetting Existing Culverts
Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 203. Full text, cross-references and related pay items on BuildSpec.
203 - RESETTING EXISTING CULVERTS 200-6 SECTION 203 RESETTING EXISTING CULVERTS 203.1 DESCRIPTION Remove and reset the existing culverts and end s ections as specified in the Contract Documents. BID ITEMS UNITS Resetting End Section Each Resetting Pipe Culvert Linear Foot 203.2 MATERIALS Provide the required materials that comply with SECTIONS 1000 – 2500. 203.3 CONSTRUCTION REQUIREMENTS Remove the designated structures without damaging. Store and protect the structure from damage, if the structure is not reset immediately. Replace, in kind, any structures or materials damaged or lost. Clean…
The rest of Section 203 — Resetting Existing Culverts is for members
You're reading the opening of Section 203 — Resetting Existing Culverts. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations