705 — TURFGRASS ESTABLISHMENT 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 700 LANDSCAPING SECTION 705 — TURFGRASS ESTABLISHMENT
705.01 Description
Perform Turfgrass Establishment as follows. At Final Grade. For areas that are at final grade, establish turfgrass in topsoil or other specified soil substrate to provide permanent vegetation groundcover. Not Final Grade. For areas that are not at final grade, or areas that will not be redisturbed for at least six months after seeding operations are completed, establish turfgrass in topsoil, subsoil, common borrow, or other specified soil substrate to provide temporary vegetation groundcover. Temporary Stabilization. When it is not possible to perform Turfgrass Establishment, refer to Section 704 and perform Temporary Mulch or Temporary Seed, or as directed. Performance of Turfgrass Establishment as specified herein complies with all requirements of the Maryland Department of the Environment for permanent seeding.
705.02 Materials
Fertilizer 920.03.01 Straw Mulch 920.04.01 Wood Cellulose Fiber 920.04.02 Seed 920.06 SHA Turfgrass Seed Mix 920.06.07(a) SHA Special Purpose Seed Mix 920.06.07(b) SHA Temporary Seed Mix 920.06.07(c) Water 920.09.01
705.03 Construction
705.03.01 General.
705.03.02 Modification Request. Submit a written Modification Request to perform seeding
during Winter Seeding Season; to install an approved tackifier at manufacturer’s recommended application rates in lieu of wood cellulose fiber to secure straw mulch; or to use Type A, Type D, or Type E Soil Stabilization Matting as specified in Section 709 in lieu of straw mulch and wood cellulose fiber in areas where those mattings have not been specified. TABLE 1 - SEEDING SEASONS AND SEED MIXES SEEDING SEASON MONTH/DAY Spring Summer Fall Late Fall Winter3REGION SHA Turfgrass Seed Mix1 1 3/1 to 6/14 6/15 to 7/31 8/1 to 9/30 10/1 to 11/15 11/16 to 2/29 2 3/1 to 5/14 5/15 to 7/31 8/1 to 10/14 10/15 to 11/15 11/16 to 2/29 3 3/1 to 4/30 5/1 to 7/31 8/1 to 10/31 11/1 to 11/15 11/16 to 2/29 Plus Additive2 Plus Additive2 Plus Additive2 Notes: 1When seeding within 4 miles of a State airport: Use no additives and use SHA Special Purpose Seed Mix in lieu of SHA Turfgrass Seed Mix on slopes 4:1 and steeper, or in designated areas. 2Additive = SHA Temporary Seed Mix 3Approval is required for seeding during Winter. When approved, apply all materials except fertilizer. Refer to 705.03.06(e) 705 — TURFGRASS ESTABLISHMENT 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS The Engineer in consultation with the Landscape Programs Division will evaluate the Request. If granted, a notice of approved modification will be returned within 14 days after the request is received.
705.03.03 Application Rates. Apply materials according to Table 2.
TABLE 2 - APPLICATION RATES MATERIAL LB PER yd2 LB PER ACRE INITIAL FERTILIZER per Nutrient Management Plan a, b 20-16-12 (83% UF with MAP & SOP) 0 to 0.041 0 to 200 or one or more of the followingc 38-0-0 (UF) 0 to 0.021 0 to 100 11-52-0 (MAP) 0 to 0.036 0 to 175 0-0-50 (SOP) 0 to 0.041 0 to 200 SEED MIXES; select one SHA Turfgrass Seed Mix, applied to roadsides, facilities, and other designated areas 0.041 200 or SHA Special Purpose Seed Mix, applied to slopes 4:1 and steeper within four miles of a State airport, and other designated areas. 0.041 200 ADDITIVE SEED; when required per Table 1 SHA Temporary Seed Mix 0.006 25 STRAW MULCH 0.826 4000 WOOD CELLULOSE FIBER to secure straw mulch 0.155 750 REFERTILIZINGd 37-0-0 Sulfur Coated Urea (SCU) 0.021 100 Notes: aFor existing topsoil and salvaged topsoil, the application rates will be included in the Contract documents. For furnished topsoil, the application rates will be developed for the approved source of supply. bWhen no NMP has been developed, apply 200 lb per acre of 20-16-12 initial fertilizer. cUF = Ureaform; MAP = Monoammonium Phosphate; SOP = Sulfate of Potash. When application rate of 20-16-12 fertilizer is below 200 lb per acre, apply UF, MAP, and SOP per NMP. dRefer to 705.03.06(d) and
705.03 09(c). Apply Refertilizing
when included in the Contract documents. 705 — TURFGRASS ESTABLISHMENT 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
705.03.04 Grade Repair. Ensure that soil meets specified grades. Repair any gullies, washes, or
disturbed areas that develop before preparing soil.
705.03.05 Preparing Topsoil. Provide a uniform and porous surface that is free of debris and
weeds as follows.
705.03.06 Seeding and Initial Fertilizer.
705.03.07 Mulching. Apply mulch immediately after seeding.
705.03.08 Seeding Phase Acceptance. Submit a request for Seeding Phase Acceptance when
operations are completed. Inspection will be conducted to verify completion, and Seeding Phase Acceptance will be granted at that time.
705.03.09 Establishment Phase. The Establishment Phase will begin upon Seeding Phase
Acceptance.
705.03.01 through 705.03.07, but do not repair grade or prepare soil.
Reseeding with Slit Seeder. Perform reseeding when directed in areas where turfgrass groundcover is less than 40 percent, but soil conforms to 701.03.05 and 705.03.05. Cut the area to be reseeded to a height of 1 in. to 3 in., and remove debris that may interfere with seeding. Utilize a mechanical slit seeder to cut groves into the soil at least 0.25 in. depth. Refer to 705.03.06 and 705.03.07 and apply seed, fertilizer, and mulch, but do not secure mulch. Soil Restoration, Tilling and Reseeding. Perform soil restoration and reseeding when directed in areas where turfgrass groundcover is less than 40 percent, or when soil does not conform to 701.03.05 and 705.03.05 because eroded gullies are present or soil grades are not acceptable. Cut the area to be restored and reseeded to a height of 3 in. to 5 in. and remove debris that may interfere with seeding. Refer to 705.03.01 through
705.03.07 and repair grades, prepare soil, apply seed, fertilizer, and mulch, and secure
mulch. Mowing. Mow turfgrass in areas flatter than 4:1 before the grass grows to a height of 8 in. Use approved machinery to cut to a height of 3 in. to 5 in. 705 — TURFGRASS ESTABLISHMENT 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
705.03.10 Final Acceptance. The Engineer and the Quality Assurance Division will complete an
Inspection Report of turfgrass height, color, and percent groundcover. When it is not possible to perform the Inspection, Final Acceptance will be delayed until Inspection is possible. The Inspection Report will be included in the Punch List requirements for the project. Complete the Punch List requirements as directed. Final Acceptance will be granted after all operations have been completed, and when the seedlings of turfgrass species have grown at least 4 in. tall, exhibit dark green color, and are least 95 percent groundcover.
705.04 Measurement and Payment
Turfgrass Establishment will be measured and paid for at the Contract unit price for one or more of the specified items. The payment will be full compensation for all material, labor, equipment, tools, disposal fees and incidentals necessary to complete the work.
705.04.01 Turfgrass Establishment, including grade repair, preparing soil, applying soil
amendments and initial fertilizer in conformance with the Nutrient Management Plan, seed mixes, seed additives, mulching, securing mulch, watering, overseeding, reseeding, and mowing, will be measured and paid for at the Contract unit price per square yard. The use of other materials in conformance with an approved Modification Request shall be incidental to the Contract unit price, and will not be measured or paid for.
705.03.01 through 705.03.08 80% At Seeding Phase
Acceptance
705.03.09 (a) and (b) and
705.03 10
20% At Final Acceptance Total Payment 100%
705.04.02 Refertilizing will be measured and paid for at the Contract unit price per square yard.
705 — TURFGRASS ESTABLISHMENT 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS
705.04.03 Temporary Mulch and Temporary Seed will be measured and paid for at the
Contract unit price per square yard.