743 – ROLLED BEAM DETOUR BRIDGE 700-152
743.1 Description
Erect and Remove or Furnish the Rolled Beam Detour Bridge as shown in the Contract Documents. B I D I T E M S U N I T S Erect and Remove Rolled Beam Detour Bridge Lump Sum Furnish Rolled Beam Detour Bridge Lump Sum
743.2 Materials
Use material complying with the details shown in the Contract Documents. The Engineer will accept the material on the basis of compliance with dimensional requirements, condition, and visual inspection at the point of usage.
743.3 Construction Requirements
Construct the rolled beam detour bridge as shown on the Contract Documents.
743.4 Measurement and Payment
The Engineer will measure the erect and remove rolled beam detour br idge and furnish rolled beam detour bridge by the Lump Sum. Payment for "Erect and Remove Rolled Beam Detour Br idge" and "Furnish Rolled Beam Detour Bridge" at the contract unit price is full compensation for the specified work. The Engineer will pay for Erect and Remove Rolled Beam Detour Bridge according to TABLE 743-1. TABLE 743-1: PAYMENT FOR ERECT AND REMOVE ROLLED BEAM DETOUR BRIDGE Pay % of Contract Unit Price Milestone 75 Erection of the structure has been completed. When the structure has been dismantled and all the parts to be returned have been properly inventoried and stockpiled at the storage site listed in the Contract Documents.
Get an email when 743 changes
Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.