510DESCRIPTION

LA · 2016 Standard SpecificationsBook pages 338341View official source ↗

Asphalt Concrete Pavement Patching, Widening and Joint Repair

510.01 DESCRIPTION. Use asphalt concrete to patch, widen and repair

joints of existing concrete pavements, asphalt concrete pavements, and composite pavements in accordance with these specifications and in conformity with the lines, grades and typical sections shown on the pl ans or as directed.

510.02 MATERIALS. Use any type of asphalt concrete mixture for

patching and widening listed in Section 502 , other than 1/2 inch nominal maximum size mixtures. For joint repair, use Incidental Paving Asphalt Concrete (Level A) complying with Section 502 . Use asphalt tack coat complying with Section 504 .

510.03 EQUIPMENT. Furnish equipment that meets the specification

requirements in Section 503 for the types of material used.

510.04 General Construction Requirements.

Remove existing surfacing and base materials by sawcutting and perfo rm all required excavation for patching and widening. Sawcuts shall be for the full depth of the pavement along the perimeter of the pavement to be removed as marked by the engineer. Sawcuts shall be made with a diamond bladed concrete concrete saw for t he full depth of patch if patching is performed on the final riding surface. Patching performed on underlying surface can be full depth sawed with a rock saw or milled out with a roto - mill or stabilizer, unless otherwise specified in plans. When through traffic is maintained, place the pavement widening material, or fill and compact open areas or trenches at the end of each day's operations. Under -thickness in excess of 1/2 inch will be corrected at no direct pay. Excavate and dispose of the excess mater ial beyond the right -of-way in accordance with Section 202 at no direct pay. Uniformly compact the subgrade. For joint repair, clean contact surfaces of existing pa vement and apply a thin, uniform layer of approved asphalt tack coat prior to placing asphalt mixture in the joint. Asphalt Concrete Pavement Patching, Widening and Joint Repair

510.01 DESCRIPTION. Use asphalt concrete to patch, widen and repair

joints of existing concrete pavements, asphalt concrete pavements, and composite pavements in accordance with these specifications and in conformity with the lines, grades and typical sections shown on the pl ans or as directed.

510.02 MATERIALS. Use any type of asphalt concrete mixture for

patching and widening listed in Section 502 , other than 1/2 inch nominal maximum size mixtures. For joint repair, use Incidental Paving Asphalt Concrete (Level A) complying with Section 502 . Use asphalt tack coat complying with Section 504 .

510.03 EQUIPMENT. Furnish equipment that meets the specification

requirements in Section 503 for the types of material used.

510.04 General Construction Requirements.

Remove existing surfacing and base materials by sawcutting and perfo rm all required excavation for patching and widening. Sawcuts shall be for the full depth of the pavement along the perimeter of the pavement to be removed as marked by the engineer. Sawcuts shall be made with a diamond bladed concrete concrete saw for t he full depth of patch if patching is performed on the final riding surface. Patching performed on underlying surface can be full depth sawed with a rock saw or milled out with a roto - mill or stabilizer, unless otherwise specified in plans. When through traffic is maintained, place the pavement widening material, or fill and compact open areas or trenches at the end of each day's operations. Under -thickness in excess of 1/2 inch will be corrected at no direct pay. Excavate and dispose of the excess mater ial beyond the right -of-way in accordance with Section 202 at no direct pay. Uniformly compact the subgrade. For joint repair, clean contact surfaces of existing pa vement and apply a thin, uniform layer of approved asphalt tack coat prior to placing asphalt mixture in the joint. Asphalt Concrete Pavement Patching, Widening and Joint Repair

510.01 DESCRIPTION. Use asphalt concrete to patch, widen and repair

joints of existing concrete pavements, asphalt concrete pavements, and composite pavements in accordance with these specifications and in conformity with the lines, grades and typical sections shown on the pl ans or as directed.

510.02 MATERIALS. Use any type of asphalt concrete mixture for

patching and widening listed in Section 502 , other than 1/2 inch nominal maximum size mixtures. For joint repair, use Incidental Paving Asphalt Concrete (Level A) complying with Section 502 . Use asphalt tack coat complying with Section 504 .

510.03 EQUIPMENT. Furnish equipment that meets the specification

requirements in Section 503 for the types of material used.

510.04 General Construction Requirements.

Remove existing surfacing and base materials by sawcutting and perfo rm all required excavation for patching and widening. Sawcuts shall be for the full depth of the pavement along the perimeter of the pavement to be removed as marked by the engineer. Sawcuts shall be made with a diamond bladed concrete concrete saw for t he full depth of patch if patching is performed on the final riding surface. Patching performed on underlying surface can be full depth sawed with a rock saw or milled out with a roto - mill or stabilizer, unless otherwise specified in plans. When through traffic is maintained, place the pavement widening material, or fill and compact open areas or trenches at the end of each day's operations. Under -thickness in excess of 1/2 inch will be corrected at no direct pay. Excavate and dispose of the excess mater ial beyond the right -of-way in accordance with Section 202 at no direct pay. Uniformly compact the subgrade. For joint repair, clean contact surfaces of existing pa vement and apply a thin, uniform layer of approved asphalt tack coat prior to placing asphalt mixture in the joint. Asphalt Concrete Pavement Patching, Widening and Joint Repair

510.01 DESCRIPTION. Use asphalt concrete to patch, widen and repair

joints of existing concrete pavements, asphalt concrete pavements, and composite pavements in accordance with these specifications and in conformity with the lines, grades and typical sections shown on the pl ans or as directed.

510.02 MATERIALS. Use any type of asphalt concrete mixture for

patching and widening listed in Section 502 , other than 1/2 inch nominal maximum size mixtures. For joint repair, use Incidental Paving Asphalt Concrete (Level A) complying with Section 502 . Use asphalt tack coat complying with Section 504 .

510.03 EQUIPMENT. Furnish equipment that meets the specification

requirements in Section 503 for the types of material used.

510.04 General Construction Requirements.

Remove existing surfacing and base materials by sawcutting and perfo rm all required excavation for patching and widening. Sawcuts shall be for the full depth of the pavement along the perimeter of the pavement to be removed as marked by the engineer. Sawcuts shall be made with a diamond bladed concrete concrete saw for t he full depth of patch if patching is performed on the final riding surface. Patching performed on underlying surface can be full depth sawed with a rock saw or milled out with a roto - mill or stabilizer, unless otherwise specified in plans. When through traffic is maintained, place the pavement widening material, or fill and compact open areas or trenches at the end of each day's operations. Under -thickness in excess of 1/2 inch will be corrected at no direct pay. Excavate and dispose of the excess mater ial beyond the right -of-way in accordance with Section 202 at no direct pay. Uniformly compact the subgrade. For joint repair, clean contact surfaces of existing pa vement and apply a thin, uniform layer of approved asphalt tack coat prior to placing asphalt mixture in the joint. 313 Patch and widen with asphalt concrete conforming to Section 502 except that priming of the subgrade will not be required. Clean contact surfaces of pavement and apply a uniform layer of approved asphalt tack coat before placement of asphalt concrete. Do not overlay patches for a minimum of 5 calendar days. Spread, finish, and compact the asphalt concrete leaving the surface smooth and slightly above the edge of existing pavement. To provide lateral support, the contractor may construct temporary berms of excavated material against the outside edge of widening strips prior to rolling. If outside edges of widening strips are not edged up by the end of the work day, place super cones or drums on a maximum of 100 -feet centers at no direct pay.

510.05 Measurement.

510.05.1 Patching: The Department will measure patching of

pavement by the square yard or ton of existing pavement designated to be removed and replaced. Saw -cutting, removal of existing surfacing, base course, required excavation, and application of tack coat will not be measured for payment.

510.05.2 Widening: The quantities of widening for payment will be

the design areas in square yards or ton as shown on the plans and adjustments thereto. Adjust design quantities if the engineer makes changes to adjust to field conditions. Design quantities are based on the horizontal dimensions shown on the plans. No measurement for payment will be made for widening placed outside the dimensions shown on the plans or established by the engineer. Required excavation, removal of existing pavement and base course, asphalt tack c oat and disposal of removed material will not be measured for payment. Measure the thickness and width in accordance with DOTD TR 602.

510.05.3 Joint Repair: The Department will measure joint repair by

the ton of asphalt concrete used to fill the joint. Measur ement will be made in accordance with 502.14 .

510.06 Payment.

510.06.1 Patching : Payment for pavement patching will be made at

the contract unit prices per square yard or ton, s ubject to the following provisions: 313 Patch and widen with asphalt concrete conforming to Section 502 except that priming of the subgrade will not be required. Clean contact surfaces of pavement and apply a uniform layer of approved asphalt tack coat before placement of asphalt concrete. Do not overlay patches for a minimum of 5 calendar days. Spread, finish, and compact the asphalt concrete leaving the surface smooth and slightly above the edge of existing pavement. To provide lateral support, the contractor may construct temporary berms of excavated material against the outside edge of widening strips prior to rolling. If outside edges of widening strips are not edged up by the end of the work day, place super cones or drums on a maximum of 100 -feet centers at no direct pay.

510.05 Measurement.

510.05.1 Patching: The Department will measure patching of

pavement by the square yard or ton of existing pavement designated to be removed and replaced. Saw -cutting, removal of existing surfacing, base course, required excavation, and application of tack coat will not be measured for payment.

510.05.2 Widening: The quantities of widening for payment will be

the design areas in square yards or ton as shown on the plans and adjustments thereto. Adjust design quantities if the engineer makes changes to adjust to field conditions. Design quantities are based on the horizontal dimensions shown on the plans. No measurement for payment will be made for widening placed outside the dimensions shown on the plans or established by the engineer. Required excavation, removal of existing pavement and base course, asphalt tack c oat and disposal of removed material will not be measured for payment. Measure the thickness and width in accordance with DOTD TR 602.

510.05.3 Joint Repair: The Department will measure joint repair by

the ton of asphalt concrete used to fill the joint. Measur ement will be made in accordance with 502.14 .

510.06 Payment.

510.06.1 Patching : Payment for pavement patching will be made at

the contract unit prices per square yard or ton, s ubject to the following provisions: 313 Patch and widen with asphalt concrete conforming to Section 502 except that priming of the subgrade will not be required. Clean contact surfaces of pavement and apply a uniform layer of approved asphalt tack coat before placement of asphalt concrete. Do not overlay patches for a minimum of 5 calendar days. Spread, finish, and compact the asphalt concrete leaving the surface smooth and slightly above the edge of existing pavement. To provide lateral support, the contractor may construct temporary berms of excavated material against the outside edge of widening strips prior to rolling. If outside edges of widening strips are not edged up by the end of the work day, place super cones or drums on a maximum of 100 -feet centers at no direct pay.

510.05 Measurement.

510.05.1 Patching: The Department will measure patching of

pavement by the square yard or ton of existing pavement designated to be removed and replaced. Saw -cutting, removal of existing surfacing, base course, required excavation, and application of tack coat will not be measured for payment.

510.05.2 Widening: The quantities of widening for payment will be

the design areas in square yards or ton as shown on the plans and adjustments thereto. Adjust design quantities if the engineer makes changes to adjust to field conditions. Design quantities are based on the horizontal dimensions shown on the plans. No measurement for payment will be made for widening placed outside the dimensions shown on the plans or established by the engineer. Required excavation, removal of existing pavement and base course, asphalt tack c oat and disposal of removed material will not be measured for payment. Measure the thickness and width in accordance with DOTD TR 602.

510.05.3 Joint Repair: The Department will measure joint repair by

the ton of asphalt concrete used to fill the joint. Measur ement will be made in accordance with 502.14 .

510.06 Payment.

510.06.1 Patching : Payment for pavement patching will be made at

the contract unit prices per square yard or ton, s ubject to the following provisions: 313 Patch and widen with asphalt concrete conforming to Section 502 except that priming of the subgrade will not be required. Clean contact surfaces of pavement and apply a uniform layer of approved asphalt tack coat before placement of asphalt concrete. Do not overlay patches for a minimum of 5 calendar days. Spread, finish, and compact the asphalt concrete leaving the surface smooth and slightly above the edge of existing pavement. To provide lateral support, the contractor may construct temporary berms of excavated material against the outside edge of widening strips prior to rolling. If outside edges of widening strips are not edged up by the end of the work day, place super cones or drums on a maximum of 100 -feet centers at no direct pay.

510.05 Measurement.

510.05.1 Patching: The Department will measure patching of

pavement by the square yard or ton of existing pavement designated to be removed and replaced. Saw -cutting, removal of existing surfacing, base course, required excavation, and application of tack coat will not be measured for payment.

510.05.2 Widening: The quantities of widening for payment will be

the design areas in square yards or ton as shown on the plans and adjustments thereto. Adjust design quantities if the engineer makes changes to adjust to field conditions. Design quantities are based on the horizontal dimensions shown on the plans. No measurement for payment will be made for widening placed outside the dimensions shown on the plans or established by the engineer. Required excavation, removal of existing pavement and base course, asphalt tack c oat and disposal of removed material will not be measured for payment. Measure the thickness and width in accordance with DOTD TR 602.

510.05.3 Joint Repair: The Department will measure joint repair by

the ton of asphalt concrete used to fill the joint. Measur ement will be made in accordance with 502.14 .

510.06 Payment.

510.06.1 Patching : Payment for pavement patching will be made at

the contract unit prices per square yard or ton, s ubject to the following provisions: 313 Patch and widen with asphalt concrete conforming to Section 502 except that priming of the subgrade will not be required. Clean contact surfaces of pavement and apply a uniform layer of approved asphalt tack coat before placement of asphalt concrete. Do not overlay patches for a minimum of 5 calendar days. Spread, finish, and compact the asphalt concrete leaving the surface smooth and slightly above the edge of existing pavement. To provide lateral support, the contractor may construct temporary berms of excavated material against the outside edge of widening strips prior to rolling. If outside edges of widening strips are not edged up by the end of the work day, place super cones or drums on a maximum of 100 -feet centers at no direct pay.

510.05 Measurement.

510.05.1 Patching: The Department will measure patching of

pavement by the square yard or ton of existing pavement designated to be removed and replaced. Saw -cutting, removal of existing surfacing, base course, required excavation, and application of tack coat will not be measured for payment.

510.05.2 Widening: The quantities of widening for payment will be

the design areas in square yards or ton as shown on the plans and adjustments thereto. Adjust design quantities if the engineer makes changes to adjust to field conditions. Design quantities are based on the horizontal dimensions shown on the plans. No measurement for payment will be made for widening placed outside the dimensions shown on the plans or established by the engineer. Required excavation, removal of existing pavement and base course, asphalt tack c oat and disposal of removed material will not be measured for payment. Measure the thickness and width in accordance with DOTD TR 602.

510.05.3 Joint Repair: The Department will measure joint repair by

the ton of asphalt concrete used to fill the joint. Measur ement will be made in accordance with 502.14 .

510.06 Payment.

510.06.1 Patching : Payment for pavement patching will be made at

the contract unit prices per square yard or ton, s ubject to the following provisions: 313 Patch and widen with asphalt concrete conforming to Section 502 except that priming of the subgrade will not be required. Clean contact surfaces of pavement and apply a uniform layer of approved asphalt tack coat before placement of asphalt concrete. Do not overlay patches for a minimum of 5 calendar days. Spread, finish, and compact the asphalt concrete leaving the surface smooth and slightly above the edge of existing pavement. To provide lateral support, the contractor may construct temporary berms of excavated material against the outside edge of widening strips prior to rolling. If outside edges of widening strips are not edged up by the end of the work day, place super cones or drums on a maximum of 100 -feet centers at no direct pay.

510.05 Measurement.

510.05.1 Patching: The Department will measure patching of

pavement by the square yard or ton of existing pavement designated to be removed and replaced. Saw -cutting, removal of existing surfacing, base course, required excavation, and application of tack coat will not be measured for payment.

510.05.2 Widening: The quantities of widening for payment will be

the design areas in square yards or ton as shown on the plans and adjustments thereto. Adjust design quantities if the engineer makes changes to adjust to field conditions. Design quantities are based on the horizontal dimensions shown on the plans. No measurement for payment will be made for widening placed outside the dimensions shown on the plans or established by the engineer. Required excavation, removal of existing pavement and base course, asphalt tack c oat and disposal of removed material will not be measured for payment. Measure the thickness and width in accordance with DOTD TR 602.

510.05.3 Joint Repair: The Department will measure joint repair by

the ton of asphalt concrete used to fill the joint. Measur ement will be made in accordance with 502.14 .

510.06 Payment.

510.06.1 Patching : Payment for pavement patching will be made at

the contract unit prices per square yard or ton, s ubject to the following provisions: 313 Patch and widen with asphalt concrete conforming to Section 502 except that priming of the subgrade will not be required. Clean contact surfaces of pavement and apply a uniform layer of approved asphalt tack coat before placement of asphalt concrete. Do not overlay patches for a minimum of 5 calendar days. Spread, finish, and compact the asphalt concrete leaving the surface smooth and slightly above the edge of existing pavement. To provide lateral support, the contractor may construct temporary berms of excavated material against the outside edge of widening strips prior to rolling. If outside edges of widening strips are not edged up by the end of the work day, place super cones or drums on a maximum of 100 -feet centers at no direct pay.

510.05 Measurement.

510.05.1 Patching: The Department will measure patching of

pavement by the square yard or ton of existing pavement designated to be removed and replaced. Saw -cutting, removal of existing surfacing, base course, required excavation, and application of tack coat will not be measured for payment.

510.05.2 Widening: The quantities of widening for payment will be

the design areas in square yards or ton as shown on the plans and adjustments thereto. Adjust design quantities if the engineer makes changes to adjust to field conditions. Design quantities are based on the horizontal dimensions shown on the plans. No measurement for payment will be made for widening placed outside the dimensions shown on the plans or established by the engineer. Required excavation, removal of existing pavement and base course, asphalt tack c oat and disposal of removed material will not be measured for payment. Measure the thickness and width in accordance with DOTD TR 602.

510.05.3 Joint Repair: The Department will measure joint repair by

the ton of asphalt concrete used to fill the joint. Measur ement will be made in accordance with 502.14 .

510.06 Payment.

510.06.1 Patching : Payment for pavement patching will be made at

the contract unit prices per square yard or ton, s ubject to the following provisions: 314 Payment adjustments for deficiencies in asphalt concrete and asphalt materials will be applied at 1/2 the contract unit price for pavement patching. Asphalt concrete will be subject to the payment adjustment provisions o f Section 502 , Table 502 -7 with 4 -inch cores allowed. When the engineer orders additional thickness of patching in excess of plan thickness, payment for the additi onal thickness will be made as follows. When patching is on a square yard basis, the value per inch thickness will be calculated by dividing the contract unit price per square yard by the plan thickness. Thickness of patches will be measured from the sur face that exists at the time of patching. Payment for the additional thickness will be made at 50 percent of the value per inch thus determined. When the engineer approves of an under -thickness of patching less than plan thickness, a deduction in payment will be made. The value per inch will be calculated by dividing the contract unit price per square yard by the plan thickness. This deduction per inch of under -thickness will be made at 50 percent of the value per inch. When payment for patching is made p er ton, no adjustment in unit price will be made for additional thickness or under -thickness. Any patching that develops or is required between the time of initial patching operations and the placement of the first lift of asphalt concrete will be paid fo r at the contract unit price. Any patching required due to base failure after placement of the first lift of asphalt concrete will be paid for at twice the contract unit price.

510.06.2 Widening : Payment for pavement widening will be made

at the contract unit price per square yard or ton. Over -widths will be accepted at no additional pay. Correct under -widths by furnishing and placing additional asphalt concrete to a minimum width of 1 foot and plan thickness at no direct pay. Payment adjustments for deficiencies in asphalt concrete and asphalt materials will be applied at 1/2 the contract unit price for pavement widening. Asphalt concrete will be subject to the payment adjustment provisions of Section 502 .

510.06.3 Joint Repair : Payment for pavement joint repair will be

made at the contract unit price per ton. Payment will be made under: 314 Payment adjustments for deficiencies in asphalt concrete and asphalt materials will be applied at 1/2 the contract unit price for pavement patching. Asphalt concrete will be subject to the payment adjustment provisions o f Section 502 , Table 502 -7 with 4 -inch cores allowed. When the engineer orders additional thickness of patching in excess of plan thickness, payment for the additi onal thickness will be made as follows. When patching is on a square yard basis, the value per inch thickness will be calculated by dividing the contract unit price per square yard by the plan thickness. Thickness of patches will be measured from the sur face that exists at the time of patching. Payment for the additional thickness will be made at 50 percent of the value per inch thus determined. When the engineer approves of an under -thickness of patching less than plan thickness, a deduction in payment will be made. The value per inch will be calculated by dividing the contract unit price per square yard by the plan thickness. This deduction per inch of under -thickness will be made at 50 percent of the value per inch. When payment for patching is made p er ton, no adjustment in unit price will be made for additional thickness or under -thickness. Any patching that develops or is required between the time of initial patching operations and the placement of the first lift of asphalt concrete will be paid fo r at the contract unit price. Any patching required due to base failure after placement of the first lift of asphalt concrete will be paid for at twice the contract unit price.

510.06.2 Widening : Payment for pavement widening will be made

at the contract unit price per square yard or ton. Over -widths will be accepted at no additional pay. Correct under -widths by furnishing and placing additional asphalt concrete to a minimum width of 1 foot and plan thickness at no direct pay. Payment adjustments for deficiencies in asphalt concrete and asphalt materials will be applied at 1/2 the contract unit price for pavement widening. Asphalt concrete will be subject to the payment adjustment provisions of Section 502 .

510.06.3 Joint Repair : Payment for pavement joint repair will be

made at the contract unit price per ton. Payment will be made under: 314 Payment adjustments for deficiencies in asphalt concrete and asphalt materials will be applied at 1/2 the contract unit price for pavement patching. Asphalt concrete will be subject to the payment adjustment provisions o f Section 502 , Table 502 -7 with 4 -inch cores allowed. When the engineer orders additional thickness of patching in excess of plan thickness, payment for the additi onal thickness will be made as follows. When patching is on a square yard basis, the value per inch thickness will be calculated by dividing the contract unit price per square yard by the plan thickness. Thickness of patches will be measured from the sur face that exists at the time of patching. Payment for the additional thickness will be made at 50 percent of the value per inch thus determined. When the engineer approves of an under -thickness of patching less than plan thickness, a deduction in payment will be made. The value per inch will be calculated by dividing the contract unit price per square yard by the plan thickness. This deduction per inch of under -thickness will be made at 50 percent of the value per inch. When payment for patching is made p er ton, no adjustment in unit price will be made for additional thickness or under -thickness. Any patching that develops or is required between the time of initial patching operations and the placement of the first lift of asphalt concrete will be paid fo r at the contract unit price. Any patching required due to base failure after placement of the first lift of asphalt concrete will be paid for at twice the contract unit price.

510.06.2 Widening : Payment for pavement widening will be made

at the contract unit price per square yard or ton. Over -widths will be accepted at no additional pay. Correct under -widths by furnishing and placing additional asphalt concrete to a minimum width of 1 foot and plan thickness at no direct pay. Payment adjustments for deficiencies in asphalt concrete and asphalt materials will be applied at 1/2 the contract unit price for pavement widening. Asphalt concrete will be subject to the payment adjustment provisions of Section 502 .

510.06.3 Joint Repair : Payment for pavement joint repair will be

made at the contract unit price per ton. Payment will be made under: Item No. Pay Item Pay Unit 510-01 Pavement Patching Square Yard 510-02 Pavement Widening Square Yard 510-03 Pavement Joint Repair Ton 510-04 Pavement Patching Ton 510-05 Pavement Widening Ton PART VI —RIGID PAVEMENT Section No. Page No. Section 601 Portland Cement Concrete Pavement ................................ ............................ 308 Section 602 Portland Cement Co ncrete Pavement Rehabilitation ................................ ..... 331

Source: Louisiana Standard Specifications for Roads and Bridges, 2016 Edition. Pages 338341 of 1,145.