Kansas Department of Transportation (KDOT) · KDOT Standard Specifications for Road & Bridge Construction
Section 215 — Granular Drainage Blanket
Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 215. Full text, cross-references and related pay items on BuildSpec.
215 GRANULAR DRAINAGE BLANKET 215.1 DESCRIPTION Excavate for, and place aggregate to provide a dr ainage pathway for consolidating embankments and foundation soil as detailed in the Contract Documents. B I D I T E M U N I T S Granular Drainage Blanket (*) Square Yard *Thickness 215.2 MATERIALS Provide aggregate for granular drainage blanket that complies with SECTION 1114. 215.3 CONSTRUCTION REQUIREMENTS After clearing and grubbing, and any required foundation treatment of the embankment, bring the embankment to grade at the bottom of the granular drainage blanket. Place the granular material…
The rest of Section 215 — Granular Drainage Blanket is for members
You're reading the opening of Section 215 — Granular Drainage Blanket. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations