Division 800 — Incidental Construction

820Flume Inlets and Slope Drains

KS · 2015 Standard Specifications✓ Full text on BuildSpecBook pages 552–552 Save this section

Ask about Section 820

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

820 - FLUME INLETS AND SLOPE DRAINS 800-61

820.1 Description

Construct the designated type of flume inlets and slope drains as shown in the Contract Documents. B I D I T E M S U N I T S F l u m e I n l e t ( * ) E a c h S l o p e D r a i n ( * ) L i n e a r F o o t Slope Drain (Special) Linear Foot *Type: concrete, gr outed stone or stone

820.2 Materials

Provide materials that comply with the applicable requirements. Concrete and Grout ............................................................................................... SECTIONS 401 & 402 Aggregates for Concrete Not On Grade ................................................................ SECTION 1102 Stone for Flume Inlets and Slope Drains ............................................................... DIVISION 1100 Type 2 Liquid Membrane-Forming Compound .................................................... DIVISION 1400 Reinforcing Steel ................................................................................................... DIVISION 1600 Welded Steel Wire Fabric ..................................................................................... DIVISION 1600

820.3 Construction Requirements

a. Concrete. Construct flume inlets and slope drains as shown in the Contract Documents. Excavate to allow construction of forms and excavate to sufficient depth to obtain the designated thickness, elevation and grade. Prior to concrete placement, place reinforcement for conc rete inlets and drains as shown in the Contract Documents. Support reinforcement on bar chairs. Unless shown otherwise in the Contract Documents, construct concrete flume inlets and slope drains of Grade 3.0 (AE) concrete. Uniformly consolidate the concrete without voids. Cure and protect concrete according to

Division 700

b. Stone and Grouted Stone. Construct stone inlets and slope drains as shown in the Contract Documents. Place stones with ends and sides abutting. Use spalls to fill larger spaces be tween stones. Offset joints between stones with the joint in the row below. For grouted stone, pour and broom grout into spaces between stones until the spaces are completely filled. Immediat ely after the grout is placed, cure in the same manner as required for the concrete. c. Backfill. Place backfill material along the sides of the inle ts and slope drains to the top of the outside edges. Compact the backfill to a density of 90% of the standard compaction of the material used. On projects where Type B compaction is required on the adjacent roadway, construct the compaction for flume inlets and slope drains to the requirements for Type B compaction, SECTION 205.

820.4 Measurement and Payment

The Engineer will measure each flume inlet. The Engineer will measure slope drains by the linear foot along the flowline of the slope drain. Payment for "Flume Inlets" and "Slope Drains" at the contract unit prices is full compensation for the specified work.

Get an email when 820 changes

Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for State Road and Bridge Construction, 2015 Edition. Pages 552–552 of 978. View official source ↗