- MATERIALS CERTIFICATIONS MATERIALS CERTIFICATIONS
2601.1DESCRIPTION
This specification governs the requirements for the cont ent and distribution of certifications when dictated, in part or in whole, as the basis of acceptance for a material.
2601.2REQUIREMENTS
proper destinations prior to use of the material and allowing sufficient time for review as stated herein.
manufacturer. Also include the lot or heat number referenced in the certification, the serial number if applicable, and the date of manufacture if available.
submitted, the quantity should be listed per lot/heat number.
the certification.
by responsible organization, number, section reference or other appropriate identification.
requirements for the various types of certifications in subsection 2601.2b below.
manufacturer’s certification(s). An example of a cover sheet is included at the end of this specification. Verify that the cover sheet and certification(s) are so well cross referenced and identified as a unit that they can be reunited if accidently separated.
information with regard to the typical quantity of material and production time intervals represented by these numbers. Also include the dates of manufacture for the lots or heats involved. This information will be evaluated by the KDOT and may constitute a basis for rejection if the quantities or time intervals are considered excessive.
required by other applicable specifi cations. However, the document must clearly identify the organization submitting the report or certification. The organization submitting certifications, re ports, and related written statements is responsible for the contents of these documents whether they are signed or not.
manufacturer’s or other qualified laboratory on samples obtained from the lot or lots of material in the shipment. When a mill test report is submitted as the laboratory report, the quantity in the shipment does not need to be included on the report, provided that the identifying heat or lot numbers involved are roll stamped, embossed, or durably affixed to each item of material in the shipment represented by the report. In this case, provide the necessary quantity information on a cover sheet, clearly identifying the quantity of each heat or lot in the shipment.
minimum range of the manufacturer’s quality control test results as determined by the manufacturer’s or other qualified laboratory. These summaries must provide data on all major specification requirements. Also include the range of lots and manufacture dates represented by the data. When combining multiple components into a single item, submit a detailed parts summary indicating the lot/heat number, part description and quantity for each part. Summary reports dated more than six months prior to the date of manufacture or shipment of the product will not be - MATERIALS CERTIFICATIONS accepted. The Engineer of Tests may also request copies of detailed test reports for material produced during a specified time interval for verification of the certification.
shipment is essentially the same as material that is prequalified.
or more components or materials. These components or materials have been approved previously on an individual basis for KDOT projects, but lose their identity when they are incorporated into an assembly or structure. This certification would apply to signs, overhead sign and lighting structures, etc. The certification is to state that all the components or materials used in the fabrication of the represented assembly or structure were previously approved for KDOT use.
certifications of Type “A”, Type “B”, Type ”C”, and Ty pe ”D” certifications. The fabricator or assembler of individual items is responsible for preparing a Type “E” certification.
certification. If deviations from the applicable specifications are found, the results will be reviewed by the Engineer to determine the final disposition of the material or produc t. Serious deviations may be cause for removal from prequalified status.
Materials and Research Center Attn: Materials Certification Technician 2300 Van Buren Topeka, KS 66611 E-mail address: typeABcerts@ksdot.org These certifications will be evaluated for compliance with the applicable specifications as well as this section. The appropriate personnel will be notified of a certification’s disposition status through the issue of a hardcopy or electronic report, whichever is most expedient.
Certification Technician, or the Engineer of Tests unless they are specifically requested.
utilized in a project.
preparation site. Prepare these certifications under the signature of the aggregate producer or their designated representative.
locations of the deposits from which they were produced.
certifications state that the aggregates were removed from a KDOT tested and approved stockpile at the production site, or that they were removed from a plant while it was producing aggregate that was in compliance with the applicable specifications.
aggregates are produced for KDOT and non-KDOT use, provide certifications stating that only KDOT tested and approved aggregate was provided for the KDOT projects.
Engineer a certification. This certification is to be under the signature of the aggregate producer or - MATERIALS CERTIFICATIONS their designated representative and state that all a ggregates to be provided for the project are in compliance with all the applicable KDOT specifications.
and (2) of this specification to the Engineer. These certifications apply to all aggregates that were delivered to the project or product preparation site and ultimately used in the project. These certifications are to indica te the approximate quantities in tons or cubic yards of each aggregate delivered to the project and the approximate quantities in tons or cubic yards of each aggregate delivered to the product preparation site and incorporated into a product that was utilized in the project.
2601.3TEST METHODS
Not applicable.
2601.4PREQUALIFICATION
Not applicable.
2601.5BASIS OF ACCEPTANCE
When certifications are incorporated into a material or product specification, acceptance will be based on the following:
requirements of specifications unique to the product or material.
inspection for the quality of workmanship and the delivery condition. - MATERIALS CERTIFICATIONS Date: Submitted by: (include name, address, phone number, email address) (Note, as per the specification, although the Contractor is responsible to submit certifications, the party submitting them is respo nsible for the contents of this certification packet.) Kansas Department of Transportation Materials Certifications 2300 Van Buren Topeka, Kansas Project Number: Contract Number: Line Number: Item Code: Contractor Name: ID Markings on Shipment: Additional Information: This is to certify that the following items furnished by our firm for use on the reference project meet or exceed the requirements of section of the edition of the Kansas Department of Transportation Standard Specification. or This is to certify that the following items furnished by our firm for use on the reference project meet or exceed the requirements of special provision of the edition of the Kansas Department of Transportation Standard Specification. Quantity Description Heat/Lot Manufacturer Total quantity if applicable PAY ITEMS INDEX I-1 A Abutment Strip Drain ......................................................................................................................................... 700-104 Abutment Aggregate Drain ................................................................................................................................. 700-104 Adjustment of Catch Basins ................................................................................................................................. 800-50 Adjustment of Curb Inlets .................................................................................................................................... 800-50 Adjustment of Existing Structures ........................................................................................................................ 800-50 Adjustment of Manholes ........................................................................................................ .............................. 800-50 Adjustment of Manholes (Set Price) ..................................................................................................................... 800-50 Adjustment of Meter Box ....................................................................................................... .............................. 800-50 Adjustment of Valve Box ..................................................................................................................................... 800-50 Aggregate Backslope Ditch Lining ...................................................................................................................... 800-84 Aggregate Base ..................................................................................................................................................... 300-13 Aggregate Ditch Lining ........................................................................................................................................ 800-84 Aggregate for Blanket Underdrains ...................................................................................................................... 800-63 Aggregate for Microsurfacing .............................................................................................................................. 600-44 Aggregate for Shoulders (AS-1) ........................................................................................................................... 800-97 Aggregate for Subgrade Modification .................................................................................................................... 300-1 Aggregate Shoulder .............................................................................................................................................. 300-11 Agricultural Limestone ......................................................................................................................................... 900-12 Anti-Graffiti Coating .......................................................................................................................................... 800-114 Area Prepared for Patching ................................................................................................................................. 700-116 Area Prepared for Patching (Set Price) ............................................................................................................... 700-116 Area Prepared for Patching (Full Depth) ............................................................................................................ 700-116 Area Prepared for Patching (Full Depth) (Set Price) .......................................................................................... 700-116 Area Prepared for Patching (Poured with Overlay) ............................................................................................ 700-116 Arrow Display ...................................................................................................................................................... 800-13 Asphalt Cement .................................................................................................................................................... 600-49 Asphalt Core (Set Price) ......................................................................................................................................... 600-2 Asphalt Pavement Patching .................................................................................................................................. 800-86 Asphalt Pavement Smoothness ............................................................................................................................. 600-33 Asphalt Rejuvenating Agent ................................................................................................................................. 600-41 B Barricade (Type 3) (Fixed) ................................................................................................................................... 800-38 Bearing ....................................................................................................................... .......................................... 700-32 Bedding for Slope Protection ................................................................................................................................ 800-82 Bench .................................................................................................................................................................... 900-27 Benchmark Monument (Concrete Cylinder) .......................................................................................................... 800-2 Bicycle Rack ......................................................................................................................................................... 900-27 Biodegradable Log ............................................................................................................. .................................. 900-27 Blotter Sand .......................................................................................................................................................... 600-32 Bored, Jacked or Tunneled Pipe ........................................................................................................................... 800-50 Bridge Approach Slab Footing ........................................................................................................................... 800-132 Bridge Backwall Protection System ................................................................................................................... 700-103 Bridge Curb Repair ............................................................................................................................................. 700-108 Bridge Deck Drain Extension ............................................................................................................................. 700-122 Bridge Deck Grooving .......................................................................................................... ................................ 700-40 Bridge Drainage System ..................................................................................................................................... 700-122 Bridge Handrail .................................................................................................................................................... 700-98 INDEX OF PAY ITEMS I-2 Bridge Mounted Sign Attachment ........................................................................................................................ 700-99 Bridge Painting ..................................................................................................................................................... 700-65 Bridge Repair ...................................................................................................................................................... 700-107 Butterfly Overhead Sign Structure ....................................................................................................................... 700-99 C Calcium Chloride .................................................................................................................................................... 300-1 Cantilever Sign Structure ...................................................................................................................................... 700-99 Cased Pile ........................................................................................................................................................... 700-148 Cast Iron ............................................................................................................................................................... 800-50 Cast Steel .............................................................................................................................................................. 800-50 Cast Steel Pile Points ............................................................................................................................................ 700-15 Catch Basin ........................................................................................................................................................... 800-48 Cement .................................................................................................................................................................... 300-1 Cement Treated Base ............................................................................................................................................ 300-15 Channelizer (Fixed) .............................................................................................................................................. 800-13 Channelizer (Pedestrian) ....................................................................................................................................... 800-13 Channelizer (Portable) .......................................................................................................................................... 800-13 Class * Excavation .................................................................................................................................................. 200-7 Cleaning Existing Structures .............................................................................................................................. 800-110 Cleaning Existing Underdrains ........................................................................................................................... 800-110 Clearing and Grubbing ........................................................................................................................................... 200-1 Cold Recycled Asphalt Material ........................................................................................................................... 600-38 Comfort Station .................................................................................................................................................... 900-27 Comfort Station (Modification) ............................................................................................................................ 900-27 Common Excavation ............................................................................................................................................ 200-12 Common Excavation (Contractor-Furnished) ....................................................................................................... 200-12 Common Excavation (Unstable) ........................................................................................................................... 200-12 Common Excavation (Unsuitable)........................................................................................................................ 200-12 Compaction of Earthwork (Type *) (MR-**) ....................................................................................................... 200-12 Concrete ................................................................................................................................................................ 700-40 Concrete (Grade **) ............................................................................................................................................... 200-5 Concrete Backslope Ditch Lining ......................................................................................................................... 800-84 Concrete Core (Set Price) ...................................................................................................................................... 500-1 Concrete Ditch Lining .......................................................................................................................................... 800-84 Concrete for Seal Course (Set Price) ...................................................................................................................... 200-7 Concrete Headwall ............................................................................................................. .................................. 800-51 Concrete Masonry Coating ................................................................................................................................. 700-106 Concrete Parking Block ...................................................................................................................................... 800-130 Concrete Pavement (* Uniform) (AE) .................................................................................................................... 500-1 Concrete Pavement (* Variable) (AE) .................................................................................................................... 500-1 Concrete Pavement Smoothness ........................................................................................................................... 500-37 Concrete Safety Barrier ........................................................................................................................................ 800-33 Concrete Safety Barrier (Temporary - Relocate) .................................................................................................. 800-33 Concrete Safety Barrier (Temporary) ................................................................................................................... 800-33 Concrete Safety Barrier Temporary - Installation Only) ...................................................................................... 800-33 Concrete Surface Repair ....................................................................................................................................... 800-73 Contractor Construction Staking ............................................................................................................................ 800-2 Core Hole (Investigative) ....................................................................................................................................... 700-6 INDEX OF PAY ITEMS I-3 Corrugated Metal Sheet Piling ................................................................................................................................ 700-2 Cover Material ...................................................................................................................................................... 600-49 Cross Road Pipe ............................................................................................................... .................................... 800-51 Crushed Stone for Backfill ................................................................................................................................. 800-101 Crushed Stone Subgrade ....................................................................................................................................... 300-12 Curb and Gutter, Combined ................................................................................................................................. 800-70 Curb and Gutters, Asphaltic Concrete .................................................................................................................. 800-70 Curb Repair ................................................................................................................... ....................................... 800-70 Curb, Asphaltic Concrete....................................................................................................... ............................... 800-70 Curb, Edge ............................................................................................................................................................ 800-70 Curb, Header ........................................................................................................................................................ 800-70 Curb, Protection .................................................................................................................................................... 800-70 Curing Environment ............................................................................................................................................. 400-25 Cutback Asphalt ................................................................................................................................................... 600-47 D Drilled Shaft .......................................................................................................................................................... 700-6 Drilling and Grouting ......................................................................................................................................... 800-105 Drilling and Grouting (Repair) (Set Price) ......................................................................................................... 800-105 E Early Strength Concrete Pavement (* Uniform) (AE) ........................................................................................... 500-1 Early Strength Concrete Pavement (* Variable) (AE) ........................................................................................... 500-1 Elastomeric Bearing Pad ...................................................................................................... ............................... 700-32 Electric Conduit ................................................................................................................................................... 800-44 Electric Lighting System ...................................................................................................................................... 800-44 Electric Service Box ............................................................................................................................................. 800-44 Embankment ......................................................................................................................................................... 200-12 Embankment (Contractor-Furnished) ................................................................................................................... 200-12 Emergency Vehicle System .................................................................................................................................. 800-44 Emulsified Asphalt ................................................................................................................................................. 600-2 Emulsified Asphalt (CSS) (Special) .................................................................................................................... 600-38 Emulsified Asphalt (CSS-1H or SS-1H) Cure (Set Price) .................................................................................... 600-38 Emulsified Asphalt (Emulsion Bonding Liquid .................................................................................................. 600-68 Emulsified Asphalt (Modified) ............................................................................................................................. 600-44 Encasement Pipe ................................................................................................................................................... 800-58 End Section .......................................................................................................................................................... 800-51 Entrance Pipe ........................................................................................................................................................ 800-51 Environmental Protection ..................................................................................................................................... 700-65 Epoxy Resin Crack Repair....................................................................................................... ........................... 700-114 Eradication of Traveled Way ................................................................................................................................ 200-12 INDEX OF PAY ITEMS I-4 Expansion Device (Modular) ................................................................................................................................ 700-33 Erect and Remove Rolled Beam Detour Bridge ................................................................................................ 700-152 Erosion Pipe .......................................................................................................................................................... 800-51 Expansion Device (Finger Plate) .......................................................................................................................... 700-33 Expansion Device (Modular) ................................................................................................................................ 700-33 Expansion Joint .............................................................................................................. ..................................... 700-95 Extra Work Saw Cuts (Set Price) ......................................................................................................................... 800-86 F Falsework Inspection ............................................................................................................................................ 700-35 Fence ......................................................................................................................... ........................................... 800-77 Fence (Removal and Resetting) ............................................................................................................................ 800-77 Fence (Removal of Existing) ................................................................................................................................ 800-77 Fence (Temporary) ............................................................................................................................................... 800-77 Fertilizer ................................................................................................................... ........................................... 900-12 Field Office ............................................................................................................................................................. 800-8 Field Office and Laboratory .................................................................................................................................. 800-8 Filter Sock .................................................................................................................. ........................................... 900-7 Flagger (Set Price) ................................................................................................................................................ 800-13 Flapgate ................................................................................................................................................................ 800-62 Flexible Raised Pavement Marker (4" Broken (3 ft.)) .......................................................................................... 800-13 Flexible Raised Pavement Marker (4" Broken (8 ft.)) .......................................................................................... 800-13 Floodgates ............................................................................................................................................................. 800-77 Flowable Fill ....................................................................................................................................................... 800-107 Flume Inlet ............................................................................................................................................................ 800-61 Fly Ash ................................................................................................................................................................... 300-1 Fly Ash (Undersealing) ........................................................................................................ ................................ 800-90 Fly Ash Slurry Grout ............................................................................................................................................ 800-51 Foundation Stabilization ......................................................................................................................................... 200-7 Foundation Stabilization (Set Price) ....................................................................................................................... 200-7 Furnish and Remove Beam Detour Bridge ......................................................................................................... 700-152 Furnishing and Planting Plant Materials ............................................................................................................... 900-19 G Gabions ................................................................................................................................................................. 800-85 Gate .......................................................................................................................... ............................................ 800-77 Geofoam-Fill ........................................................................................................................................................ 200-26 Geofoam-Void Fill ............................................................................................................. .................................. 200-27 Geomembrane ..................................................................................................................................................... 800-115 Geosynthetic Reinforcement (for Base) ............................................................................................................... 300-23 Geotextile (Erosion Control) .................................................................................................................................. 900-7 Geotextile Fabric .................................................................................................................................................. 800-82 Grade 3.0 Concrete ............................................................................................................................................... 800-67 Granular Backfill .................................................................................................................................................... 200-7 Granular Backfill (Wingwalls) (Set Price) ............................................................................................................. 200-7 Granular Base ....................................................................................................................................................... 300-22 Granular Drainage Blanket ................................................................................................................................... 200-31 Grate ..................................................................................................................................................................... 900-27 Grill ......................................................................................................................... ............................................. 900-27 Grinding Concrete Surface ................................................................................................................................... 800-99 Guardrail End Terminal ........................................................................................................................................ 800-75 INDEX OF PAY ITEMS I-5 Guardrail Posts ..................................................................................................................................................... 800-75 Guardrail, Cable............................................................................................................... ..................................... 800-75 Guardrail, Reconstruction of Cable ...................................................................................................................... 800-75 Guardrail, Reconstruction of Steel Plate ............................................................................................................... 800-75 Guardrail, Removal and Reconstruction of Cable ................................................................................................ 800-75 Guardrail, Removal and Reconstruction of Steel Plate ......................................................................................... 800-75 Guardrail, Removal of Cable ................................................................................................................................ 800-75 Guardrail, Removal of Steel Plate ........................................................................................................................ 800-75 Guardrail, Removal of Timber ............................................................................................................................. 800-75 Guardrail, Steel Plate ............................................................................................................................................ 800-75 Guardrail, Steel Plate (Temporary) ....................................................................................................................... 800-75 Guideposts ............................................................................................................................................................ 800-75 Guideposts, Removal and Resetting of ................................................................................................................. 800-75 Guideposts, Removal of ........................................................................................................ ............................... 800-75 Guideposts, Resetting of ....................................................................................................................................... 800-75 Gutters .................................................................................................................................................................. 800-70 Gutters, Asphaltic Concrete .................................................................................................................................. 800-70 H Handrail ................................................................................................................................................................ 700-98 High Mast Light Tower ...................................................................................................................................... 700-136 Heat Straightening Repair...................................................................................................... ............................. 700-149 HMA Base .............................................................................................................................................................. 600-2 HMA Overlay ......................................................................................................................................................... 600-2 HMA Pavement ...................................................................................................................................................... 600-2 HMA Pavement Shoulder ....................................................................................................................................... 600-2 HMA Surface .......................................................................................................................................................... 600-2 HMA Surface (Ultrathin Bonded) ........................................................................................................................ 600-68 HMA–Commercial Grade (Class *) ..................................................................................................................... 600-62 HMA–Commercial Grade (Class *) (Patching) .................................................................................................... 600-62 HMA–RCI (PG 70-28 RCI)......................................................................................................... ......................... 600-80 I Impact Attenuator ................................................................................................................................................. 800-36 Impact Attenuator (Temporary) ............................................................................................................................ 800-36 Inertial Barrier System .......................................................................................................................................... 800-35 Injection Holes ...................................................................................................................................................... 800-90 Inlet ....................................................................................................................................................................... 800-48 Intelligent Transportation System (ITS) ............................................................................................................. 800-133 J Jacking of Existing Structure .............................................................................................................................. 700-107 Junction Box ......................................................................................................................................................... 800-48 L Landscape Retaining Wall .................................................................................................................................. 800-104 Light Type Surfacing .......................................................................................................................................... 800-104 Lime ........................................................................................................................................................................ 300-4 INDEX OF PAY ITEMS I-6 Lime (Hydrated) (Slurry) ...................................................................................................................................... 600-38 Linear Grading ...................................................................................................................................................... 200-23 Liner Pipe ............................................................................................................................................................. 800-43 Loop Detector Replacement ................................................................................................................................. 800-44 Loop Detector Replacement (Set Price) ............................................................................................................... 800-44 M Machine Preparation ........................................................................................................................................... 700-121 Mailbox Installation (Set Price) .......................................................................................................................... 800-113 Maintenance and Restoration of Haul Roads (Set) ............................................................................................... 800-11 Manhole ................................................................................................................................................................ 800-48 Manipulation (Chip Seals) .................................................................................................................................... 600-49 Manipulation (D.A.S.T.) ....................................................................................................................................... 600-57 Manipulation (Lime Treated Subgrade) ................................................................................................................. 300-4 Manipulation (S.A.S.T.) ....................................................................................................................................... 600-53 Manipulation for Aggregate for Subgrade Modification ........................................................................................ 300-1 Manipulation for In-Place Material Subgrade Modification ................................................................................... 300-1 Manipulation for Treated Subgrade ........................................................................................................................ 300-9 Material for HMA Patching (Set Price) .................................................................................................................. 600-2 Material for Portland Cement Concrete Overlay (Set Price) ................................................................................ 700-91 Material for Slurry Polymer Concrete Overlay (Set Price) ................................................................................. 700-138 Millling ................................................................................................................................................................. 600-67 Mineral Filler ........................................................................................................................................................ 600-44 Mobilization .................................................................................................................. ......................................... 800-1 Mobilization (DBE) ................................................................................................................................................ 800-1 Mobilization (Emergency Erosion Control) (Set Price) ......................................................................................... 900-1 Monument Box ....................................................................................................................................................... 800-2 Mowing ........................................................................................................................ ........................................ 900-23 MSE Fill ............................................................................................................................................................... 200-29 Mulching (Hydro) ................................................................................................................................................. 900-15 Mulching (Hydro BFM) ....................................................................................................................................... 900-15 Mulching (Permanent) (Set Price) ........................................................................................................................ 900-15 Mulching (Temporary) ........................................................................................................................................... 900-7 Mulching Tacking Slurry ...................................................................................................................................... 900-15 Multi-Layer Polymer Concrete Overlay ............................................................................................................. 700-109 O Outlet .................................................................................................................................................................... 800-48 Overhaul ............................................................................................................................................................... 200-22 Overhead Sign Structure ....................................................................................................................................... 700-99 Overhead Sign Structure (Mast Arm Type) .......................................................................................................... 700-99 Overhead Sign Structure (Single Tapered Tube) .................................................................................................. 700-99 P Pavement Edge Wedge (Earth) ............................................................................................................................. 800-97 Pavement Edge Wedge (Rock) ............................................................................................................................. 800-97 Pavement Marking ................................................................................................................................................ 800-24 Pavement Marking (Paint) ................................................................................................................................... 800-30 Pavement Marking (Temporary) 4" Broken (3 ft.) (*) ........................................................................................ 800-13 INDEX OF PAY ITEMS I-7 Pavement Marking (Temporary) 4" Broken (8 ft.) (*) ......................................................................................... 800-13 Pavement Marking (Temporary) 4" Dotted Extension (*) ................................................................................... 800-13 Pavement Marking (Temporary) 4" Solid (*) ....................................................................................................... 800-13 Pavement Marking (Temporary) Broken (Line Masking Tape) ........................................................................... 800-13 Pavement Marking (Temporary) Solid (Line Masking Tape) .............................................................................. 800-13 Pavement Marking (Temporary) Symbol (*) ....................................................................................................... 800-13 Pavement Marking Removal ................................................................................................................................ 800-32 Pavement Marking Removal (Plowable Raised Marker) ..................................................................................... 800-32 Pavement Marking Symbol (Paint) (White) ......................................................................................................... 800-30 Pavement Marking Symbol (White) ..................................................................................................................... 800-24 Pavement Waterproofing Membrane .................................................................................................................. 800-117 Paving Brick ....................................................................................................................................................... 800-129 Paving Fabric ...................................................................................................................................................... 800-118 PCCP Edge Joint Patching ...................................................................................................... ............................. 800-86 PCCP Joint and Crack Patching ........................................................................................................................... 800-86 PCCP Patching (Full Depth) ................................................................................................................................. 800-86 Peat Moss...................................................................................................................... ........................................ 900-12 Permanent Casing (Set Price) ................................................................................................................................. 700-6 Piles ...................................................................................................................................................................... 700-15 Pipe (Bored, Jacked or Tunneled) ........................................................................................................................ 800-59 Pipe Basedrains ............................................................................................................... ................................... 800-136 Pipe Underdrains .................................................................................................................................................. 800-63 Planter Unit ........................................................................................................................................................... 900-27 Plugging Wells ................................................................................................................................................... 800-131 Polymer Concrete Overlay Repair ...................................................................................................................... 700-143 Portable Changeable Message Sign ...................................................................................................................... 800-13 Portland Cement Concrete Overlay ...................................................................................................................... 700-91 Posts (Corner) ....................................................................................................................................................... 800-77 Posts (End) ............................................................................................................................................................ 800-77 Posts (Pull) ............................................................................................................................................................ 800-77 Post-Tensioning for Slab Bridge .......................................................................................................................... 700-84 Power Wash .......................................................................................................................................................... 700-65 Precast Arch Culvert ............................................................................................................................................ 800-57 Precast Rigid Frame Culvert ................................................................................................................................ 800-57 Pre-Drilled Pile Holes ........................................................................................................................................... 700-15 Prefabricated Interception Device ....................................................................................................................... 800-66 Prefabricated Vertical Drain ................................................................................................................................ 200-28 Prestressed Concrete Beams ................................................................................................................................ 700-76 Prestressed Concrete Panels ................................................................................................................................. 700-76 Q Quality Control Testing (CTB) ............................................................................................................................. 300-15 Quality Control Testing (HMA) ............................................................................................................................. 600-2 Quality Control Testing (PCCP) ............................................................................................................................. 500-1 R Raise Expansion Device ..................................................................................................................................... 700-107 Reinforced Concrete Box (Precast) .................................................................................................................... 700-125 Reinforcing Steel .................................................................................................................................................. 700-50 INDEX OF PAY ITEMS I-8 Reinforcing Steel (Repair) (Set Price) .................................................................................................................. 700-50 Removal of and Reconstruction of Existing Structures .......................................................................................... 200-3 Removal of Asphalt Material .............................................................................................................................. 800-101 Removal of Existing Structures .............................................................................................................................. 200-3 Remove and Reset Expansion Device ................................................................................................................ 700-107 Remove and Reset Sign Structure ....................................................................................................................... 700-99 Replacement Modules .......................................................................................................................................... 800-35 Reset Existing Bearing ....................................................................................................................................... 700-107 Reset Sign Structure ............................................................................................................................................ 700-99 Resetting End Section ............................................................................................................................................. 200-6 Resetting Pipe Culvert ............................................................................................................................................ 200-6 Retaining Wall .................................................................................................................................................... 800-119 Right-of-Way Survey Monument ........................................................................................................................... 800-2 Rigid Raised Pavement Marker (*) ...................................................................................................................... 800-13 Riprap ................................................................................................................................................................... 800-81 Rock Excavation ................................................................................................................................................... 200-12 Rock Excavation (Non-Durable Shale) ................................................................................................................ 200-12 Rubblized Concrete .......................................................................................................................................... 800-1001 Rumble Strips (Milled) ......................................................................................................................................... 800-43 Rumble Strips (Milled) (Centerline) ..................................................................................................................... 800-43 Rumble Strips (Milled) (Edgeline) ....................................................................................................................... 800-43 S Salvaged Topsoil .................................................................................................................................................. 200-25 Sanitary Sewer ...................................................................................................................................................... 800-51 Sanitary Sewer System ......................................................................................................................................... 800-51 Saw and Seal Joint (HMA) ................................................................................................................................... 600-92 Sealing Asphalt Cracks (> ½" <2") ...................................................................................................................... 800-92 Sealing Asphalt Cracks (>⅛" ≤ ½") ..................................................................................................................... 800-92 Sealing Longitudinal Asphalt Shoulder Joint ....................................................................................................... 800-92 Sealing PCCP Cracks (>⅛" <2") .......................................................................................................................... 800-92 Sealing PCCP Joints (Longitudinal) ..................................................................................................................... 800-92 Sealing PCCP Joints (Transverse) ........................................................................................................................ 800-92 Sealing Spalled PCCP Joints & Cracks (>2" ≤3") ................................................................................................ 800-92 Sealing Spalled PCCP Joints & Cracks, Type A or B (>2" ≤3") .......................................................................... 800-92 Sediment Removal (Set Price) ................................................................................................................................ 900-7 Seed ...................................................................................................................................................................... 900-13 Seed (Hydro) .................................................................................................................. ...................................... 900-13 Seeding ................................................................................................................................................................. 900-13 Select Soil ............................................................................................................................................................. 200-21 Select Soil (Contractor-Furnished) ....................................................................................................................... 200-21 Separation Geotextile ......................................................................................................... ................................ 800-116 Shot-crete .............................................................................................................................................................. 800-64 Shoulders (Aggregate) (HMA Widening) ............................................................................................................ 800-97 Shoulders (Earth) (HMA Widening) .................................................................................................................... 800-97 Sidewalk Construction ......................................................................................................................................... 800-67 Sidewalk Ramp ..................................................................................................................................................... 800-67 Sidewalk Ramp (Detectable Warning) ................................................................................................................. 800-67 Sign (High Performance) ...................................................................................................................................... 800-38 Sign (Remove and Reset) ..................................................................................................................................... 800-38 Sign Post (3 I 2.25 Aluminum) ............................................................................................................................. 800-38 Sign Post (4" x 6" Structural Steel) ..................................................................................................................... 800-38 Sign Post (4" x 6" Wood) .................................................................................................................................... 800-38 INDEX OF PAY ITEMS I-9 Sign Post (Perforated Square Steel Tube) ............................................................................................................. 800-38 Sign Post (Steel Beam) ......................................................................................................................................... 800-38 Sign Post (U Steel) ............................................................................................................................................... 800-38 Sign Post Breakaway Base Plate .......................................................................................................................... 800-38 Sign Post Footing (Concrete) ................................................................................................................................ 800-38 Sign Post Footing (Perforated Square Steel Tube) ............................................................................................... 800-38 Sign Post Footing (Sign Post Square Coupler) ..................................................................................................... 800-38 Sign Post Stub and Breakaway Base Plate ........................................................................................................... 800-38 Sign Structure Modification ................................................................................................................................. 700-99 Signing Delineator (Bracket) ................................................................................................................................ 800-38 Signing Delineator (Flexible) (Anchor) ................................................................................................................ 800-38 Signing Delineator (Rigid, "U" Post) ................................................................................................................... 800-38 Signing Object Marker ......................................................................................................................................... 800-38 Silt Fence ................................................................................................................................................................ 900-7 Single-Layer Polymer Concrete Overlay ............................................................................................................ 700-143 Slope Drain ........................................................................................................................................................... 800-61 Slope Drain (Special) ............................................................................................................................................ 800-61 Slope Protection .................................................................................................................................................... 800-82 Slope Protection (Gabion) .................................................................................................................................... 800-82 Slope Protection (Special) .................................................................................................................................... 800-82 Slotted Drain ......................................................................................................................................................... 800-66 Slurry Grout ....................................................................................................................................................... 800-108 Slurry Polymer Concrete Overlay ............................................................................................... ....................... 700-138 Sod ........................................................................................................................................................................ 900-18 Soil Erosion Mix ..................................................................................................................................................... 900-7 Sonic Test (Drilled Shaft) (Set Price) ..................................................................................................................... 700-6 Special Fill ............................................................................................................................................................ 200-24 Stone Masonry for Tree Wells .............................................................................................................................. 900-25 Storm Sewer ......................................................................................................................................................... 800-51 Stormwater Compliance Disincentive Assessment ................................................................................................ 900-1 Structural Plate Arch ......................................................................................................... ................................. 700-124 Structural Plate Pipe ........................................................................................................................................... 700-124 Structural Plate Pipe Arch .................................................................................................................................. 700-124 Structural Steel ..................................................................................................................................................... 700-54 Structural Steel ..................................................................................................................................................... 800-50 Structural Steel (Merchant Quality) ...................................................................................................................... 700-54 Substructure Waterproofing Membrane ............................................................................................................. 700-102 Surface Recycling ................................................................................................................................................. 600-41 Surfacing Material ................................................................................................................................................ 800-96 SWPPP Design .................................................................................................................. ..................................... 900-1 SWPPP Inspection .................................................................................................................................................. 900-1 Synthetic Sediment Barrier ..................................................................................................................................... 900-7 T Table ..................................................................................................................................................................... 900-27 Table Shade .......................................................................................................................................................... 900-27 Tack (Paving Fabric) .......................................................................................................................................... 800-118 Temporary Berm ................................................................................................................ .................................... 900-7 Temporary Ditch Check (Rock) ............................................................................................................................. 900-7 Temporary Fertilizer .............................................................................................................................................. 900-7 Temporary Inlet Sediment Barrier .......................................................................................................................... 900-7 Temporary Sediment Basin .................................................................................................................................... 900-7 Temporary Seed ..................................................................................................................................................... 900-7 Temporary Seeding ................................................................................................................................................. 900-7 INDEX OF PAY ITEMS I-10 Temporary Shoring ................................................................................................................................................. 700-1 Temporary Slope Drain .......................................................................................................................................... 900-7 Temporary Stream Crossing ................................................................................................................................... 900-7 Temporary Surfacing Material (Aggregate) (Set Price) ..................................................................................... 800-103 Temporary Surfacing Material (HMA) (Set Price) ............................................................................................. 800-103 Test Piles .................................................................................................................... .......................................... 700-15 Test Piles (Special) ............................................................................................................................................... 700-15 Topsoil .................................................................................................................................................................. 900-17 Traffic Control (Initial Setup) ............................................................................................................................... 800-13 Traffic Control-Lump Sum ................................................................................................................................... 800-13 Traffic Signal ........................................................................................................................................................ 800-44 Traffic Signal Installation (Temporary) ................................................................................................................ 800-13 Traffic Signal Interconnect ................................................................................................................................... 800-44 Transplanting Existing Plants ............................................................................................................................... 900-19 Transporting Salvageable Material ..................................................................................................................... 800-112 U Unclassified Excavation ....................................................................................................... ................................ 200-12 W Waste Receptacle .................................................................................................................................................. 900-27 Water (Aggregate Base) (Set Price) ...................................................................................................................... 300-13 Water (Aggregate Shoulders) (Set Price) ............................................................................................................. 300-13 Water (Crushed Stone Subgrade) (Set Price) ........................................................................................................ 300-12 Water (Erosion Control) (Set Price) ....................................................................................................................... 900-7 Water (Flexible Pavement) (Set Price) ................................................................................................................. 600-49 Water (Grading) (Set Price) .................................................................................................................................... 200-7 Water (Granular Base) (Set Price) ........................................................................................................................ 300-22 Water (Lime Treated Subgrade) (Set Price) ........................................................................................................... 300-4 Water (Subgrade Modification) (Set Price) ............................................................................................................ 300-1 Water (Treated Subgrade) (Set Price) ..................................................................................................................... 300-9 ................... 800-97 Water Pollution Control Manager .......................................................................................................................... 900-1 Water System ........................................................................................................................................................ 900-28 Welded Stud Shear Connectors ............................................................................................................................ 700-54 Work Zone Barricades (Pedestrian) ...................................................................................................................... 800-13 Work Zone Barricades (Type 3, 4 to 12 Lin. Ft.) ................................................................................................ 800-13 Work Zone Sign (Special) .................................................................................................................................... 800-13 Work Zone Signs (0 to 9.25 Sq. Ft.) ..................................................................................................................... 800-13 Work Zone Signs (16.26 Sq. Ft. and over) ........................................................................................................... 800-13 Work Zone Signs (9.26 to 16.25 Sq. Ft.) .............................................................................................................. 800-13 Work Zone Warning Light (Red Type "B" High Intensity) ................................................................................. 800-13 Work Zone Warning Light (Type "A" Low Intensity) ......................................................................................... 800-13 SUBJECT INDEX I-11 A ABBREVIATIONS ................................................................................................................................................ 100-1 ABUTMENT DRAINAGE SYSTEMS ............................................................................................................. 700-104 ABUTMENT STRIP DRAIN ............................................................................................................................. 1700-11 ACCEPTANCE, NOTICE OF ............................................................................................................................. 100-48 ADJUSTMENT OF INLETS, MANHOLES AND OTHER EXISTING STRUCTURES .................................. 800-50 ADMIXTURES FOR CONCRETE, AIR-ENTRAINING ...................................................................................................................................... 1400-1 CHEMICAL ADMIXTURES ....................................................................................................................... 1400-2 ADVERTISEMENT, CONSTRUCTION BULLETIN ........................................................................................ 100-10 AGGREGATE BASE AND AGGREGATE SHOULDERS ............................................................................... 300-13 AGGREGATE FOR MICROSURFACING (Materials) .................................................................................... 1100-27 AGGREGATES FOR AGGREGATE BASE CONSTRUCTION (Materials) .................................................. 1100-16 AGGREGATES FOR BACKFILL (Materials) .................................................................................................. 1100-21 CRUSHED STONE ................................................................................................................. ................... 1100-24 MSE WALLS .............................................................................................................................................. 1100-22 MSE WALLS: MODULAR BLOCK WITH SOIL REINFORCING GEOGRID ...................................... 1100-23 STRUCTURES OR PIPE ............................................................................................................................ 1100-21 UNDERDRAIN, PERMEABLE OR GRANULAR BACKFILL ............................................................... 1100-23 AGGREGATES FOR CEMENT TREATED BASES (Materials) .................................................................... 1100-17 AGGREGATES FOR CONCRETE NOT PLACED ON GRADE (Materials) ................................................... 1100-4 AGGREGATES FOR CONCRETE ON GRADE (Materials) ........................................................................... 1100-41 AGGREGATES FOR COVER MATERIAL (Materials) .................................................................................. 1100-25 AGGREGATES FOR GRANULAR BASE (Materials) .................................................................................... 1100-19 AGGREGATES FOR HOT MIX ASPHALT (HMA) (Materials) ..................................................................... 1100-11 AGGREGATES FOR SHOULDER CONSTRUCTION (Materials) ................................................................ 1100-34 AGGREGATES FOR SUBGRADE MODIFICATION OR RECONSTRUCTION (Materials) ...................... 1100-28 AGGREGATES FOR SURFACING OR RESURFACING (Materials) ............................................................ 1100-30 AGGREGATES FOR SURFACING OR SUBGRADE MODIFICATION FOR COUNTY SECONDARY ROADS (Materials) .............................................................................................................................. 1100-32 AGGREGATES, GENERAL REQUIREMENTS FOR (Materials) .................................................................... 1100-1 AGRICULTURAL LIMESTONE, AND PEAT MOSS FERTILIZER ............................................................... 900-12 AGRICULTURAL LIMESTONE (Materials) ................................................................................................... 2100-12 AIR-ENTRAINING ADMIXTURES FOR CONCRETE .................................................................................... 1400-1 ALTERNATE BIDS, COMBINATION BIDS, TIES, RIDERS AND ................................................................ 100-13 ALUMINUM ALLOYS ..................................................................................................................................... 1600-41 ALUMINUM HANDRAIL FOR BRIDGES AND OTHER USES ..................................................................... 700-98 ALUMINUM SIGNING MATERIALS ............................................................................................................. 1600-43 ANCHOR BOLTS FOR STRUCTURAL USES ............................................................................................... 1600-25 ANTI-GRAFFITI COATING ............................................................................................................................ 800-114 ANTI-GRAFFITI COATING (Materials) .......................................................................................................... 1700-43 APPROVED MATERIAL SIGNS ....................................................................................................................... 100-56 AREA PREPARED FOR PATCHING (EXISTING CONCRETE BRIDGE DECKS) .................................... 700-116 ASBESTOS REMOVAL .............................................................................................................. ......................... 200-4 ASPHALT APPLICATION TEMPERATURES ................................................................................................... 600-1 ASPHALT CONSTRUCTION, COLD RECYCLED (CIR) (See COLD RECYCLED ASPHALT CONSTRUCTION (CIR)) ..................................................................................................................... 600-38 ASPHALT CONSTRUCTION, HOT MIX ASPHALT (HMA) (See HOT MIX ASPHALT (HMA) CONSTRUCTION (QC/QA)) .................................................................................................................. 600-2 ASPHALT CONSTRUCTION, SURFACE RECYCLED (See SURFACE RECYCLED ASPHALT CONSTRUCTION) ................................................................................................................................ 600-41 ASPHALT COATED CORRUGATED METAL PIPE, PIPE ARCHES, COUPLING BANDS AND STRUCTURAL PLATE ...................................................................................................................... 1900-11 ASPHALT MATERIALS, GENERAL REQUIREMENTS FOR DIVISION 1200 ............................................ 1200-1 ASPHALT PAVEMENT SMOOTHNESS .......................................................................................................... 600-33 SUBJECT INDEX I-12 EQUIPMENT ....................................................................................................................................................... 600-34 PROFILOGRAPH EVALUATION AND CORRECTIVE ACTIONS ............................................................. 600-34 PROFILOGRAPH OPERATION ........................................................................................................................ 600-34 PROFILOGRAPH TESTING .............................................................................................................................. 600-33 ASPHALT PRIME COAT ................................................................................................................................... 600-47 ASPHALT REJUVENATING AGENT (Materials) .......................................................................................... 1200-10 ASPHALT SURFACE TREATMENT, DOUBLE .............................................................................................. 600-57 ASPHALT SURFACE TREATMENT, SINGLE ................................................................................................ 600-53 ASSIGNMENT OF CONTRACT ........................................................................................................................ 100-23 AWARD AND EXECUTION OF CONTRACT ................................................................................................. 100-21 AWARD OF CONTRACT.............................................................................................................. ..................... 100-21 B BACKFILL, AGGREGATES FOR (Materials) ................................................................................................. 1100-21 BACKFILL FOR STRUCTURES, EXCAVATION AND .................................................................................... 200-7 BASE AGGREGATE AND AGGREGATE SHOULDERS ................................................................................... 300-13 CEMENT TREATED ................................................................................................................ ................... 300-15 GRANULAR ................................................................................................................................................. 300-22 BASE, AGGREGATES FOR (Materials) AGGREGATE BASE CONSTRUCTION .................................................................................................. 1100-16 CEMENT TREATED ................................................................................................................ ................. 1100-17 GRANULAR .............................................................................................................................................. 1100-19 BASEDRAINS ................................................................................................................................................... 800-136 BEARINGS AND PADS FOR STRUCTURES .................................................................................................. 700-32 BEARINGS AND PADS FOR STRUCTURES (Materials) ................................................................................ 1700-1 BID BONDS ......................................................................................................................................................... 100-16 BIDDING REQUIREMENTS AND CONDITIONS ............................................................................................. 100-9 BLENDED SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE IN CONCRETE .................... 2000-12 BIODEGRADABLE LOGS ............................................................................................................................... 2100-22 BOND-BREAKER FOR PORTLAND CEMENT CONCRETE PAVEMENT DOWEL BARS ..................... 1700-27 BONDS BID BONDS...................................................................................................................... ............................ 100-16 CONTRACT BOND REQUIREMENTS ...................................................................................................... 100-22 BORED, JACKED OR TUNNELED PIPE ......................................................................................................... 800-59 BREACH OF CONTRACT, CONTRACTOR’S ........................................................................................................................................ 100-73 OWNER’S ..................................................................................................................................................... 100-74 BRIDGE APPROACH SLAB FOOTING ......................................................................................................... 800-132 BRIDGE BACKWALL PROTECTION SYSTEM ........................................................................................... 700-103 BRIDGE BACKWALL PROTECTION SYSTEM (Materials) ......................................................................... 1700-14 BRIDGE CURB REPAIR .................................................................................................................................. 700-103 BRIDGE DECK DRAINS .................................................................................................................................. 700-122 BRIDGE DECK, REMOVAL OF EXISTING ...................................................................................................... 200-3 BRIDGE DRAINAGE SYSTEM ....................................................................................................................... 700-122 BRIDGE DRAIN SYSTEMS, STEEL FOR ...................................................................................................... 1600-20 BRIDGE JOINT SYSTEM - PREFORMED PRESSURIZED ELASTOMERIC NEOPRENE (Materials) ..... 1500-18 BRIDGE OVERLAY MULTI-LAYER POLYMER CONCRETE ................................................................................................ 700-109 PORTLAND CEMENT CONCRETE .......................................................................................................... 700-91 SLLURRY POLYMER CONCRETE ......................................................................................................... 700-138 BRIDGES AND OTHER USES, HANDRAIL FOR ........................................................................................... 700-98 BURLAP .............................................................................................................................................................. 1400-6 SUBJECT INDEX I-13 C CALCIUM CHLORIDE (Materials) .................................................................................................................... 1700-4 CALCIUM SULFONATE ALKYD SYSTEM (Materials) ............................................................................... 1800-12 CALENDAR DAY AND CALENDAR COMPLETION DATE CONTRACTS ................................................ 100-69 CANCELLATION OF AWARD ......................................................................................................................... 100-22 CANCELLING A CONTRACT, DEFERRING OR ............................................................................................ 100-74 CASED PILING ................................................................................................................................................. 700-148 CAST BRONZE PRODUCTS ........................................................................................................................... 1600-40 CAST IRON AND DUCTILE IRON PIPE .......................................................................................................... 1900-7 CAST STEEL PRODUCTS ............................................................................................................................... 1600-24 CATCH BASINS, INLETS, OUTLETS, MANHOLES, JUNCTION BOXES AND OTHER EXISTING STRUCTURES ...................................................................................................................................... 800-48 CEMENT, PORTLAND AND BLENDED HYDRAULIC CEMENT (Materials) ............................................. 2000-1 CEMENT OR FLY ASH TREATED SUBGRADE .............................................................................................. 300-9 CEMENT TREATED BASE ............................................................................................................................... 300-15 CEMENTITIOUS GROUT (Materials) ............................................................................................................. 1700-23 CENTER MOUNT REFLECTORS (Materials) .................................................................................................. 2200-6 CERTIFICATIONS, MATERIAL ....................................................................................................................... 2600-1 CERTIFIED CONCRETE ...................................................................................................................................... 400-8 CHARACTER OF WORKERS; METHODS, OPERATIONS, AND EQUIPMENT ......................................... 100-42 CHEMICAL ADMIXTURES FOR CONCRETE ................................................................................................ 1400-2 CHIP SEALS ........................................................................................................................................................ 600-49 CLAIMS COOPERATION AND CLAIMS BETWEEN CONTRACTORS ............................................................... 100-44 LIABILITY FOR BODILY INJURY AND PROPERTY DAMAGE CLAIMS; INSURANCE REQUIREMENTS ................................................................................................................................. 100-60 LIABILITY FOR RAILROAD CLAIMS; RAILROAD INSURANCE REQUIREMENTS ....................... 100-62 PROCEDURE ............................................................................................................................................... 100-45 CLASSIFICATION OF EXCAVATION FOR HIGHWAYS ............................................................................. 200-12 CLASSIFICATION OF EXCAVATION FOR STRUCTURES ............................................................................ 200-7 CLASSIFICATIONS OF WORK (PREQUALIFYING CONTRACTORS) ......................................................... 100-9 CLEANING EXISTING STRUCTURES AND UNDERDRAINS ................................................................... 800-110 CLEANUP, PUNCH LIST AND FINAL ............................................................................................................. 100-35 CLEANUP TIME ................................................................................................................................................. 100-67 CLEARING AND GRUBBING ............................................................................................................................. 200-1 COFFERDAMS .................................................................................................................... ................................. 200-8 COLD APPLIED CHEMICALLY CURED JOINT SEALANT (Materials) ....................................................... 1500-3 COLD PLASTIC PAVEMENT MARKING MATERIAL ................................................................................ 2200-10 COLD RECYCLED ASPHALT CONSTRUCTION (CIR) ................................................................................ 600-38 COMBINATION BIDS, TIES, RIDERS AND ALTERNATE BIDS ................................................................. 100-13 COMFORT STATION (PARK STRUCTURES) ................................................................................................ 900-27 COMMERCIAL GRADE CONCRETE ................................................................................................................ 400-7 COMMON EXCAVATION ................................................................................................................................. 200-12 COMMON EXCAVATION (CONTRACTOR-FURNISHED)........................................................................... 200-13 COMMON EXCAVATION (UNSTABLE) ........................................................................................................ 200-13 COMMON EXCAVATION (UNSUITABLE) .................................................................................................... 200-13 COMPACTION REQUIREMENTS SOIL .............................................................................................................................................................. 200-15 HMA .............................................................................................................................................................. 600-13 COMPLETING WORK EARLY-INCENTIVE AWARD ................................................................................... 100-70 COMPOST, SOIL ................................................................................................................. ............................... 900-24 CONCRETE AIR-ENTRAINED ON GRADE CONCRETE ............................................................................................. 400-19 CERTIFIED CONCRETE ............................................................................................................................... 400-8 COMMERCIAL GRADE CONCRETE ......................................................................................................... 400-7 SUBJECT INDEX I-14 CONCRETE MIX DESIGN ............................................................................................................................ 400-1 GENERAL NON-MANDATORY INFORMATION ................................................................................... 400-11 GENERAL ON GRADE NON-MANDATORY INFORMATION ............................................................. 400-21 GENERAL STRUCTURES NON-MANDATORY INFORMATION ........................................................ 400-16 HIGH EARLY STRENGTH CONCRETE ..................................................................................................... 400-4 INSPECTION AND TESTING ..................................................................................................................... 400-10 MIXING, DELIVERY AND PLACEMENT LIMITATIONS ....................................................................... 400-8 MORTAR AND GROUT ................................................................................................................................ 400-7 ON GRADE ...................................................................................................................... ............................ 400-17 PRESTRESSED MEMBERS ........................................................................................................................ 400-22 REQUIREMENTS FOR COMBINED MATERIALS .................................................................................... 400-5 SILICA FUME MODIFIED CONCRETE .................................................................................................... 400-16 STRATEGIES TO IMPROVE AIR VOID SPACING FACTOR................................................................. 400-21 STRUCTURAL CONCRETE ....................................................................................................................... 400-14 SUGGESTED GUIDELINES FOR MEETING PERMEABILITY ............................................................. 400-12 CONCRETE MASONRY COATING ................................................................................................................. 700-99 CONCRETE MASONRY COATING (Materials) ............................................................................................. 1700-24 CONCRETE MASONRY UNITS (Materials) ..................................................................................................... 1300-2 CONCRETE PAVEMENT (NON-QC/QA), PORTLAND CEMENT ................................................................ 500-23 CONCRETE PAVEMENT (QC/QA), PORTLAND CEMENT ............................................................................ 500-1 CONCRETE PAVEMENT SMOOTHNESS, PORTLAND CEMENT .............................................................. 500-37 CONCRETE SAFETY BARRIER ....................................................................................................................... 800-33 CONCRETE SEAL COURSE ............................................................................................................................... 200-9 CONCRETE SIDEWALK, STEPS AND RAMPS .............................................................................................. 800-67 CONCRETE STRUCTURE CONSTRUCTION ................................................................................................. 700-40 BRIDGE NUMBER MARKING .................................................................................................................. 700-49 CONCRETE LOAD LIMITATIONS ........................................................................................................... 700-46 CONSTRUCTION JOINTS, EXPANSION JOINTS AND END OF WEARING SURFACE (EWS) TREATMENT ........................................................................................................................................ 700-42 CURING AND PROTECTION .................................................................................................................... 700-44 FALSEWORK AND FORMS............................................................................................................ ........... 700-35 FINISHING ................................................................................................................................................... 700-43 HANDLING AND PLACING CONCRETE ................................................................................................ 700-40 REMOVAL OF FORMS AND FALSEWORK ............................................................................................ 700-47 CONCRETESURFACE REPAIR ........................................................................................................................ 800-73 CONFORMING WITH PLANS AND SPECIFICATIONS; UNACCEPTABLE WORK; UNAUTHORIZED WORK .................................................................................................................................................... 100-39 CONSTRUCTION STAKES, LINES AND GRADES ........................................................................................ 100-47 CONTRACT BOND REQUIREMENTS ............................................................................................................. 100-22 CONTRACT ITEM (MAJOR) SIGNIFICANT QUANTITIES CHANGES ....................................................... 100-24 CONTRACT ITEM (MINOR) QUANTITIES CHANGES ................................................................................. 100-24 CONTRACT TIME-GENERAL .......................................................................................................................... 100-67 CONTRACTOR CONSTRUCTION STAKING ................................................................................................... 800-2 CONTRACTORS BREACH OF CONTRACT .......................................................................................................................... 100-73 COOPERATION AND CLAIMS BETWEEN CONTRACTORS ............................................................... 100-44 COOPERATION WITH ENGINEER AND INSPECTORS ........................................................................ 100-41 PREQUALIFYING CONTRACTORS ........................................................................................................... 100-9 PROCESS CONTROL FOR NON-QC/QA PROJECTS .............................................................................. 100-55 QUALITY CONTROL REQUIREMENTS FOR QC/QA PROJECTS ........................................................ 100-53 RESPONSIBILITY FOR UTILITY PROPERTY AND SERVICES AND COOPERATION WITH UTILITIES ............................................................................................................................................. 100-43 CONTROLLED DEMOLITION ............................................................................................................................ 700-2 SUBJECT INDEX I-15 CONTROL OF MATERIALS ............................................................................................................................. 100-50 CONTROL OF WORK ........................................................................................................................................ 100-38 COOPERATION AND CLAIMS BETWEEN CONTRACTORS ...................................................................... 100-44 COORDINATING CONTRACT DOCUMENTS ............................................................................................... 100-40 CORRUGATED METAL PIPE AND END SECTIONS .................................................................................... 1900-8 COST REDUCTION PROPOSAL, VALUE ENGINEERING OR .................................................................... 100-47 CRUSHED STONE SUBGRADE ....................................................................................................................... 300-12 CULVERTS, PIPE, EROSION PIPE, STORM SEWERS, SANITARY SEWERS AND END SECTIONS ..... 800-51 CULVERTS, RESETTING EXISTING ................................................................................................................. 200-3 CURB AND GUTTER ......................................................................................................................................... 800-70 CURING ENVIRONMENT ................................................................................................................................. 400-17 CUTBACK ASPHALT ...................................................................................................................................... 1200-10 D DAMAGE CLAIMS, INSURANCE REQUIREMENTS, LIABILITY FOR BODILY INJURY AND PROPERTY ...................................................................................................................... ..................... 100-60 DAMAGE TO WORK/PROJECT, LIABILITY FOR ......................................................................................... 100-34 DEFERRING OR CANCELLING A CONTRACT ............................................................................................. 100-74 DEFINITIONS ....................................................................................................................................................... 100-1 DETECTABLE WATNING SURFACE PANELS FOR CURBS, RAMPS AND MEDIANS ......................... 1700-37 DETOUR BRIDGE, ROLLED BEAM .............................................................................................................. 700-152 DIFFERING SITE CONDITIONS ....................................................................................................................... 100-25 DISPOSITION OF UNACCEPTABLE MATERIALS ....................................................................................... 100-57 DISQUALIFYING CONTRACTORS BY SUSPENSION OR DEBARMENT ................................................. 100-20 DISTRICT ENGINEER’S AUTHORITY STATE TRANSPORTATION ENGINEER’S AUTHORITY AND ..................................................... 100-38 DITCH LINING ................................................................................................................................................... 800-84 DOUBLE ASPHALT SURFACE TREATMENT ............................................................................................... 600-57 DOWEL BAR RETROFIT – REPAIR NEW PCCP ............................................................................................ 500-41 DRILLED SHAFTS ............................................................................................................................................... 700-6 DRILLING AND GROUTING .......................................................................................................................... 800-105 DURABLE PAVEMENT MARKING ................................................................................................................. 800-24 DUTIES, INSPECTOR’S AUTHORITY AND ................................................................................................... 100-38 DUTIES, FIELD ENGINEER’S AUTHORITY AND ......................................................................................... 100-38 E ELASTOMERIC CONCRETE ............................................................................................................................ 700-94 ELASTOMERIC CONCRETE (Materials) ........................................................................................................ 1500-12 ELECTRIC LIGHTING AND TRAFFIC SIGNAL EQUIPMENT (Materials) .................................................. 1700-5 ELECTRIC LIGHTING SYSTEMS AND TRAFFIC SIGNALS ........................................................................ 800-44 ELIMINATED ITEMS ......................................................................................................................................... 100-25 EMBANKMENT REQUIREMENTS .................................................................................................................. 200-17 EMPLOYEE SAFETY ......................................................................................................................................... 100-59 EMULSIFIED ASPHALT ............................................................................................................ ....................... 1200-7 ENCASEMENT PIPE .......................................................................................................................................... 800-58 END SECTIONS, PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS AND ..... 800-51 ENVIRONMENTAL PROTECTION (Existing Paint Systems - Painting Structural Steel) .................................... 700-69 GENERAL SITE CLEANUP ........................................................................................................................ 700-75 HEALTH AND ENVIRONMENTAL SAMPLING ..................................................................................... 700-70 INSPECTION STAFF ................................................................................................................................... 700-75 LEAD BASE PAINT REMOVAL ................................................................................................................ 700-71 NOTIFICATIONS AND RECORD KEEPING ............................................................................................ 700-71 SUBJECT INDEX I-16 REMOVAL AND CONTAINMENT REQUIREMENTS ............................................................................ 700-71 STRUCTURE CLASSIFICATION ...................................................................................................... ........ 700-70 WASTE MATERIAL CLEANUP, STORAGE AND TREATMENT ......................................................... 700-73 EPOXY COATED STEEL FOR CONCRETE REINFORCEMENT .................................................................. 1600-5 EPOXY PAVEMENT MARKING MATERIAL ............................................................................................... 2200-21 EPOXY RESIN CRACK REPAIR ...................................................................................................... .............. 700-114 EPOXY-RESIN-BASE BONDING SYSTEMS FOR CONCRETE .................................................................... 1700-9 EQUIPMENT (DIVISION 150) ASPHALT DISTRIBUTOR .......................................................................................................................... 150-11 ASPHALT PAVER ....................................................................................................................................... 150-12 ASPHALT SURFACING AND ASPHALT RECYCLING EQUIPMENT ................................................. 150-11 CENTRAL MIXING PLANT ......................................................................................................................... 150-5 COLD RECYCLED ASPHALT PAVEMENT EQUIPMENT (LIME SLURRY/FLY ASH) ..................... 150-16 COMPACTION EQUIPMENT ....................................................................................................................... 150-1 CONCRETE BATCHING AND MIXING EQUIPMENT ............................................................................. 150-6 CONCRETE CURING COMPOUND DISTRIBUTOR ............................................................................... 150-10 CONCRETE PAVEMENT AND CONCRETE STRUCTURE EQUIPMENT .............................................. 150-6 CONCRETE PAVEMENT TEXTURING EQUIPMENT .............................................................................. 150-9 CONCRETE SAWING EQUIPMENT ......................................................................................................... 150-10 EQUIPMENT FOR HEATING ASPHALT MATERIALS .......................................................................... 150-11 FIXED FORM PAVING EQUIPMENT ......................................................................................................... 150-9 HAULING AND WEIGHING EQUIPMENT ................................................................................................ 150-4 HAULING EQUIPMENT ............................................................................................................................... 150-4 HEATING ASPHALT MATERIALS ........................................................................................................... 150-11 HOT MIX ASPHALT PLANTS ................................................................................................................... 150-13 HOT POUR CRACK SEALANT EQUIPMENT ......................................................................................... 150-17 JOINT AND CRACK SEALING PCCP AND HMA EQUIPMENT ........................................................... 150-19 LONGITUDINAL FINISHER ........................................................................................................................ 150-9 MATERIAL TRANSFER DEVICE ...................................................................................................... ....... 150-13 MECHANICAL AND HAND TAMPERS ..................................................................................................... 150-3 MIXING PLANT FOR STABILIZED BASE AND SHOULDERS............................................................... 150-5 MODIFIED SLURRY SEAL EQUIPMENT ................................................................................................ 150-17 MULCHING EQUIPMENT ............................................................................................................ ............. 150-18 OTHER EQUIPMENT .................................................................................................................................. 150-19 OTHER ROADSIDE IMPROVEMENT EQUIPMENT............................................................................... 150-18 PNEUMATIC-TIRED ROLLERS .................................................................................................................. 150-1 REBAR INSERTION EQUIPMENT ............................................................................................................ 150-19 ROADSIDE IMPROVEMENT EQUIPMENT ............................................................................................. 150-18 SEEDING EQUIPMENT .............................................................................................................................. 150-18 SELF-PROPELLED AGGREGATE SPREADER ....................................................................................... 150-16 SELF-PROPELLED VIBRATORY ROLLERS ............................................................................................. 150-2 SLIP FORM PAVING EQUIPMENT ............................................................................................................ 150-9 SMOOTH-FACED STEEL ROLLERS .......................................................................................................... 150-1 STORAGE OR SURGE BINS ...................................................................................................................... 150-12 SUBGRADE TRIMMERS .............................................................................................................................. 150-9 SURFACE RECYCLE EQUIPMENT .......................................................................................................... 150-16 TAMPING (SHEEPSFOOT) ROLLERS ........................................................................................................ 150-1 TRAVELING MIXING PLANT ..................................................................................................................... 150-5 UNDERSEALING EQUIPMENT ................................................................................................................ 150-19 VIBRATORS .................................................................................................................................................. 150-8 WEIGHING EQUIPMENT ............................................................................................................................. 150-4 ERADICATION OF TRAVELED WAY ............................................................................................................ 200-15 EROSION CONTROL MATERIALS ............................................................................................................... 2100-20 EROSION PIPE .................................................................................................................................................... 800-43 ESTIMATED AND UNDETERMINED QUANTITIES ..................................................................................... 100-14 SUBJECT INDEX I-17 EXAMINING BIDDING PROPOSAL FORM AND PROJECT SITE, INCLUDING EXPLORATORY WORK DOCUMENTS ....................................................................................................................................... 100-14 EXCAVATION COMMON EXCAVATION ............................................................................................................. ............ 200-12 COMMON EXCAVATION (CONTRACTOR-FURNISHED) ................................................................... 200-12 COMMON EXCAVATION (UNSTABLE) ................................................................................................. 200-12 COMMON EXCAVATION (UNSUITABLE) ............................................................................................. 200-12 ROCK EXCAVATION. ................................................................................................................................ 200-12 ROCK EXCAVATION (NON-DURABLE SHALE) ................................................................................... 200-12 SHALE EXCAVATION ............................................................................................................................... 200-12 UNCLASSIFIED EXCAVATION ................................................................................................................ 200-12 EXCAVATION AND BACKFILL FOR STRUCTURES ..................................................................................... 200-7 EXCAVATION AND EMBANKMENT FOR HIGHWAYS .............................................................................. 200-12 EXECUTING THE CONTRACT ........................................................................................................................ 100-22 EXPANDED FOAM FOUNDATION MATERIALS FOR SIGN POSTS........................................................ 1700-42 EXPANSION DEVICE, FINGER PLATE, SLIDING PLATE AND MODULAR ............................................ 700-33 EXPANSION JOINTS (STRIP SEAL ASSEMBLY, PREFORMED ELASTOMERIC (NEOPRENE AND COMPRESSION) AND OTHER) ......................................................................................................... 700-95 EXTRA WORK .................................................................................................................................................... 100-26 F FABRICATION, STRUCTURAL STEEL, BRIDGES ....................................................................................... 700-22 FABRICATION, STRUCTURAL STEEL, GENERAL .................................................................................... 700-153 FABRIC TROUGH ............................................................................................................................................ 1700-31 FAILING TO EXECUTE THE CONTRACT ...................................................................................................... 100-23 FAILURE TO COMPLETE WORK TIMELY-LIQUIDATED DAMAGES AND DISINCENTIVE ASSESSMENTS .................................................................................................................................... 100-70 FALSEWORK AND FORM CONSTRUCTION ................................................................................................ 700-35 FALSEWORK CONSTRUCTION ............................................................................................................... 700-36 FALSEWORK DESIGN. .............................................................................................................................. 700-35 FALSEWORK INSPECTION REQUIREMENTS ....................................................................................... 700-36 FORMS ......................................................................................................................... ................................ 700-36 FAMILIARITY WITH LAWS AND ORDINANCES ........................................................................................ 100-15 FEDERAL AID PROVISIONS ............................................................................................................................ 100-59 FENCING ............................................................................................................................................................. 800-77 FENCING, MATERIALS FOR ......................................................................................................................... 1600-32 FERTILIZER, AGRICULTURAL LIMESTONE AND PEAT MOSS ................................................................. 900-7 FERTILIZERS (Materials) ................................................................................................................................. 2100-13 FIBROUS REINFORCEMENT FOR CONCRETE .......................................................................................... 1700-32 FIELD ENGINEER’S AUTHORITY AND DUTIES.......................................................................................... 100-38 FIELD ERECTION ............................................................................................................................................ 700-132 FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS ................................... 2300-9 FIELD OFFICE AND LABORATORY ................................................................................................................ 800-8 FILTER SOCK ................................................................................................................................................... 2100-22 FINAL PAYMENT AND CORRECTIONS AFTER FINAL PAYMENT .......................................................... 100-82 FINGER PLATE, SLIDING PLATE AND MODULAR EXPANSION DEVICE ............................................. 700-33 FLAPGATES ..................................................................................................................... .................................. 800-62 FLEXIBLE DELINEATOR POSTS AND ANCHORING DEVICES ................................................................ 2200-8 FINAL CLEANUP, PUNCH LIST AND ............................................................................................................. 100-35 FLOWABLE FILL ............................................................................................................................................. 800-107 FLUME INLETS AND SLOPE DRAINS ........................................................................................................... 800-61 FLY ASH FOR STABILIZATION, MODIFICATION AND COLD RECYCLE ASPHALT MATERIAL ...... 2000-9 FLY ASH FOR USE IN CONCRETE ................................................................................................................. 2000-7 FORCE ACCOUNT PAYMENT ......................................................................................................................... 100-78 SUBJECT INDEX I-18 FOUNDATION STABILIZATION ....................................................................................................................... 200-7 FOUNDATION TREATMENT ........................................................................................................................... 200-17 G GABIONS ............................................................................................................................................................ 800-85 GABIONS (Materials) ........................................................................................................................................ 1700-20 GENERAL REQUIREMENTS FOR AGGREGATES ........................................................................................ 1100-1 GENERAL REQUIREMENTS FOR DIVISION 1200 – ASPHALT MATERIALS .......................................... 1200-1 GEOFOAM (Materials) ...................................................................................................................................... 1700-50 GEOFOAM FILL ................................................................................................................................................. 200-26 GEOFOAM FOR VOID FILL ............................................................................................................................. 200-27 GEOFOAM LIGHTWEIGHT EMBANKMENT FILL ....................................................................................... 200-26 GEOFOAM LIGHTWEIGHT EMBANKMENT FOR VOID FILL ................................................................... 200-27 GEOMEMBRANE ............................................................................................................................................. 800-115 GEOMEMBRANE (Materials) .......................................................................................................................... 1700-51 GEOSYNTHETIC REINFORCED BASE ........................................................................................................... 300-23 GEOSYNTHETICS ............................................................................................................................................ 1700-17 GRANULAR BASE ............................................................................................................................................. 300-22 GRANULAR DRAINAGE BLANKET ............................................................................................................... 200-31 GRAY-IRON CASTINGS ................................................................................................................................. 1600-22 GRINDING REHAB CONCRETE PAVEMENT ............................................................................................... 800-99 GROUT FOR POST-TENSIONING...................................................................................................... ............ 1700-48 GROUT, MORTAR AND ............................................................................................................. ......................... 400-7 GUARDRAIL AND GUIDEPOSTS .................................................................................................................... 800-75 GUTTER, CURB AND ........................................................................................................................................ 800-70 H HANDLING MATERIALS ................................................................................................................................. 100-57 HANDLING TRAFFIC THROUGH CONSTRUCTION .................................................................................... 100-32 HANDRAIL FOR BRIDGES AND OTHER USES ............................................................................................ 700-98 HEADED REINFORCING ANCHORS ............................................................................................................ 1600-44 HEAT STRAIGHTENING ................................................................................................................................ 700-149 HELICAL REINFORCEMENT ......................................................................................................................... 1600-11 HIGH DURABILITY PAVEMENT MARKING TAPE (Materials) ................................................................. 2200-12 HIGH EARLY STRENGTH CONCRETE ............................................................................................................ 400-4 HIGH MAST LIGHT TOWER .......................................................................................................................... 700-136 HOLLOW LOAD-BEARING CONCRETE MASONRY UNITS (Materials) .................................................... 1300-3 HOT JOINT SEALING COMPOUND (Materials) ............................................................................................. 1500-1 HOT MIX ASPHALT (HMA) CONSTRUCTION (QC/QA) ................................................................................ 600-2 COMPACTION TESTING ........................................................................................................................... 600-19 CONTRACTOR QUALITY CONTROL REQUIREMENTS ........................................................................ 600-2 DETERMINATION OF THICKNESS, THICKNESS PAY ADJUSTMENT AND AREA PAY ADJUSTMENTS FOR "HMA PAVEMENT" ....................................................................................... 600-27 HAULING OPERATIONS ........................................................................................................................... 600-11 MAINTENANCE OF TRAFFIC .................................................................................................................. 600-14 MIXES WITH RECLAIMED ASPHALT PAVEMENT (RAP) .................................................................. 600-16 MIXES WITH RECYCLED ASPHALT SHINGLES (RAS) ....................................................................... 600-17 MIXTURE ACCEPTANCE .......................................................................................................................... 600-21 NUCLEAR DENSITY TESTS ..................................................................................................................... 600-19 PAVING OPERATIONS .............................................................................................................................. 600-11 PLANT OPERATION ..................................................................................................................................... 600-9 PROCESS CONTROL .................................................................................................................................. 600-15 SUBJECT INDEX I-19 ROAD SURFACE PREPARATION. ........................................................................................................... 600-10 TREATMENT OF ADJACENT AREAS. .................................................................................................... 600-15 WEATHER LIMITATIONS ......................................................................................................................... 600-20 WEIGHING OPERATIONS ......................................................................................................................... 600-11 HMA BASE (REFLECTIVE CRACK INTERLAYER (RCI)) ........................................................................... 600-80 HOT MIX ASPHALT (HMA)-COMMERCIAL GRADE .................................................................................. 600-62 HYDRATED LIME ................................................................................................................. ............................ 2000-4 HYDRO-SEEDING .............................................................................................................................................. 900-13 I IMAGE SYSTEMS FOR RETROREFLECTIVE SHEETING ........................................................................... 2200-3 IMPACT ATTENUATOR ................................................................................................................................... 800-36 IMPACT ATTENUATOR (Materials) ............................................................................................................... 1700-40 INDEMNIFICATION .......................................................................................................................................... 100-63 INERTIAL BARRIER SYSTEM ......................................................................................................................... 800-35 INERTIAL BARRIER SYSTEM AND REPLACEMENT MODULES ........................................................... 1700-22 INLETS, OUTLETS, MANHOLES, JUNCTION BOXES AND OTHER EXISTING STRUCTURES, CATCH BASINS, ................................................................................................................................................. 800-48 INORGANIC ZINC PRIMER FOR STRUCTURAL STEEL ............................................................................. 1800-1 INSPECTOR’S AUTHORITY AND DUTIES .................................................................................................... 100-38 INSTRUCTIONS TO THE CONTRACTOR ...................................................................................................... 100-39 INSURANCE REQUIREMENTS, LIABILITY FOR BODILY INJURY AND PROPERTY DAMAGE CLAIMS ................................................................................................................................................. 100-60 INSURANCE REQUIREMENTS, RAILROAD LIABILITY FOR RAILROAD CLAIMS .............................. 100-62 INTELLIGENT TRANSPORTATION SYSTEM (ITS) ................................................................................... 800-133 INTENT OF CONTRACT AND SCOPE OF CONTRACT ................................................................................ 100-24 ISSUING BIDDING PROPOSAL FORM ........................................................................................................... 100-11 J JACKING OF EXISTING STRUCTURE ................................................................................................................ 700-107 JUNCTION BOXES AND OTHER EXISTING STRUCTURES, CATCH BASINS, INLETS, OUTLETS, MANHOLES, ......................................................................................................................................... 800-48 L LABORATORY, FIELD OFFICE AND ............................................................................................................... 800-8 LANDSCAPE RETAINING WALL .................................................................................................................. 800-125 LAWS TO BE OBSERVED ................................................................................................................................ 100-58 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ................................................................. 100-58 LIABILITY FOR DAMAGE TO WORK/PROJECT .......................................................................................... 100-34 LIABILITY FOR RAILROAD CLAIMS; RAILROAD INSURANCE REQUIREMENTS .............................. 100-62 LIABILITY OF PUBLIC OFFICIALS ................................................................................................................ 100-64 LIABILITY FOR BODILY INJURY AND PROPERTY DAMAGE CLAIMS; INSURANCE REQUIREMENTS ................................................................................................................................. 100-60 LIGHT TYPE SURFACING .............................................................................................................................. 800-104 LIME TREATED SUBGRADE ............................................................................................................................. 300-4 LINEAR GRADING ............................................................................................................................................ 200-23 LIQUIDATED DAMAGES, FAILURE TO COMPLETE WORK TIMELY- AND DISINCENTIVE ASSESSMENTS .................................................................................................................................... 100-70 LIQUIDATED DAMAGES, TABLE OF ............................................................................................................ 100-72 LIQUID MEMBRANE FORMING COMPOUNDS (Materials) ......................................................................... 1400-5 SUBJECT INDEX I-20 LOAD RESTRICTIONS ...................................................................................................................................... 100-31 LPA’S AND OTHER THIRD PARTY OWNERS .............................................................................................. 100-64 M MACHINE PREPARATION (EXISTING CONCRETE BRIDGE DECKS) ................................................... 700-121 MAILBOX ADJUSTMENTS ............................................................................................................................ 800-113 MAINTAINING AND PROTECTING THE WORK AND INFRASTRUCTURE ............................................ 100-30 MAINTENANCE AND RESTORATION OF HAUL ROADS .......................................................................... 800-11 MALLEABLE CAST IRON PRODUCTS ........................................................................................................ 1600-23 MANHOLE STEPS ............................................................................................................................................ 1700-13 MANHOLES, JUNCTION BOXES AND OTHER EXISTING STRUCTURES, CATCH BASINS, INLETS, OUTLETS, ............................................................................................................................................. 800-48 MASONRY BRICK ............................................................................................................................................. 1300-1 MATERIAL PROVIDED BY KDOT .................................................................................................................. 100-57 MATERIAL SOURCES ....................................................................................................................................... 100-52 MATERIALS CERTIFICATIONS ...................................................................................................................... 2600-1 MATERIALS FOR FENCING .......................................................................................................................... 1600-32 MATERIALS FOR FILLING AND SEALING JOINTS IN PIPE ...................................................................... 1500-7 MEASUREMENT AND PAYMENT .................................................................................................................. 100-75 MEASUREMENT OF QUANTITIES ................................................................................................................. 100-76 MECHANICALLY STABILIZED EARTH MSE FILL ...................................................................................... 200-29 MEMBRANE SEALANT .................................................................................................................................. 1500-15 MICROSURFACING ................................................................................................................ .......................... 600-37 MILLING ............................................................................................................................................................. 600-60 MIXING, DELIVERY AND PLACEMENT LIMITATIONS CONCRETE ........................................................ 400-8 MOBILIZATION ................................................................................................................................................... 800-1 MOBILIZATION (DBE) ............................................................................................................ ........................... 800-1 MODULAR EXPANSION DEVICES (Materials) ............................................................................................ 1700-30 MOISTURE-CURE URETHANE SYSTEM ..................................................................................................... 1800-10 MORTAR AND GROUT ....................................................................................................................................... 400-7 MOWING ............................................................................................................................................................. 900-23 MULCH (Materials) ........................................................................................................................................... 2100-16 MULCH TACKING SLURRY (Materials)........................................................................................................ 2100-18 MULCHING ......................................................................................................................................................... 900-15 MULTI-COMPONENT LIQUID PAVEMENT MARKING MATERIAL ....................................................... 2200-24 MULTI-LAYER POLYMER CONCRETE OVERLAY ................................................................................... 700-109 NITROGEN FIXING BACTERIA .................................................................................................................... 2100-11 N NON-METALLIC OFFSET BLOCKS FOR GUARDRAIL ............................................................................. 1700-34 NOTICE OF ACCEPTANCE .............................................................................................................................. 100-48 NOTICE OF CONTRACT CHANGE AND REQUEST FOR CONTRACT ADJUSTMENT ........................... 100-27 NOTICE TO CONTRACTORS (ADVERTISEMENT) ........................................................................................ 100-9 NOTICE TO PROCEED ...................................................................................................................................... 100-65 O OPENING SECTIONS TO TRAFFIC AND MAINTAINING ROADWAYS AFTER OPENING SECTIONS TO TRAFFIC ....................................................................................................................... ........................ 100-33 OPENINGS IN HIGHWAY OR RIGHT-OF-WAY FOR THIRD PARTIES ..................................................... 100-31 ORGANIC ZINC PRIMER FOR STRUCTURAL STEEL ................................................................................. 1800-3 SUBJECT INDEX I-21 ORGANIC ZINC RICH PAINT FOR REPAIRING DAMAGED SPELTER COATING .................................. 1800-5 OUTLETS, MANHOLES, JUNCTION BOXES AND OTHER EXISTING STRUCTURES, CATCH BASINS, INLETS, ................................................................................................................................................. 800-48 OVERHAUL ........................................................................................................................................................ 200-22 OWNER’S BREACH OF CONTRACT .............................................................................................................. 100-74 P PAINTED PAVEMENT MARKING .................................................................................................................. 800-30 PAINTING STRUCTURAL STEEL ................................................................................................................... 700-65 ENVIRONMENTAL PROTECTION ........................................................................................................... 700-69 FIELD PAINTING NEW STRUCTURAL STEEL (NON-WEATHERING) .............................................. 700-67 FIELD PAINTING NEW WEATHERING STEEL ..................................................................................... 700-68 GENERAL REQUIREMENTS FOR PAINTING STRUCTURAL STEEL ................................................ 700-65 PAINTING GALVANIZED STEEL ............................................................................................................ 700-68 REPAINTING STEEL BRIDGES - CHANGE PAINT SYSTEM ............................................................... 700-69 REPAINTING STEEL BRIDGES - PAINTING IN KIND .......................................................................... 700-69 SHOP PAINTING NEW WEATHERING STEEL ....................................................................................... 700-67 SHOP PAINTING STRUCTURAL STEEL (NON-WEATHERING) ......................................................... 700-67 PARK STRUCTURES ......................................................................................................................................... 900-27 PART V ................................................................................................................................................................ 2500-1 PATENTED DEVICES, MATERIALS, AND PROCESSES .............................................................................. 100-59 PATTERNED COLD PLASTIC PAVEMENT MARKING MATERIAL ........................................................ 2200-11 PAVEMENT EDGE WEDGE FOR HMA OVERLAY PROJECTS, PAVEMENT WIDENING, SHOULDERING AND ....................................................................................................................................................... 800-97 PAVEMENT MARKING DURABLE .................................................................................................................................................... 800-24 PAINTED ...................................................................................................................................................... 800-30 REMOVAL OF EXISTING .......................................................................................................................... 800-32 PAVEMENT MARKING PAINT ...................................................................................................................... 2200-23 PAVEMENT PATCHING ................................................................................................................................... 800-86 PAVEMENT WATERPROOFING MEMBRANE ........................................................................................... 800-117 PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE FOR HMA OVERLAY PROJECTS ............................................................................................................................................. 800-97 PAVING BRICKS .............................................................................................................................................. 800-129 PAVING FABRIC .............................................................................................................................................. 800-118 PAYMENT FINAL PAYMENT AND CORRECTIONS AFTER FINAL PAYMENT .................................................. 100-82 FORCE ACCOUNT PAYMENT .................................................................................................................. 100-78 RESPONSIBILITY FOR PAYMENT .......................................................................................................... 100-83 SCOPE OF PAYMENT ................................................................................................................................ 100-78 PAYMENTS PROGRESS PAYMENTS ............................................................................................................................ 100-80 TO SUBCONTRACTORS AND SUPPLIERS. ............................................................................................ 100-81 STORED MATERIALS PAYMENTS ......................................................................................................... 100-80 PEAT MOSS, AGRICULTURAL LIMESTONE, FERTILIZER AND .............................................................. 900-12 PEAT MOSS (Materials) .................................................................................................................................... 2100-15 PEBBLE QUICKLIME ........................................................................................................................................ 2000-6 PERFORMANCE GRADED ASPHALT BINDER ............................................................................................ 1200-6 PERMANENT SIGNING .................................................................................................................................... 800-38 PERMITS, LICENSES AND TAXES ................................................................................................................. 100-58 PILING ................................................................................................................................................................. 700-15 BEARING VALUES AND REQUIRED PENETRATION .......................................................................... 700-18 CASED ........................................................................................................................................................ 700-148 CAST-IN-PLACE CONCRETE PILES ........................................................................................................ 700-20 SUBJECT INDEX I-22 DRIVING PILES ................................................................................................................. ......................... 700-17 ORDER LISTS AND TEST PILES .............................................................................................................. 700-17 PILE CUT-OFF AND PILE PAINTING ...................................................................................................... 700-20 PILING RESTRIKE PROCEDURE ............................................................................................................. 700-19 TEST PILE (SPECIAL) ................................................................................................................................ 700-17 PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS AND END SECTIONS ...... 800-51 PIPE FOR SONIC TESTING ............................................................................................................................. 1600-21 PIPE, USES OF .................................................................................................................................................... 1900-1 PLANS AND WORKING DRAWINGS ............................................................................................................. 100-43 PLANT INSPECTION ......................................................................................................................................... 100-56 PLANTS ............................................................................................................................................................... 2100-2 PLASTIC PIPE FOR UNDERDRAINS, EDGE DRAINS, OUTLETS AND DRAIN TILE ............................ 1900-12 PLUGGING WELLS ................................................................................................................ ......................... 800-131 POLYETHYLENE (PE) PIPE ........................................................................................................................... 1900-13 POLYMER CONCRETE OVERLAY REPAIR ................................................................................................ 700-143 POLYMER MODIFIED ASPHALT CEMENT FOR CHIP SEALS (Materials) .............................................. 700-143 POLYMER RESINS FOR POLYMER CONCRETE OVERLY SYSTEMS (Materials) ................................. 1700-45 POLYVINYL CHLORIDE (PVC) PIPE ............................................................................................................ 1900-15 POLYVINYL CHLORIDE (PVC) PLASTIC WATERSTOP ............................................................................. 1500-9 PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENT ................................................................... 400-5 PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENT (Materials) .............................................. 2000-1 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) ................................................................. 500-23 CONSOLIDATION AND FINISHING ........................................................................................................ 500-25 FIXED FORM PAVING ............................................................................................................................... 500-26 HAND FINISHING ................................................................................................................ ...................... 500-30 JOINTS .......................................................................................................................................................... 500-26 PAVEMENT THICKNESS AND TOLERANCE ........................................................................................ 500-35 PLACING REINFORCEMENT ................................................................................................................... 500-24 PREPARATION OF THE SUBGRADE ...................................................................................................... 500-23 PROTECTION AND CURING OF CONCRETE ........................................................................................ 500-31 PROTECTION OF PAVEMENT FROM RAIN........................................................................................... 500-34 REPAIR OF DEFECTIVE PAVEMENT SLABS ........................................................................................ 500-32 SLIP FORM PAVING .................................................................................................................................. 500-24 TEXTURING ................................................................................................................................................ 500-26 PORTLAND CEMENT CONCRETE PAVEMENT (QC/QA) ............................................................................. 500-1 CONSOLIDATION AND FINISHING .......................................................................................................... 500-6 CONTRACTOR QUALITY CONTROL PLAN (QC PLAN) ........................................................................ 500-1 FIXED FORM PAVING ................................................................................................................................. 500-7 HAND FINISHING ................................................................................................................ ...................... 500-12 JOINTS ............................................................................................................................................................ 500-8 PLACING REINFORCEMENT ..................................................................................................................... 500-6 PREPARATION OF THE SUBGRADE ........................................................................................................ 500-4 PROTECTION AND CURING OF CONCRETE ........................................................................................ 500-12 PROTECTION OF PAVEMENT FROM RAIN........................................................................................... 500-16 REPAIR OF DEFECTIVE PAVEMENT SLABS ........................................................................................ 500-13 SLIP FORM PAVING .................................................................................................................................... 500-5 TEXTURING .................................................................................................................................................. 500-8 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS ............................................................... 500-37 POSTS, SEDIMENT BARRIER ........................................................................................................................ 2100-22 POST-TENSIONING (HAUNCHED SLAB BRIDGES) .................................................................................... 700-76 PRECAST CULVERTS ..................................................................................................................................... 700-129 PRECAST PANEL BEDDING MATERIALS .................................................................................................. 1700-26 PRECAST PARKING BLOCK ......................................................................................................................... 800-130 PRECAST REINFORCED CONCRETE BOX ................................................................................................. 700-125 PRE-CONSTRUCTION CONFERENCE AND PROJECT PROGRESS MEETINGS ...................................... 100-65 PRECURE/FINISHING AID ............................................................................................................................... 1400-4 SUBJECT INDEX I-23 PREFABRICATED INTERCEPTION DEVICES AND SLOTTED DRAINS ................................................... 800-66 PREFABRICATED VERTICAL DRAIN ............................................................................................................ 200-28 PREFABRICATED VERTICAL DRAIN (Materials) ....................................................................................... 1700-21 PREFORMED ELASTOMERIC COMPRESSION JOINT SEALS FOR CONCRETE ..................................... 1500-5 PREFORMED EXPANSION JOINT FILLER FOR CONCRETE ...................................................................... 1500-4 PREFORMED THERMOPLASTIC PAVEMENT MARKING MATERIAL .................................................. 2200-17 PREPARING PROPOSALS ................................................................................................................................ 100-16 PREQUALIFYING CONTRACTORS .................................................................................................................. 100-9 PRESSURE RELIEF JOINT FILLER ............................................................................................................... 1500-10 PRESTRESSED CONCRETE MEMBERS ......................................................................................................... 700-76 PRICING THE CONTRACT ADJUSTMENT REQUEST ................................................................................. 100-29 PROGRESS PAYMENTS ............................................................................................................. ...................... 100-80 PROGRESS SCHEDULE OR NETWORK SCHEDULE ................................................................................... 100-65 PROJECT OPEN TIME .............................................................................................................................................. 100-67 PROJECT STORM WATER POLLUTION PREVENTION PLAN (SWPPP) ......................................................... 900-3 PROPOSAL FORM, PROPOSAL, AND CONTRACT ...................................................................................... 100-11 PROSECUTION AND PROGRESS .................................................................................................................... 100-65 PROTECTING PROPERTY, LANDSCAPE, AND THE ENVIRONMENT ..................................................... 100-60 PROVIDING RIGHT-OF-WAY .......................................................................................................................... 100-59 PROVISION FOR LOWER-TIER SUBCONTRACTORS ................................................................................. 100-82 PUBLIC OPENING OF PROPOSALS ................................................................................................................ 100-17 PUBLIC SAFETY ................................................................................................................................................ 100-59 PUNCH LIST AND FINAL CLEANUP .............................................................................................................. 100-35 Q QUALIFICATION OF FIELD WELDERS ......................................................................................................... 700-62 QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS ............................................. 1900-2 R RAILROAD INSURANCE REQUIREMENTS, LIABILITY FOR RAILROAD CLAIMS .............................. 100-62 RAILROAD PROVISIONS ................................................................................................................................. 100-33 RAISED PAVEMENT MARKERS ..................................................................................................................... 2200-9 RAPID-SET CONCRETE PATCHING MATERIAL ....................................................................................... 1700-25 REINFORCING STEEL ...................................................................................................................................... 700-50 EPOXY-COATED REINFORCEMENT ...................................................................................................... 700-51 MECHANICAL OR THERMOMECHANICAL SPLICES ......................................................................... 700-52 SPLICING ..................................................................................................................................................... 700-51 RAISE EXPANSION DEVICE ................................................................................................................................ 700-107 REFLECTIVE CRACK INTERLAYER (RCI) ................................................................................................... 600-80 REINFORCING STEEL SPLICES .................................................................................................................... 1600-12 REJECTION OF PROPOSALS; NON-RESPONSIBLE CONTRACTOR ......................................................... 100-19 REJECTION OF PROPOSALS; NON-RESPONSIVENESS ............................................................................. 100-18 RELEASE COMPOUND FOR ASPHALT MIXES .......................................................................................... 1700-29 REMOVE AND RESET EXISTING EXPANSION DEVICES ............................................................................. 700-107 REMOVAL OF EXISTING PAVEMENT MARKINGS .................................................................................... 800-32 REMOVAL OF EXISTING STRUCTURES ......................................................................................................... 200-3 ASBESTOS REMOVAL ................................................................................................................................ 200-4 EXISTING BRIDGE DECK ........................................................................................................................... 200-3 SALVAGED MATERIAL .............................................................................................................................. 200-4 REMOVING AND DISPOSING OF STRUCTURES AND OBSTRUCTIONS ................................................ 100-31 REPAIR (STRUCTURES) ................................................................................................................................. 700-107 JACKING OF EXISTING STRUCTURE ........................................................................................................ 700-107 SUBJECT INDEX I-24 RAISE EXPANSION DEVICE ......................................................................................................................... 700-107 REMOVE AND RESET EXISTING EXPANSION DEVICES ...................................................................... 700-107 RESETTING EXISTING BEARING ................................................................................................................ 700-107 REPLACEMENT MODULES, IMPACT ATTENUATOR .............................................................................. 1700-40 RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP AND HMA PAVEMENTS ............. 800-92 RESETTING EXISTING BEARING ....................................................................................................................... 700-107 RESETTING EXISTING CULVERTS .................................................................................................................. 200-6 RESPONSIBILITY FOR PAYMENT ................................................................................................................. 100-83 RESTORATION, MAINTENANCE AND, OF HAUL ROADS ........................................................................ 800-11 RETAINING WALL SYSTEM ......................................................................................................................... 800-119 RETROREFLECTIVE SHEETING ..................................................................................................................... 2200-1 REVISING PROPOSALS .................................................................................................................................... 100-17 RIDERS AND ALTERNATE BIDS, COMBINATION BIDS, TIES, ................................................................ 100-13 RIPRAP ................................................................................................................................................................ 800-81 ROCK EXCAVATION ........................................................................................................................................ 200-12 ROCK EXCAVATION (NON-DURABLE SHALE) .......................................................................................... 200-12 ROLLED BEAM DETOUR BRIDGE ............................................................................................................... 700-152 ROLL-UP SIGNS ................................................................................................................................................. 2200-5 RUBBLIZING PORTLAND CEMENT CONCRETE PAVEMENT ................................................................ 800-101 RULES OF INTERPRETATION ........................................................................................................................... 100-1 RUMBLE STRIPS (MILLED) AND RUMBLE STRIPS (MILLED) (CENTERLINE) ..................................... 800-43 S SAFETY, WORK ZONE TRAFFIC CONTROL AND ....................................................................................... 800-13 SALVAGEABLE MATERIAL, TRANSPORTING ......................................................................................... 800-112 SALVAGED MATERIAL ..................................................................................................................................... 200-4 SALVAGED TOPSOIL ....................................................................................................................................... 200-25 SAMPLING, TESTING, AND CITED SPECIFICATIONS ............................................................................... 100-53 SANCTIONS FOR FAILURE TO PAY PROMPTLY ........................................................................................ 100-81 SANITARY SEWERS AND END SECTIONS, PIPE CULVERTS, EROSION PIPE, STORM SEWERS, ..... 800-51 SAW AND SEAL JOINTS .................................................................................................................................. 600-92 SCOPE OF PAYMENT ....................................................................................................................................... 100-78 SCOPE OF WORK ................................................................................................................. ............................. 100-24 SEALING CRACKS, RESEALING JOINTS AND, IN EXISTING PCCP AND HMA PAVEMENTS ........... 800-92 SEDIMENT BARRIER POSTS ......................................................................................................................... 2100-22 SEEDING ............................................................................................................................................................. 900-13 SEEDING, HYDRO ............................................................................................................................................. 900-13 SEEDS (Materials) ............................................................................................................................................... 2100-4 SELECT SOIL ...................................................................................................................................................... 200-21 SEPARATION GEOTEXTILE .......................................................................................................................... 800-116 SHALE EXCAVATION ...................................................................................................................................... 200-12 SHEET MATERIALS FOR CURING CONCRETE ........................................................................................... 1400-7 SHOTCRETE CONCRETE ............................................................................................................................... 1700-41 SHOULDERS, AGGREGATE AND AGGREGATE BASE .............................................................................. 300-13 SHOULDERING AND PAVEMENT EDGE WEDGE FOR HMA OVERLAY PROJECTS, PAVEMENT WIDENING, ..................................................................................................................... ..................... 800-92 SIDEWALK, STEPS AND RAMPS, CONCRETE ............................................................................................. 800-67 SIGN STRUCTURES AND BRIDGE MOUNTED SIGN ATTACHMENTS ................................................... 700-99 SIGNING, PERMANENT ................................................................................................................................... 800-38 SIGNIFICANT CHANGE IN MAJOR CONTRACT ITEM QUANTITIES ...................................................... 100-24 SILICA FUME (Materials)........................................................................................................ ......................... 2000-10 SILICA FUME MODIFIED CONCRETE ........................................................................................................... 400-16 SILICONE RUBBER SURFACE CRACK SEALANT .................................................................................... 1700-36 SILT FENCE (Materials) ........................................................................................................ ........................... 2100-22 SUBJECT INDEX I-25 SINGLE ASPHALT SURFACE TREATMENT ................................................................................................. 600-53 SLAG CEMENT FOR USE IN CONCRETE AND MORTARS ...................................................................... 2000-11 SLIPFORMING CONCRETE BARRIER FOR BRIDGES ................................................................................. 700-97 SLOPE DRAINS, FLUME INLETS AND .......................................................................................................... 800-61 SLOPE PROTECTION ........................................................................................................................................ 800-82 SLOTTED DRAINS, PREFABRICATED INTERCEPTION DEVICES AND .................................................. 800-66 SLURRY GROUT .............................................................................................................................................. 800-108 SLURRY POLYMER CONCRETE OVERLAY .............................................................................................. 700-138 SODDING ............................................................................................................................................................ 900-18 SODS (Materials) ................................................................................................................................................. 2100-9 SOIL COMPOST .................................................................................................................. ............................... 900-24 SOIL COMPOST (Materials) ............................................................................................................................. 2100-10 SOLID INTERLOCKING PAVING UNITS ..................................................................................................... 800-129 SOLID INTERLOCKING PAVING UNITS (Materials) .................................................................................... 1300-4 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS ............................................................................. 100-50 SPECIAL FILL .................................................................................................................. .................................. 200-24 SPRAYED THERMOPLASTIC PAVEMENT MARKING MATERIAL ........................................................ 2200-19 START DATE ...................................................................................................................................................... 100-14 STATE TRANSPORTATION ENGINEER’S AUTHORITY AND DISTRICT ENGINEER’S AUTHORITY..................................................................................................................... .................... 100-38 STEEL BARS FOR CONCRETE REINFORCEMENT (Materials) ................................................................... 1600-1 STEEL FASTENERS (Materials) ...................................................................................................................... 1600-26 STEEL FOR BRIDGE DRAIN SYSTEMS (Materials) ..................................................................................... 1600-20 STEEL PERMANENT DECK FORMS ............................................................................................................... 700-39 STEEL PERMANENT DECK FORMS (Materials) .......................................................................................... 1600-38 STEEL PILING AND PILE POINTS (Materials) .............................................................................................. 1600-18 STEEL PIPE (Materials) .................................................................................................................................... 1600-31 STEEL PLATE GUARDRAIL (Materials) ........................................................................................................ 1600-29 STEEL POSTS FOR DELINEATOR MARKERS (Materials).......................................................................... 1600-37 STEEL SIGN POSTS ......................................................................................................................................... 1600-35 STEPS AND RAMPS, CONCRETE SIDEWALK, ............................................................................................. 800-67 STONE FOR RIPRAP, DITCH LINING AND OTHER MISCELLANEOUS USES (Materials) .................... 1100-35 STONE MASONRY TREE WELLS ................................................................................................................... 900-25 STORAGE OF MATERIALS .............................................................................................................................. 100-56 STORED MATERIALS PAYMENTS ................................................................................................................ 100-80 STORING AND USING EXPLOSIVES ............................................................................................................. 100-59 STORM SEWERS, SANITARY SEWERS AND END SECTIONS, PIPE CULVERTS, EROSION PIPE, ..... 800-51 STORM WATER POLLUTION PREVENTION PLAN (SWPPP) ............................................................................ 900-3 STORMWATER COMPLIANCE DISINCENTIVE ASSESSMENT ....................................................................... 900-1 STRAND FOR PRESTRESSED CONCRETE .................................................................................................. 1600-14 STRIP SEAL ASSEMBLY ................................................................................................................................ 1500-16 STRUCTURAL PLATE FOR PIPE, PIPE ARCHES, AND ARCHES ............................................................. 1900-10 STRUCTURAL PLATE STRUCTURES .......................................................................................................... 700-114 STRUCTURAL STEEL (Materials) .................................................................................................................. 1600-15 STRUCTURAL STEEL CONSTRUCTION ....................................................................................................... 700-54 BOLTED FIELD CONNECTIONS .............................................................................................................. 700-55 ERECTING STRUCTURAL STEEL ........................................................................................................... 700-54 FIELD PAINTING ........................................................................................................................................ 700-61 WELDED FIELD CONNECTIONS ............................................................................................................. 700-60 WELDED STUD SHEAR CONNECTORS ................................................................................................. 700-61 STRUCTURAL STEEL FABRICATION-BRIDGES ......................................................................................... 700-22 HANDLING .................................................................................................................................................. 700-23 PRELIMINARY SHOP REQUIREMENTS ................................................................................................. 700-22 SHOP FABRICATION ................................................................................................................................. 700-24 SUPPLEMENTAL REQUIREMENTS TO THE WELDING CODE .......................................................... 700-27 STRUCTURAL STEEL FABRICATION-GENERAL ...................................................................................... 700-153 SUBJECT INDEX I-26 STRUCTURAL STEEL TUBING (Materials) .................................................................................................. 1600-17 STRUCTURE CONSTRUCTION, CONCRETE ................................................................................................ 700-40 STRUCTURES, EXCAVATION AND BACKFILL FOR .................................................................................... 200-7 STRUCTURES AND UNDERDRAINS, CLEANING EXISTING .................................................................. 800-110 STRUCTURES, REPAIR ............................................................................................................ ...................... 700-107 JACKING OF EXISTING STRUCTURE ........................................................................................................ 700-107 RAISE EXPANSION DEVICE ......................................................................................................................... 700-107 REMOVE AND RESET EXISTING EXPANSION DEVICES ...................................................................... 700-107 RESETTING EXISTING BEARING ................................................................................................................ 700-107 SUBGRADE MODIFICATION ............................................................................................................................ 300-1 SUBGRADE CEMENT OR FLY ASH TREATED ..................................................................................................... ........ 300-8 CRUSHED STONE ................................................................................................................. ..................... 300-10 LIME TREATED ............................................................................................................................................ 300-4 SUBLETTING CONTRACT ............................................................................................................................... 100-42 SUBMITTING PROPOSALS .............................................................................................................................. 100-16 SUBSTRUCTURE WATERPROOFING .......................................................................................................... 1700-15 SUBSTRUCTURE WATERPROOFING MEMBRANE .................................................................................. 700-102 SURFACE RECYCLED ASPHALT CONSTRUCTION .................................................................................... 600-41 SURFACING FOR SIDE ROADS AND ENTRANCES ..................................................................................... 800-96 SYNTHETIC SEDIMENT BARRIERS ............................................................................................................ 2100-22 T TEMPORARY EROSION AND SEDIMENT CONTROL ................................................................................... 900-7 TEMPORARY PAVEMENT MARKING TAPE .............................................................................................. 2200-14 TEMPORARY SEDIMENT BARRIERS .......................................................................................................... 2100-22 TEMPORARY SHORING ..................................................................................................................................... 700-1 TEMPORARY SURFACING ............................................................................................................................ 800-103 TEMPORARY SUSPENSION OF WORK ......................................................................................................... 100-26 TERMINATION OF CONTRACTOR’S LIABILITY AFTER NOTICE OF ACCEPTANCE AND EXCEPTIONS .................................................................................................................... ................... 100-75 TEST METHODS FOR DIVISION 1100, AGGREGATES .............................................................................. 1100-39 AASHTO TEST METHODS .......................................................................................................... ............ 1100-40 GENERAL TEST METHODS (KT) .................................................................................................... ....... 1100-39 MATERIALS AND RESEARCH CENTER TEST METHODS (KTMR) ................................................. 1100-40 THERMOPLASTIC PAVEMENT MARKING MATERIAL ........................................................................... 2200-15 THIRD PARTY BENEFICIARY ......................................................................................................................... 100-64 THIRD PARTY PERMITS AND RESTORING WORK AREAS DAMAGED BY THIRD-PARTY PERMITS ............................................................................................................................................... 100-31 TIE BAR INSERTION – REPAIR NEW PCCP .................................................................................................. 500-43 TIES, RIDERS AND ALTERNATE BIDS, COMBINATION BIDS, ................................................................ 100-13 TIME EXTENSIONS IN THE CONTRACT ADJUSTMENT REQUEST ......................................................... 100-30 TOPSOIL .............................................................................................................................................................. 900-17 TOPSOIL (Materials) ........................................................................................................................................... 2100-1 TRAFFIC CONTROL See WORK ZONE TRAFFIC CONTROL AND SAFETY ............................................ 800-13 TRAFFIC SIGNALS, ELECTRIC LIGHTING SYSTEMS AND ....................................................................... 800-44 TRAFFIC SIGNAL EQUIPMENT, ELECTRIC LIGHTING AND (Materials) ................................................. 1700-4 TRAFFIC THROUGH CONSTRUCTION, HANDLING ................................................................................... 100-32 TRANSPORTING SALVAGEABLE MATERIAL .......................................................................................... 800-112 TREES, SHRUBS AND OTHER PLANTS ......................................................................................................... 900-19 SUBJECT INDEX I-27 U ULTRATHIN BONDED ASPHALT SURFACE ................................................................................................ 600-68 UNACCEPTABLE WORK; UNAUTHORIZED WORK, CONFORMING WITH PLANS AND SPECIFICATIONS ....................................................................................................................................... 100-39 UNCLASSIFIED EXCAVATION ....................................................................................................................... 200-13 UNDERDRAINS, CLEANING EXISTING STRUCTURES AND .................................................................. 800-110 UNDERDRAINS.................................................................................................................... .............................. 800-63 UNDERSEALING ............................................................................................................................................... 800-90 UNKNOWN HAZARDOUS MATERIALS ........................................................................................................ 100-59 USES OF PIPE ..................................................................................................................................................... 1900-1 V VALUE ENGINEERING OR COST REDUCTION PROPOSAL ..................................................................... 100-47 W WARM MIX ADDITIVES (Materials) ................................................................................................................ 1200-3 WARNING LIGHTS ............................................................................................................................................ 1700-7 WATER BORNE ACRYLIC FINISH COAT ..................................................................................................... 1800-8 WATER FOR MISCELLANEOUS USES .......................................................................................................... 2400-2 WATER FOR USE WITH CEMENT .................................................................................................................. 2400-1 WATER POLLUTION CONTROL MANAGER .................................................................................................. 900-1 WATER SYSTEMS ............................................................................................................................................. 900-28 WEED CONTROL FABRIC ............................................................................................................................. 2100-19 WELDED STEEL WIRE FABRIC FOR CONCRETE REINFORCEMENT ..................................................... 1600-7 WELDED STUD SHEAR CONNECTORS ...................................................................................................... 1600-28 WITHDRAWING PROPOSALS BEFORE THE LETTING .............................................................................. 100-17 WITHDRAWING PROPOSALS FOR BID MISTAKES AFTER THE LETTING ............................................ 100-17 WOOD FENCE POSTS ....................................................................................................................................... 2300-6 WOOD POSTS ..................................................................................................................................................... 2300-1 WORK CLASSIFICATIONS OF WORK (PREQUALIFYING CONTRACTORS) .................................................. 100-9 COMPLETING WORK EARLY-INCENTIVE AWARD ........................................................................... 100-70 CONFORMING WITH PLANS AND SPECIFICATIONS; UNACCEPTABLE WORK; UNAUTHORIZED WORK ................................................................................................................... 100-39 CONTROL OF WORK ................................................................................................................................. 100-35 EXAMINING BIDDING PROPOSAL FORM AND PROJECT SITE, INCLUDING EXPLORATORY WORK DOCUMENTS .......................................................................................................................... 100-14 EXTRA WORK .................................................................................................................... ........................ 100-26 FAILURE TO COMPLETE WORK TIMELY-LIQUIDATED DAMAGES AND DISINCENTIVE ASSESSMENTS .................................................................................................................................... 100-70 LIABILITY FOR DAMAGE TO WORK/PROJECT ................................................................................... 100-34 MAINTAINING AND PROTECTING THE WORK AND INFRASTRUCTURE ..................................... 100-30 PLANS AND WORKING DRAWINGS ...................................................................................................... 100-43 PROGRESS SCHEDULE OR NETWORK SCHEDULE ........................................................................... 100-65 SCOPE OF WORK ....................................................................................................................................... 100-24 TEMPORARY SUSPENSION OF WORK .................................................................................................. 100-26 THIRD PARTY PERMITS AND RESTORING WORK AREAS DAMAGED BY THIRD-PARTY PERMITS ............................................................................................................................................... 100-31 WORK ZONE TRAFFIC CONTROL AND SAFETY ........................................................................................ 800-13 WORKING DAY CONTRACTS ......................................................................................................................... 100-68 Z ZINC COATINGS .............................................................................................................................................. 1600-39