Missouri Department of Transportation (MoDOT) · Missouri Standard Specifications for Highway Construction

Section 1001 — General Requirements for Material

Missouri Missouri Standard Specifications for Highway Construction, Section 1001. Full text, cross-references and related pay items on BuildSpec.

1001 GENERAL REQUIREMENTS FOR MATERIAL 1001.1 All requirements of Sec 106 will apply to material hereinafter specified. Material or processes requiring pre-qualification or pre-acceptance shall be in accordance with the applicable sections of these specifications. After approval, the material or process will be placed on either the qualified list or the pre-acceptance list (PAL) maintained on MoDOT’s web site by Construction and Materials. The contractor shall select materials or processes from the appropriate list for use in MoDOT work. Final acceptance may be based on field inspection.…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in