Category 300 — Drainage

309Concrete Ditches

MD · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 357–358 Save this section

Ask about Section 309

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

309 — CONCRETE DITCHES 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 300 DRAINAGE SECTION 309 — CONCRETE DITCHES

309.01 Description

Construct concrete ditches and incidental toe walls.

309.02 Materials

Crusher Run Aggregate CR-6 901.01 No. 57 Aggregate 901.01 Curing Materials 902.07 Form Release Compounds 902.08 Portland Cement Concrete 902.10, Mix No. 2 Joint Sealer 911.01 Preformed Joint Filler 911.02 Borrow Section 916 Soil Stabilization Matting 920.05

309.03 Construction

309.03.01 Excavation. Excavate and prepare the subgrade as specified in Section 602. For

excavated material, refer to 402.03.01.

309.03.02 Forms. Use steel or wooden forms meeting Section 603.

309.03.03 Concrete. Mix and place as specified in Section 603.

309.03.04 Joints. Place joints no more than 15 ft apart. Use either bulkhead or weakened plane

construction joints. Either tool or saw weakened plane joints to a depth of at least 3/4 in. Place expansion joints no more than 90 ft apart and seal.

309.03.05 Cold Weather Construction and Curing. Refer to 520.03.02 for cold weather

construction and to 520.03.12 for concrete curing.

309.03.06 Backfill. After the forms have been removed, place and compact the backfill.

309 — CONCRETE DITCHES 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS

309.03.07 When the existing concrete ditch is removed but not replaced, regrade and stabilize the

area as directed.

309.04 Measurement and Payment

The payment will be full compensation for all concrete, excavation, forms, backfill, curing, disposal of excess or unsuitable material, toe walls, and for all material, labor, equipment, tools, and incidentals necessary to complete the work.

309.04.01 Concrete Ditches will be measured and paid for at the Contract unit price per square

yard.

309.04.02 The removal and disposal of unsuitable material below the subgrade will be measured

and paid for at the Contract unit price per cubic yard for Class 2 Excavation.

309.04.03 When Borrow or Selected Backfill using No. 57 Aggregate or Selected Backfill using

Crusher Run Aggregate CR-6 is approved by the Engineer as replacement material for the Class 2 Excavation, it will be measured and paid for at the Contract unit price per cubic yard for the pertinent items as specified in the Contract Documents.

309.04.04 Concrete Ditches removed but not replaced will be paid for at the Contract unit price

per square yard. The payment will include the cost to dispose of the material, regrading, topsoil, and soil stabilization matting.

Get an email when 309 changes

Maryland revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction and Materials, 2026 Edition. Pages 357–358 of 1,138. View official source ↗

Ask about this section

Scoped to Maryland Standard Specifications for Construction and Materials, Section 309 — Concrete Ditches. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.