Division 1000 — Materials Details

1033Precast Drainage Units

MO · 2026 (Oct) Standard Specifications✓ Full text on BuildSpecBook pages 624–627 Save this section

Ask about Section 1033

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

1033.1 Scope. This specification covers precast reinforced concrete manhole and drop inlet sections and

appurtenances, such as grade rings, tops and special sections.

1033.2 Acceptance. Unless otherwise specified, the basis for acceptance shall be in accordance with Sec

1001.14 and AASHTO M 199.

1033.2.1 Lot Size Definition. A lot is defined as one day's production.

1033.2.2 Quality Control. The producer QM plan shall define quality control testing and inspection

frequencies and shall include the following minimum requirements.

1033.2.2 1 Compressive strength of cylinders or cores shall be taken at a minimum of once per lot in

accordance with AASHTO M 199. Compressive strength testing may also be performed to control handling and curing operations. Cylinders shall be cured in accordance with AASHTO T23 field curing procedures.

1033.2.2 2 Air and slump of fresh concrete shall be taken a minimum of once per lot.

1033.2.2 3 Aggregate gradation, absorption and deleterious shall be checked a minimum of once per month per

aggregate source in accordance with Sec 1005.

1033.2.2 4 Absorption samples shall be taken and tested in accordance with AASHTO M199 a minimum of

once every four months. Each sample shall be a piece broken, core drilled from the wall, having a thickness equal to the wall and free of visible cracks.

1033.2.2 5 Steel placement shall be checked and documented for each unit.

1033.2.2 6 Finished dimensions shall be checked and documented for each unit.

1033.2.2 7 Pull out testing of steps and ladders shall be checked in accordance with AASHTO M199.

1033.2.2 8 All equipment used for testing shall be maintained and calibrated in accordance with AASHTO R18

or equivalent program.

1033.2.2 9 Concrete plant(s) shall be calibrated and monitored in accordance with producer's QMP.

1033.2.3 Quality Assurance. The QMP shall reference an industry organization or define independent QA

testing frequencies including the following: Tested Propertya Test MethodIndependent QA Air T152 Twice a year Slump T119 Twice a year Coarse Aggregate Deleterious TM71 Twice a year Coarse Aggregate Absorption T85 Twice a year Compressive Strength T22 Twice a year Absorption (per mix) T280 Once a year a All samples shall be taken at the precast plant

1033.2.4 MoDOT Hold Points

1033.2.4 1 Prior to shipping, producers shall notify MoDOT and obtain a MoDOT identification number(s).

1033.2.4 2 Repair methods and completion of repairs for non-conforming work shall be approved by the

engineer and contractor.

1033.2.5 MoDOT Quality Assurance and Auditing. The engineer may perform MoDOT Quality Assurance

testing or audit the producer's QMP, documentation and production at any time, which may include coring of the precast units and the producer's expense.

1033.2.6 Deficient Work. A procedure addressing deficient work shall be in accordance with Sec 1001.14.

1033.2.6 1 Filling of form tie cavities and repair of other defects shall be in accordance with Sec 703.

1033.2.7 Non-Conforming Work. A procedure addressing non-conforming work shall be in accordance with

Sec 1001.14.

1033.3 Material.

1033.3.1 Cement. Cement shall be in accordance with Sec 1019. Fly ash or slag cement may be substituted for

cement in accordance with Sec 501.

1033.3.2 Fly Ash. Fly ash shall be in accordance with Sec 1018.

1033.3.3 Slag Cement. Slag cement shall be in accordance with Sec 1017.

1033.3.4 Aggregate. Fine and coarse aggregate shall be in accordance with Sec 1005, except that requirements

for gradation and percent passing the No. 200 sieve shall not apply.

1033.3.5 Steel Reinforcement. Reinforcement shall be in accordance with Sec 1036.

1033.3.6 Concrete Mixture. The manufacturer may designate the mixture proportions, but in no case shall the

proportion of cement in the mixture be less than 470 pounds per cubic yard of concrete. Admixtures or blends may be used with the approval from the engineer. At the option of the manufacturer, Class B or B-1 concrete may be used. If Class B or B-1 concrete is used, material, proportioning, mixing, slump and transporting of concrete shall be in accordance with Sec 501.

1033.4 Design.

1033.4.1 Precast Drainage Units. The design of precast drainage units shall be in accordance with AASHTO M

199 with the following modifications.

1033.4.1 1 Wall thickness for rectangular drop inlets shall be as shown on the plans.

1033.4.1 2 The quantity of steel reinforcement for rectangular drop inlets shall be as shown on the plans.

1033.4.2 Modified or Special Designs. The manufacturer may request approval of designs, prior to

manufacture, other than those specified in the contract documents. Special or modified designs shall be submitted to the engineer, in writing and shall fully describe any deviations from the contract documents. The description shall also include the wall thickness, all other dimensions, concrete compressive strength and the area, type, placement and strength of the steel reinforcement. Such sections shall meet all of the test and performance requirements specified by the engineer in accordance with Sec 1033.2.

1033.4.3 Reinforcement in Rectangular Drop Inlets. Placement of reinforcement in rectangular drop inlets

shall be as shown on the plans.

1033.4.4 Manhole Risers and Conical Tops. Each line of circumferential reinforcement shall be assembled

into a cage that shall contain sufficient spacer bars or members, extending through the wall of the manhole risers and conical tops, to maintain the reinforcement rigidly in shape and correct position within the form. The exposure of the ends of stirrups or spacers that have been used to position the cages during the placement of the concrete will not be cause for rejection.

1033.5 Joints. The reinforced concrete riser sections, except grade rings, shall be formed such that the risers and

top when assembled will make a continuous and uniform structure compatible with the tolerances specified for risers in AASHTO M 199. The joints shall be designed to permit placement without appreciable irregularities in the interior wall surface.

1033.6 Manufacture.

1033.6.1 Placement of Concrete. The transporting and placing of concrete shall be by methods that will

prevent the segregation of the concrete material and the displacement of the reinforcing steel from the proper position in the form.

1033.6.2 Curing.

1033.6.2 1 Precast units shall be cured in accordance with Sec 1026. Precast sections shall not be transported or

erected until the design compressive strength has been reached.

1033.6.2 2 If Class B or B-1 concrete is used, the sections shall be cured with wet burlap for 72 hours or by

covering with transparent membrane applied in accordance with Sec 502. Precast units constructed with Class B or B-1 concrete shall not be transported or erected until at least seven days after casting. If forms are removed before the expiration of the curing period, the parts of the structure exposed shall be cured as directed by the engineer.

1033.6.3 Lift Holes. Lift holes shall be in accordance with Sec 1026. If approved by the engineer, lifting hooks

or bars may be cast into the sections.

1033.6.4 Forms. Forms shall be mortar-tight and of sound material adequate to prevent distortion during

placing and curing of the concrete. Forms shall be reasonably smooth and free of loose knots, holes and other defects.

1033.6.5 Cold Weather Concreting. Concrete placed in cold weather shall be protected from freezing during

the curing period by the use of a heated, weatherproof enclosure. Concrete shall not be placed on or against reinforcing steel or other surfaces with temperatures lower than 35 F. No concrete shall be placed when the ambient temperature is below 35 F.

1033.7 Physical Test Requirements.

1033.7.1 Concrete Test Requirements. The basis for concrete test requirements shall be AASHTO M 199. The

specified number of specimens required for the tests shall be furnished without charge by the manufacturer and shall be selected at random by the engineer. The cores for compression tests shall be taken from manhole or drop inlet sections that would not otherwise be rejected under this specification. The selection shall be made at the point or points designated by the engineer.

1033.7.2 Compression Tests. Compression tests for satisfying the design concrete strength requirement may be

made on either standard rodded concrete cylinders or cylinders compacted and cured in a similar manner to the manhole or drop inlet sections or, at the option of the manufacturer, on cores drilled from the wall of the section. If compression test cylinders are being used, the manufacturer shall furnish a sufficient number of molds of a type meeting the approval from the engineer. The compressive strength of each core tested shall be equal to or greater than the design strength of the concrete. If a core does not meet the required strength, another core from the same section may be tested. If this core does not meet the required strength, that section will be rejected. Additional tests shall be made on other sections to determine the acceptability of the lot.

1033.7.3 Absorption Test Requirements. The engineer may require samples for absorption tests if concrete

other than Class B or B-1 is used. Each sample shall be a piece broken from the wall or a core drilled from the wall, have a minimum area of 9 square inches as measured on one surface of the wall, have a thickness equal to the wall and be free of visible cracks.

1033.8 Permissible Variations in Dimensions.

1033.8.1 The basis for permissible variations in dimensions shall be AASHTO M 199.

1033.8.2 The internal dimensions of precast units shall not vary more than one percent or 3/8 inch, whichever is

greater.

1033.8.3 The vertical spacing and vertical alignment between adjacent manhole steps and horizontal distance

from the inside wall to the centerline of a manhole step shall not vary more than one inch from the design dimensions.

1033.9 Steps. Steps for precast manholes and drop inlets shall be in accordance with Sec 604 and as shown on

the plans.

1033.10 Repairs. Filling of form tie cavities and repair of other defects shall be in accordance with Sec 703.

1033.11 Inspection. The quality of material, the process of manufacture and the finished precast units shall be

subject to inspection and approval by the engineer.

1033.12 Marking. Marking shall be indented into the section or shall be painted thereon with waterproof paint.

The following information shall be clearly marked on the inside of each precast unit:

a.MH for manholes or DI for drop inlets. Other units do not need a designation.
b.Date of manufacture.
c.Name or trademark of the manufacturer.

Get an email when 1033 changes

Missouri revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Missouri Standard Specifications for Highway Construction, 2026 (Oct) Edition. Pages 624–627 of 874. View official source ↗

Ask about this section

Scoped to Missouri Missouri Standard Specifications for Highway Construction, Section 1033 — Precast Drainage Units. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.