B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Traffic Control

708Description

LA · 2016 Standard SpecificationsBook pages 428429View official source ↗

Right -of-Way Monuments

708.01 DESCRIPTION. Install contractor furnished right -of-way

monuments and right -of-way monument witness posts at various locations in accordance with these specifications, the project right -of-way map, the plan details, or as directed.

708.02 Materials.

708.02.1 Right -of-Way Monuments : Right -of-way monuments

shall be the type shown on the plans or an approved equal. Substitutions must be approved by the Location and Survey Section Administrator. Furnish steel stakes, 3/4 inch x 3/4 inch x 2 feet , with stainless steel identification caps as shown on the plans.

708.02.2 Right -of-Way Monument Witness Posts : Witness

posts shall be standard 6 feet in length as shown on the plans or an approved equal. Substitutions must be appro ved by the Location and Survey Section Administrator. The standard DOTD decal logo as shown on the plans shall be attached to each post by the supplier.

708.03 General Construction Requirements.

Position and set right -of-way monuments by or under the responsib le charge of a Louisiana licensed professional land surveyor. Prepare a reproducible final plat reflecting the surveyor’s location of the monuments in accordance with the right -of-way map on standard size Department plan sheet(s). Submit the final plat t o the project engineer for forwarding to the Location and Survey Section Administrator. Record the final plat in the appropriate parish courthouse(s) and provide a copy of the filing receipt(s) to the project engineer. Also provide a copy of the final pl at to the appropriate parish engineer(s) and Planning Commission(s), if applicable. Right -of-Way Monuments

708.01 DESCRIPTION. Install contractor furnished right -of-way

monuments and right -of-way monument witness posts at various locations in accordance with these specifications, the project right -of-way map, the plan details, or as directed.

708.02 Materials.

708.02.1 Right -of-Way Monuments : Right -of-way monuments

shall be the type shown on the plans or an approved equal. Substitutions must be approved by the Location and Survey Section Administrator. Furnish steel stakes, 3/4 inch x 3/4 inch x 2 feet , with stainless steel identification caps as shown on the plans.

708.02.2 Right -of-Way Monument Witness Posts : Witness

posts shall be standard 6 feet in length as shown on the plans or an approved equal. Substitutions must be appro ved by the Location and Survey Section Administrator. The standard DOTD decal logo as shown on the plans shall be attached to each post by the supplier.

708.03 General Construction Requirements.

Position and set right -of-way monuments by or under the responsib le charge of a Louisiana licensed professional land surveyor. Prepare a reproducible final plat reflecting the surveyor’s location of the monuments in accordance with the right -of-way map on standard size Department plan sheet(s). Submit the final plat t o the project engineer for forwarding to the Location and Survey Section Administrator. Record the final plat in the appropriate parish courthouse(s) and provide a copy of the filing receipt(s) to the project engineer. Also provide a copy of the final pl at to the appropriate parish engineer(s) and Planning Commission(s), if applicable. Right -of-Way Monuments

708.01 DESCRIPTION. Install contractor furnished right -of-way

monuments and right -of-way monument witness posts at various locations in accordance with these specifications, the project right -of-way map, the plan details, or as directed.

708.02 Materials.

708.02.1 Right -of-Way Monuments : Right -of-way monuments

shall be the type shown on the plans or an approved equal. Substitutions must be approved by the Location and Survey Section Administrator. Furnish steel stakes, 3/4 inch x 3/4 inch x 2 feet , with stainless steel identification caps as shown on the plans.

708.02.2 Right -of-Way Monument Witness Posts : Witness

posts shall be standard 6 feet in length as shown on the plans or an approved equal. Substitutions must be appro ved by the Location and Survey Section Administrator. The standard DOTD decal logo as shown on the plans shall be attached to each post by the supplier.

708.03 General Construction Requirements.

Position and set right -of-way monuments by or under the responsib le charge of a Louisiana licensed professional land surveyor. Prepare a reproducible final plat reflecting the surveyor’s location of the monuments in accordance with the right -of-way map on standard size Department plan sheet(s). Submit the final plat t o the project engineer for forwarding to the Location and Survey Section Administrator. Record the final plat in the appropriate parish courthouse(s) and provide a copy of the filing receipt(s) to the project engineer. Also provide a copy of the final pl at to the appropriate parish engineer(s) and Planning Commission(s), if applicable. Right -of-Way Monuments

708.01 DESCRIPTION. Install contractor furnished right -of-way

monuments and right -of-way monument witness posts at various locations in accordance with these specifications, the project right -of-way map, the plan details, or as directed.

708.02 Materials.

708.02.1 Right -of-Way Monuments : Right -of-way monuments

shall be the type shown on the plans or an approved equal. Substitutions must be approved by the Location and Survey Section Administrator. Furnish steel stakes, 3/4 inch x 3/4 inch x 2 feet , with stainless steel identification caps as shown on the plans.

708.02.2 Right -of-Way Monument Witness Posts : Witness

posts shall be standard 6 feet in length as shown on the plans or an approved equal. Substitutions must be appro ved by the Location and Survey Section Administrator. The standard DOTD decal logo as shown on the plans shall be attached to each post by the supplier.

708.03 General Construction Requirements.

Position and set right -of-way monuments by or under the responsib le charge of a Louisiana licensed professional land surveyor. Prepare a reproducible final plat reflecting the surveyor’s location of the monuments in accordance with the right -of-way map on standard size Department plan sheet(s). Submit the final plat t o the project engineer for forwarding to the Location and Survey Section Administrator. Record the final plat in the appropriate parish courthouse(s) and provide a copy of the filing receipt(s) to the project engineer. Also provide a copy of the final pl at to the appropriate parish engineer(s) and Planning Commission(s), if applicable. Right -of-Way Monuments

708.01 DESCRIPTION. Install contractor furnished right -of-way

monuments and right -of-way monument witness posts at various locations in accordance with these specifications, the project right -of-way map, the plan details, or as directed.

708.02 Materials.

708.02.1 Right -of-Way Monuments : Right -of-way monuments

shall be the type shown on the plans or an approved equal. Substitutions must be approved by the Location and Survey Section Administrator. Furnish steel stakes, 3/4 inch x 3/4 inch x 2 feet , with stainless steel identification caps as shown on the plans.

708.02.2 Right -of-Way Monument Witness Posts : Witness

posts shall be standard 6 feet in length as shown on the plans or an approved equal. Substitutions must be appro ved by the Location and Survey Section Administrator. The standard DOTD decal logo as shown on the plans shall be attached to each post by the supplier.

708.03 General Construction Requirements.

Position and set right -of-way monuments by or under the responsib le charge of a Louisiana licensed professional land surveyor. Prepare a reproducible final plat reflecting the surveyor’s location of the monuments in accordance with the right -of-way map on standard size Department plan sheet(s). Submit the final plat t o the project engineer for forwarding to the Location and Survey Section Administrator. Record the final plat in the appropriate parish courthouse(s) and provide a copy of the filing receipt(s) to the project engineer. Also provide a copy of the final pl at to the appropriate parish engineer(s) and Planning Commission(s), if applicable.

708.04 MEASUREMENT. Right -of-way monuments will be measured

per each. Right -of-way monument witness posts will be measured per each.

708.05 PAYMENT. Payment for right -of-way monume nts and right -of-

way monument witness posts will be made at the contract unit price per each. Payment will be made under: Item No. Pay Item Pay Unit 708-01 Right -of-Way Monument Each 708-02 Right -of-Way Monument Witness Post Each

708.04 MEASUREMENT. Right -of-way monuments will be measured

per each. Right -of-way monument witness posts will be measured per each.

708.05 PAYMENT. Payment for right -of-way monume nts and right -of-

way monument witness posts will be made at the contract unit price per each. Payment will be made under: Item No. Pay Item Pay Unit 708-01 Right -of-Way Monument Each 708-02 Right -of-Way Monument Witness Post Each

708.04 MEASUREMENT. Right -of-way monuments will be measured

per each. Right -of-way monument witness posts will be measured per each.

708.05 PAYMENT. Payment for right -of-way monume nts and right -of-

way monument witness posts will be made at the contract unit price per each. Payment will be made under: Item No. Pay Item Pay Unit 708-01 Right -of-Way Monument Each 708-02 Right -of-Way Monument Witness Post Each Section 709 Steel Cattle Guards

709.01 DESCRIPTION. Construct, furnish, and install welded steel

cattle guards at the locations shown on the plans and conforming to plan details and these specifications. Cattle guards of types different from those shown on the plans may be furnished with prior approval.

709.02 MATERIALS. Materials shall comply with the following

sections and subsections: Concrete (Class M) Section 901 Steel Pipe (Wingwalls) 1007.11 Reinforcing Steel 1009.01 Bolts, Nuts and Washers 1010.11 Treated Timber Secti on 1014 Use the minimum size steel specified and fabricate in accordance with Section 809 . Pipe wings shall be 2 -inch diameter standard strength steel pipe. Paint steel in accordance with Section 811 . Galvanized pipe will not require painting. Repair damaged galvanized steel in accordance with

811.08 .

709.03 CONSTRUCTION REQUIRE MENTS. Extend excavatio n a

minimum of 12 inches outside neat lines of concrete walls or footings. Deposit backfill in layers not exceeding 6 inches compacted thickness and compact each layer to the density of adjacent soil with mechanical tampers. When placing the cattle guard in the roadway, the compaction requirements shall conform to 203.07 . Place concrete and reinforcing steel in accordance with Section 805 and Section 806 .

Source: Louisiana Standard Specifications for Roads and Bridges, 2016 Edition. Pages 428429 of 1,145.