Kansas Department of Transportation (KDOT) · KDOT Standard Specifications for Road & Bridge Construction

Section 213 — Prefabricated Vertical Drain

Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 213. Full text, cross-references and related pay items on BuildSpec.

213 PREFABRICATED VERTICAL DRAIN 213.1 DESCRIPTION Excavate for and place geosynthetics to provide a dr ainage pathway for consolidating embankments and foundation soils as shown in the Contract Documents. BID ITEM UNITS Prefabricated Vertical Dr ain Linear Foot 213.2 MATERIALS Provide prefabricated vertical drain that complies with DIVISION 1700. 213.3 CONSTRUCTION REQUIREMENTS a. Qualification of the Prefabri cated Vertical Drain Contractor. At least 1 month before the construction of the prefabricated verti cal drains, provide KDOT’s Bureau of Structures and Geotechnical Services,…

The rest of Section 213 — Prefabricated Vertical Drain is for members

You're reading the opening of Section 213 — Prefabricated Vertical Drain. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 213 — Prefabricated Vertical Drain — free for 14 daysSign in