840Temporary Surfacing

KS · 2015 Standard Specifications✓ Full text on BuildSpecBook pages 594–594 Save this section

Ask about Section 840

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

840 - TEMPORARY SURFACING 800-103

840.1 Description

Place and maintain temporary surfacing material to provide temporary access (ingress and egress) for residences and places of businesses. Remove and dispose of material when no longer needed. B I D I T E M S U N I T S Temporary Surfacing Material (Agg regate) (Set Price) Cubic Yard Temporary Surfacing Material (HMA) (Set Price) Ton

840.2 Materials

Provide aggregate for temporary su rfacing suitable for the intended pur pose. The Engineer will accept the aggregate based on the performance of the material. Provide HMA for temporary surfacing that is a commercial mix in genera l use in the local area. Provide a mixture of materials from recognized pr oducers, mixed in a recognized type of hot mix plant. Provide emulsified asphalt for tack, when necessary. The Engineer will accept the HMA based on performance of the material.

840.3 Construction Requirements

Place and spread the temporary surfacing material at the locations determined by the Engineer. Place and spread the temporary surfacing material to a smooth, reasonable cross-section. Shape the section to prevent ponding of water. When placing HMA, use recognized equipment and techniques to weig h, haul, spread and compact the mixture. Complete the comp action operations while the temperature of the mixture is above 175°F. Do not place HMA on wet or frozen surfaces, or when the weather cond itions will prevent proper handling and finishing of the mixture. The Engineer may waive the weather limitations when warranted. Maintain the temporary surfacing to provide ingress and egress in all types of weather. Place additional material as necessary. Remove and dispose of the material when no longer necessary.

840.4 Measurement and Payment

The Engineer will measure the aggregate temporary surf acing material by the cubic yard in the vehicle at the place of unloading. The Engineer will measure the HMA temporary surfaci ng material by the ton. The Engineer will accept commercial scale tickets completed by the producer of the material. Payment for "Temporary Surfacing Material (Aggregate ) (Set Price)" and "Temporary Surfacing Material (HMA) (Set Price)" at the contract unit set prices is full compensation for the specified work. The contract unit set prices will govern regardless of the accepted quantity provided.

Get an email when 840 changes

Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for State Road and Bridge Construction, 2015 Edition. Pages 594–594 of 978. View official source ↗