718 - ELASTOMERIC CONCRETE 700-94
718.1 Description
Construct elastomeric concrete acco rding to the Contract Documents.
718.2 Materials
Provide materials that comply with DIVISION 1500.
718.3 Construction Requirements
Provide the Engineer with a copy of the product manufacturer’s instructions for use of this material. Mix, transport, place and cure the elastomeric c oncrete as recommended by the material manufacturer. Provide a technical representative of the material ma nufacturer at the jobsite during the initial placement of the elastomeric concrete. The manufacturer’s representative shall provide technical expertise regarding the mixing, transporting, placement, and curing of the elastomeric conc rete. This requirement may be waived for experienced contractors. Submit request for waving a technical representative, al ong with a list of successfully completed elastomeric concrete projects, to the Engineer.
718.4 Measurement and Payment
The Engineer will not measure the elastomeric concrete separately; it will be subsidiary to other items of the contract.
Get an email when 718 changes
Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.