DESCRIPTION

280.20: General

This work shall consist of the construction of waterways in accordance with these specifications and in close conformity with the lines and grades shown on the plans or established by the Engineer. MATERIALS

280.40: General

Materials shall meet the requirements specified in the following Subsections of Division III , Materials. Gravel Borrow ............................................................................................................................... M1.03.0 Type b Hot Mix Asphalt ............................................................................................................................ M3.07.00 Cement Concrete .......................................................................................................................... M4.02.00 Preformed Expansion Joint Filler .......................................................................................... M9.14.0 Welded Steel Wire Fabric ......................................................................................................... M8.01.2 Load Transfer Assembly ........................................................................................................... M8.14.0 Lubricant ......................................................................................................................................... M8.14.0 CONSTRUCTION METHODS

280.60: General

A.Excavation

(See 140.60: General).

B.Foundation.

The gravel may be placed in one layer and compacted (See 401.60: Gravel Sub -base ).

280.61: Hot Mix Asphalt Waterways

Bituminous mixture shall be spread in two courses on the prepared gravel base and compacted by tamping or rolling. II.74 202 4 Edition 280.62: Cement Concrete Paving (Waterways) The cement concrete shall be mixed, placed, finished, protected and cured in conformity with requirements of Subsection 901: Cement Concrete, except that consolidation of the cement concrete in paved waterways may be accomplished by rodding, without vibration. COMPENSATION

280.80: Method of Measurement

The actual area of the exposed surfaces will be measured on paved waterways.

280.81: Basis of Payment

The paving of waterways, together with the construction of a gravel foundation, fine grading and compacting, will be paid for at the contract unit price per square yard, respectively, under the item for Hot Mix Asphalt or Cement Concrete Paving, complete in place. Excavation (except rock) will be paid for at the contract unit price per cubic yard under the item for Class A Trench Excavation as specified in 140.81: Basis of Payment. Rock Excavation will be paid for at the contract unit price per cubic yard under the item for Class B Rock Excavation if not already paid for under previous rock excavation.

280.82: Payment Items

280. Hot Mix Asphalt Waterway ...................................................................................... Square Yard 281. Cement Concrete Paving (Waterway) ................................................................ . Square Yard II.75 202 4 Edition

Get an email when 280 changes

Massachusetts revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: , Edition. View official source ↗

Ask about this section

Scoped to Massachusetts Standard Specifications for Highways and Bridges, Section 280 — WATERWAYS. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.