Maryland Department of Transportation — State Highway Administration (MDOT SHA) · Standard Specifications for Construction and Materials
Section 915 — Production Plants
Maryland Standard Specifications for Construction and Materials, Section 915. Full text, cross-references and related pay items on BuildSpec.
915 — PRODUCTION PLANTS 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS CATEGORY 900 MATERIALS SECTION 915 — PRODUCTION PLANTS 915.01 GENERAL These specifications are applicable to all batching and proportioning plants. 915.01.01 Approval. The plant from which the Contractor proposes to obtain material shall be approved by the Office of Materials Technology (OMT) before starting deliveries. 915.01.02 Lead Time. Notify OMT at least two working days prior to the start of operations. OMT shall be kept informed of plant operational procedures and be notified when a change is planned.…
The rest of Section 915 — Production Plants is for members
You're reading the opening of Section 915 — Production Plants. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations