Maryland Department of Transportation — State Highway Administration (MDOT SHA) · Standard Specifications for Construction and Materials
Section 508 — Milling Asphalt Pavement
Maryland Standard Specifications for Construction and Materials, Section 508. Full text, cross-references and related pay items on BuildSpec.
508 — MILLING ASPHALT PAVEMENT 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 500 PAVING SECTION 508 — MILLING ASPHALT PAVEMENT 508.01 DESCRIPTION Mill asphalt pavement. 508.02 MATERIALS Not Applicable. 508.03 CONSTRUCTION Perform roadway patching as specified in Section 505 prior to milling. Additional roadway patching may be required after milling. Quality Control Plan (QCP). Submit a Quality Control Plan for Milling to the District Engineer for approval at least 30 days prior to milling according to the Field Quality Control Plan (QCP) in 504.03. The QCP shall show…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations