307 — PREFABRICATED EDGE DRAINS 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 300 DRAINAGE SECTION 307 — PREFABRICATED EDGE DRAINS

307.01 Description

Construct prefabricated edge drain systems and underdrain pipe outlets.

307.02 Materials

Outlet Pipe Section 905 Select Borrow Section 916 Prefabricated Edge Drain and Fittings Section 922

307.03 Construction

Install prefabricated edge drains according to the manufacturer's recommendations. For drains with support on only one side, place the support side away from the pavement edge. For excavated material, refer to 402.03.01.

307.03.01 Trenches for Prefabricated Edge Drains. Excavate using a trencher. Make the

trenches as narrow as possible, but no more than 10 in. Ensure that the drain is in direct contact with the pavement. Perform the excavation of the trench, placement of the edge drain, and placement of the first lift of backfill in a single continuous operation.

307.03.02 Splices. Make splices prior to placement in the trench; in accordance with the

manufacturer's recommendations and as approved by the Engineer. Solid Central Cores (unconnected two sided flow). Use crossover couplings at all splices and at 200 ft intervals.

307.03.03 Connections to Outlets. Use fittings recommended by the manufacturer.

Space outlets at 200 ft intervals and at the lowest elevation on all vertical curves. Construct outlets as specified in 306.03.04.

307.03.04 Backfilling of Trenches. Unless otherwise specified, use approved material generated

from the trenching operation. Use Select Borrow whenever additional backfill material is needed. Backfill in two layers, with the first layer being placed simultaneously with the drain, holding the drain flush against the side of the pavement. Use a vibratory shoe compactor. 307 — PREFABRICATED EDGE DRAINS 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS

307.04 Measurement and Payment

The payment will be full compensation for excavation, backfill, compaction, and for all material, labor, equipment, tools, and incidentals necessary to complete the work.

307.04.01 Prefabricated Edge Drains and Outlet Pipe will be measured and paid for at the Contract

unit price per linear foot.

307.04.02 Additional backfill material authorized by the Engineer will be measured and paid for

at the Contract unit price per cubic yard for Select Borrow Excavation.

Get an email when 307 changes

Maryland revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction and Materials, 2026 Edition. Pages 334–335 of 1,138. View official source ↗

Ask about this section

Scoped to Maryland Standard Specifications for Construction and Materials, Section 307 — Prefabricated Edge Drains. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.