- WOOD FENCE POSTS WOOD FENCE POSTS
2302.1DESCRIPTION
This specification governs wood fence posts.
2302.2REQUIREMENTS
to meet the applicable subsections.
project basis as outlined in subsection 2302.2d.
Chief of Construction and Materials upon written request.
preservative treatment according to subsection 2302.2c.
Department of Commerce.
used. The burden of proof regarding the equality of the proposed rules lies with the supplier.
Documents.
detrimental compression wood. Unsound knots are not permitted. Sound knots will be permitted provided the diameter of the knot does not exceed one-third of the diameter of the post where it occurs.
maximum knot size, will not be allowed.
results: • Douglas Fir with less than 5 annual rings per inch. • Southern Pine with less than 4 annual rings per inch. • None with less than 30% of summer wood.
bottom does not fall outside the center of the post by more than 1 ½ inch.
post by more than ¼ inch per linear foot of post. The diameter of the post must vary uniformly from top to bottom.
post in machine peeling operations. Keep the post free from the glazed surface left by dried sap. Trim all protruding knots flush with the sided of the posts and remove all spurs and splinters. Saw both ends of each post square with the longitudinal axis of the post.
Protection Agency under the Federal Insecticide, Fungicide and Rodenticide Act. - WOOD FENCE POSTS
this specification to meet the applicable subsections in American Wood Protection Association
by the Bureau Chief, Construction and Materials, upon written request.
A: Sawn Products or Commodity Specification B: Posts, or AASHTO M 133.
trimming prior to treatment.
AASHTO M 133.
recorded in pounds per cubic foot (PCF).
“Standard for the Care of Preservative-Treated Wood Products”.
yard for a minimum of 3 days. Retain the material in the treatment yard a minimum of 7 days when the ambient temperature remains below 60°F.
support the material to minimize distortion.
warping.
sufficient drainage to prevent material from being subjected to standing water.
will randomly select a minimum of 1 project or contract containing wood fence posts provided by each of the supplying plants. The Wichita Regional Materials Laborato ry will contact the District administering these projects or contracts for scheduling of the field verification testing. Upon notification of a verification inspection, the Contractor is required to store materials in a manner allo wing easy access for inspection and, upon arrival of the Engineer’s representative, provide adequate manpower for the handling and re-stacking of the product.
and treatment verification testing. A minimum of 20 randomly selected pieces will be graded. In addition, a single sample, consisting of a single boring from each of the same graded pieces, will be treatment tested. Borings will be taken as described in AWPA Standard M2, “Standard for Inspection of Wood Products tr eated with Preservatives” and te sted in accordance with AWPA Standard A9, “Standard Method for Analysis of treated Wood and Treating Solutions by X-Ray Spectroscopy”. If the sample fails to meet the specifications for grading, including additional requirements, or treatment, it is cause for rejecting the entire lot.
representative may randomly resample the lot 1 time only on a 2 to 1 basis, or reject the lot. If the lot is re-sampled, then both samples must pass, or the entire lot is rejected. The results of the resample specimens will replace the initial test results.
rejected lot from the job storage site.
KDOT. Excessive inspections for replacement of rejected material may be charged to the Contractor. - WOOD FENCE POSTS
2302.3BASIS OF ACCEPTANCE
analysis of the wood fence posts delivered to the project. Include a report of the preservative treatment analysis. Mail a copy of the reports to the Wichita Regional Materials Laboratory, Bldg. 1, 3200 E 45th N, Wichita, KS 67220. Verify that the project number and/or the contract number are on each report.
documents the project number, wood fence post sizes, job, or producer order numbers, and the total number of wood fence posts delivered to the project.
delivered to the project comply with this specification, and that the preservative treatment complies with the applicable AWPA standards. The documentation must bear the signature and title of an official of the plant with contract binding authority. This requirement may be included on the test reports referenced in subsection 2302. 3 a.
minimum specified treatment recorded in PCF.
inspection for the quality of workmanship and the deliver y condition and approval of the associated required documentation.
Get an email when 2302 changes